  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  521   Wednesday, October 23, 2013, 09:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#7module moveTM#1 with UC #7 has been moved from the
south west silo to the south hot cell.
  
  523   Thursday, October 24, 2013, 11:31 Travis CaveSpent Target VaultStandard Operation UC#7Spent target moveUC #7 has been moved from the south hot
cell to the spent target vault, it was placed
in pail #110 and put in slot 8B of the vault,
 Vault_Storage_October_24_2013.pdf 
  384   Tuesday, June 25, 2013, 13:20 Travis CaveSouth Hot-CellStandard OperationTM1UC#6Electrical checkResults from the electrical check of TM#1
with the UC#6 target. See attached PDF.
 TM#1_UC#6_SIS_Target_Elec_Chk.PDF 
  385   Tuesday, June 25, 2013, 14:24 Travis CaveConditioning StationStandard OperationTM1UC#6module moveModule moves of TM#1 with Ta#39 from ITW
to SHC then TM#1 with UCx#6 from SHC to the
conditioning station moves went well.
  
  392   Tuesday, July 02, 2013, 10:58 Travis CaveConditioning StationStandard OperationTM1UC#6module moveTM#1 with UC#6 has been moved from the
conditioning station to the west target station,
move went well.
  
  428   Tuesday, August 27, 2013, 11:54 Travis CaveSouth Hot-CellStandard OperationTM1UC#6module moveTM#1 with UCx #6 has been moved to the
south hot cell.
  
  432   Wednesday, August 28, 2013, 14:17 Travis CaveSouth Hot-CellStandard Operation UC#6Spent target moveSpent target move, UC#6 has been moved
from the south hot cell to the target storage.
The target is in pail 108 and in slot 8C
 Vault_Storage_August_28_2013.pdf 
  2802   Wednesday, May 07, 2025, 13:41 Aaron TamNorth Hot-CellStandard OperationTM2UC#49 UC#49 SIS w/ Gasline InstallMay 7th, 2025 - Aaron Schmidt, Aaron Tam 
UC#49 Handover - good
 Cable_hopped_on_East_Manip.jpgunsuccessful_method_1.jpgunsuccessful_method_2.jpgGasline_Gasket_installed.jpg 
  2807   Friday, May 16, 2025, 10:36 Frank SongITWStandard OperationTM2UC#49 Module Connection TM2 with UC#49 Febiad is connected
in ITW. Form attached.
 TM2_with_UC#49_connection_in_ITW_2025-05-15.pdf 
  2801   Tuesday, May 06, 2025, 14:40 Frank SongNorth Hot-CellStandard OperationTM2UC#49electrical check/leak check TM2 with new target UC#49 installed
is E/L checked on the flange of NHC in TH.
see attachment for detail.
 TM2_with_UC#49_electric_check_on_NHC_2025-05-06.pdf 
  2816   Wednesday, June 18, 2025, 11:23 Aaron TamNorth Hot-CellStandard OperationTM4UC#48 Pail#303UC#48 Removal from TM4, PIE, Spent Target Pail Loading June 17th, 2025 - Aaron Tam,
Brady Borrmann, David Wang, Travis Cave
UC#48 Removal 10:20am - 11:35am
 14x 
  2806   Wednesday, May 14, 2025, 09:45 Frank Song5 Shielding BlocksStandard OperationTM4UC#48 IGLISshielding blocks transfer 5 shielding blocks have been transferred
to ITE from storage area, the WP#I2025-05-14-2.
  
  2793   Thursday, April 24, 2025, 11:33 Travis CaveConditioning StationStandard Operation UC#48Module move TM4 with UC48 went on a long trip
from the north hot cell to the conditioning
station.
  
  2794   Thursday, April 24, 2025, 12:53 Aaron TamNorth Hot-CellStandard OperationTM4UC#48UC#48 IGLIS Install onto TM4C. Fisher, A. Schmidt, A. Tam
UC#48 Handover satisfactory

    Target taken out of glovebox
 Misaligned_target_leg.jpg86b48e1a-3507-4650-864b-841e638ab62e.jpg 
  2797   Thursday, May 01, 2025, 09:33 Travis CaveITEStandard OperationTM4UC#48Module move TM#4 with UC#48 went from the conditioning
station  to the east target station.
  
  2812   Tuesday, June 17, 2025, 11:32 Adam NewsomeNorth Hot-CellStandard OperationTM4UC#48Module moveTM#4 with UC#48 was moved from the East
target station to the North Hot Cell for
target exchange. 
  
  2813   Tuesday, June 17, 2025, 11:58 Frank SongITEStandard OperationTM4UC#48module disconnection TM4 with spent target UC#48 was disconnected
ang moved from ITE to NHC. see attachment
pls.
 TM4_with_spent_target_UC#48_disconnection_2025-06-17.pdf 
  2818   Thursday, June 19, 2025, 11:22 Travis CaveSpent Target VaultStandard Operation UC#48Spent Target Move The spent UC#48 target was removed
from the North Hot Cell, place in pail#303
and put into vault spot 2C, it was 35.4mSV/hr
 Target_Index_2025-06-19.pdf 
  2749   Thursday, January 16, 2025, 10:03 Travis CaveSpent Target VaultStandard Operation UC#47Spent Target Move The spent UC#47 was moved from the
south hot cell to the spent target vault
placed in pail #302 in spot 1C of the vault,
 Target_Index_2025-01-16.pdf 
  2746   Monday, January 13, 2025, 10:02 Travis CaveSpent Target VaultStandard Operation UC#46Spent Target MoveUC#46 was placed in pail# 301 in spot 1B and
was 26.3mSv/hr when removed from the SHC.
See attached PDF for vault 
 Target_Index_2025-01-13.pdf 