ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
2288
|
Tuesday, January 11, 2022, 11:50 |
David Wang | ITW | Maintenance | | | ITW Exit module 1 side sqaure panel O-ing seal replacement. |
Frank and I replaced ITW Exit module 1 side square service panel o-ring seal. Also, The target module pit top flange o-ring seal in ITW pit is replaced. |
2287
|
Monday, January 10, 2022, 12:38 |
David Wang | North Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from ITW to NHC. |
Travis and Nadia moved TM2 from ITW to NHC this morning. The move is smooth and successful. |
2286
|
Monday, January 10, 2022, 09:31 |
David Wang | ITE | Standard Operation | TM4 | | ITE primary and secondary vacuum vessel leak check. |
ITE primary and secondary vacuum vessel leak check has been down. Base leak rate 0.0x E-9 atm.cc/sec on LD. Only 2.8 XE-9 atm.cc/sec leak has been found on big T tank seal which is very tiny. all other seals are perfect leak free. No concern |
2285
|
Thursday, January 06, 2022, 13:54 |
David Wang | ITE | Standard Operation | TM4 | | helium pressure test on TM4 internal cooloing lsine at ITE. |
Helium pressure 70 psi. 3 minutes on each circle untill LR on LD is balanced. Base leak rate on LD:0.0xE-9 atm.cc/sec. The result:
A: slowly to1.8Xe-8atm.cc/sec after 2 minutes and balanced there.
B: slowly to 2.0XE-8 atm.cc/sec after 2 minutes and balanced there.
C: quickly response to 3.1XE-8 atm.cc/sec and balance there.
D : slowly to 3.0X E-9 atm.cc/sec and balanced there.
All others including coil1, coil 2 ,MSP, EE, HS, window are perfectly leak tight. No response on LD.
The leak rate on A,B,C,D are in low E-8 or E-9 atm.cc/sec range. They should seal cooling water without leak. No concern.
|
2284
|
Thursday, January 06, 2022, 10:37 |
David Wang | ITW | Standard Operation | TM2 | | ITW vacuum vessel and TM2 internal cooling lines leak check in pit. |
Frank and I finished ITW and TM2 leak check. TM2 internal water-cooling lines are leak free. They passed 70 psi helium pressure test. We found some small leaks on ITW primary and secondary vacuum vessel. I list them here:
- Exit module 2 service cap top plate to cap body O-ring at SW corner. Leak rate 2XE-8 atm.cc/sec. It is an old leak we found before. Solution: I sprayed high vacuum resin to leak area. It is improved to 3Xe-9atm/sec now. We can leave it there.
- Exit module 1 module to tank flange o-ring at target module side and north side. Leak rate 3XE-8atm.cc/sec. Solution: replace the o-ring. It involves in disconnect exit module 1 and remove it out. We may or may not change it. Let's check the schedule and discuss it later. We need Travis help on module moving out.
- Exit module 1 north side sqaure service panel o-ring. Leak rate 2XE-7 atm.cc/sec. Solution: replace the o-ring. It is a straight forward job. It will be done this shut down.
- Exit module 1 north side round roughing valve panel o-ring. Leak rate 8XE-9 atm.cc/sec. Solution: Replace the o-ring. It involves in disconnecting and removing ITW RV4. It could be done this shut down.
- Big T tank o-ring seal underneath the flange at exit 1 module north side . Leak rate 3XE-8 atm.cc/sec. Solution: None. All modules and module base flange have to been moved out to replace this big o-ring. It is a huge project to change this o-ring . I checked this big o-ring seal every year. It is first time a small leak is found. Maybe, we could try high vacuum resin spray first.
- Dump module flange o-ring at the side by Target module. Leak rate 8XE-9 atm.cc/sec. It cannot be confirmed since the TM o-ring is just beside it. Mostly, the leak is on dump module side. We changed TM flange o-ring every year. But we never changed dump module flange o-ring in history. Many copper cooling lines above the dump module has to be removed to remove the dump module out. I do not think we have time to do it this year. Also, the leak rate is pretty small. Maybe, we can schedule it next year.
Most these small leaks are close to turbopumps. This could be the reason the ITW vacuum on gauges are still pretty good. |
2283
|
Wednesday, January 05, 2022, 12:45 |
Frank Song | ITW | Maintenance | TM2 | UC#36 | TM2 SIS with Target and No external Connections |
electrical checked in ITW |
Attachment 1: TM2_with_UCx36.jpg
|
|
2282
|
Wednesday, January 05, 2022, 09:38 |
Frank Song | ITE | Maintenance | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
electric check done in ITE. |
Attachment 1: tm4_with_Ta#63.jpg
|
|
2281
|
Tuesday, November 30, 2021, 12:51 |
David Wang | ITE | Standard Operation | TM4 | Ta#63. | Tm4 has been connected in ITE. |
TM4 has been connected in ITE. See attachment for checklist. |
Attachment 1: from_my_cellphone_2598_647.jpg
|
|
Attachment 2: from_my_cellphone_2598_648.jpg
|
|
Attachment 3: from_my_cellphone_2598_649.jpg
|
|
Attachment 4: from_my_cellphone_2598_650.jpg
|
|
2280
|
Tuesday, November 30, 2021, 11:03 |
David Wang | ITE | Standard Operation | TM4 | Ta#63. | Remotely remove TM4(Ta#63) from TCS to ITE. |
Remotely remove TM4(Ta#63) from TCS to ITE. The move is smooth and successful. |
2279
|
Monday, November 29, 2021, 12:16 |
David Wang | Spent Target Vault | Standard Operation | | | Five spent targets have been loaded into F308s |
We loaded UCx #29 , SiC #38 , Ta#53, Ta#56 ,and Ta#57 from mini storage into F308 flasks. Later, the flasks are transferred from TH to B2 HC service area. In TH, Working area and Mini storage are cleaned and surveyed. Tools are cleaned and surveyed as well. No contamination. Mini- storage is empty now. |
2278
|
Friday, November 26, 2021, 10:52 |
Adam Newsome | Spent Target Vault | Standard Operation | | UC#35 | Spent Target Move |
The spent UC#35 target has been moved from the south hot cell to the spent target vault. It was placed in pail #264 and put in spot 6A of the vault. See attached PDF for more details. |
Attachment 1: Target_Index_2021-11-26.pdf
|
|
2277
|
Thursday, November 25, 2021, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#63. | helium pressure test on TM4 HS line at TCS. |
Helium pressure test on TM4 HS line at TCS is done. LD base leak rate 0.0 xE-9 atm.cc/sec. Helium pressure 70psi. HS line had been helium pressurized for 5 minutes during the test. No response on LD. HS line with Ta#63 is leak free. |
2276
|
Wednesday, November 24, 2021, 09:08 |
Adam Newsome | Conditioning Station | Standard Operation | TM4 | | Remotely moved TM4 from SHC to TCS |
TM4 was moved from the South Hot Cell to the Conditioning Station. |
2275
|
Wednesday, November 24, 2021, 07:17 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. |
Attachment 1: IMG_4469.JPG
|
|
2274
|
Tuesday, November 23, 2021, 10:58 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | | TM4 Move |
TM4 was moved from ITE to SHC. Shield plug installed in ITE. |
2273
|
Tuesday, November 23, 2021, 10:46 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | module disconnection |
the TM4 with UCx#35 was disconnected in ITE. |
Attachment 1: IMG_4456_(2).JPG
|
|
2272
|
Monday, November 22, 2021, 12:44 |
Adam Newsome | Crane | Repair | | | Crane PLC Fault: 0004h |
An issue was observed in which the target hall crane was not functioning: the N-E-S-W and up/down motions did not work, however the rotation motion did work. These symptoms were similar to what was observed in the past under https://elog.triumf.ca/TIS/RH-ISAC/2039 and https://elog.triumf.ca/TIS/RH-ISAC/1845
The crane control console was not powered (i.e. pressing the ON/OFF buttons when the selector switch was set to remote mode, even when safety conditions were met, did not enable/disable remote functionality). The power supplies were checked and everything appeared to be powered as would be expected, except for items which depended on the main contactor (O-K1) being energized. This contactor needs the PLC to be in an operational state, fault-free. The PLC was checked and the red fault light was flashing. The battery light was not on (i.e. battery was OK).
The program was re-downloaded to the PLC. During an attempt to go online with the PLC, error code 0004h appeared (see attached image for description). This is an unfamiliar error code - typically the aforementioned symptoms arise due to a battery failure and the program being lost. In this case it is uncertain at this time what the cause of this fault is. It will be monitored in the future to determine if it occurs again, and further investigation will be performed.
After re-downloading the program and placing the PLC in RUN mode, the crane was fully restored to its operating state - the main contactor was able to be energized once again. The crane was put into remote mode and a brief functionality test on the motion axes was performed: OK.
|
Attachment 1: Fault_code_when_connecting_Nov_22_2021.png
|
|
2271
|
Friday, November 19, 2021, 12:48 |
Adam Newsome | South Hot-Cell | Development | | | Vertical motion limit switch installation |
A rotary limit switch was installed, attached to the shaft adjacent to the drive motor for the vertical drive system. This limit switch is not yet wired to the control system and operational - this will be done at a future date and the e-log will be updated.
Relevant electrical drawings: IRH2083 to IRH2085
Edit (2022-03-02): see e-log https://elog.triumf.ca/TIS/RH-ISAC/2309 |
Attachment 1: PXL_20211119_172142852.jpg
|
|
2270
|
Thursday, November 18, 2021, 09:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#38 and UC#29 | Spent Target Move |
The spent targets SiC#38 and UC#29 have been removed from the spent target vault and placed into the mini storage. See attached PDF for details. |
Attachment 1: Target_Index_2021-11-18.pdf
|
|
Attachment 2: Target_Index_2021-11-18_mini_vault.pdf
|
|
2269
|
Wednesday, November 17, 2021, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#57 | Repacking of the targets. |
Ta#57 was repacked and placed in the mini vault. The pail was changed from #174 to #263. See attached PDF for more details. |
Attachment 1: Target_Index_2021-11-17.pdf
|
|
Attachment 2: Target_Index_2021-11-17_mini_vault.pdf
|
|