Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 23 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  384   Tuesday, June 25, 2013, 13:20 Travis CaveSouth Hot-CellStandard OperationTM1UC#6Electrical checkResults from the electrical check of TM#1
with the UC#6 target. See attached PDF.
 TM#1_UC#6_SIS_Target_Elec_Chk.PDF 
  385   Tuesday, June 25, 2013, 14:24 Travis CaveConditioning StationStandard OperationTM1UC#6module moveModule moves of TM#1 with Ta#39 from ITW
to SHC then TM#1 with UCx#6 from SHC to the
conditioning station moves went well.
  
  392   Tuesday, July 02, 2013, 10:58 Travis CaveConditioning StationStandard OperationTM1UC#6module moveTM#1 with UC#6 has been moved from the
conditioning station to the west target station,
move went well.
  
  428   Tuesday, August 27, 2013, 11:54 Travis CaveSouth Hot-CellStandard OperationTM1UC#6module moveTM#1 with UCx #6 has been moved to the
south hot cell.
  
  432   Wednesday, August 28, 2013, 14:17 Travis CaveSouth Hot-CellStandard Operation UC#6Spent target moveSpent target move, UC#6 has been moved
from the south hot cell to the target storage.
The target is in pail 108 and in slot 8C
 Vault_Storage_August_28_2013.pdf 
  2749   Thursday, January 16, 2025, 10:03 Travis CaveSpent Target VaultStandard Operation UC#47Spent Target Move The spent UC#47 was moved from the
south hot cell to the spent target vault
placed in pail #302 in spot 1C of the vault,
 Target_Index_2025-01-16.pdf 
  2746   Monday, January 13, 2025, 10:02 Travis CaveSpent Target VaultStandard Operation UC#46Spent Target MoveUC#46 was placed in pail# 301 in spot 1B and
was 26.3mSv/hr when removed from the SHC.
See attached PDF for vault 
 Target_Index_2025-01-13.pdf 
  2613   Friday, June 14, 2024, 16:04 Carla BabcockITWRepairTM4UC#45Replaced and reinstalled electronics in ITW cageITW has been behaving badly at higher voltages
recently, even without protons on. I conditioned
it up to 50kV with heaters off in the TCS
  
  2644   Thursday, July 18, 2024, 11:22 Travis CaveSpent Target VaultStandard Operation UC#45Spent Target Move The UC#45 target was moved from the
south hot cell to the spent target vault.
It was place in Pail#292 spot 1A of the vault,
 Target_Index_2024-07-18.pdf 
  2415   Monday, January 30, 2023, 11:30 Travis CaveSpent Target VaultStandard Operation UC#41Spent Target Move The spent UC#41 was moved from the
south hot cell to the spent target vault,
placed in spot 1C, in pail #231. See attached
 Target_Index_2023-01-30.pdf 
  2404   Wednesday, January 11, 2023, 11:34 Travis CaveSpent Target VaultStandard Operation UC#40Spent Target Move UC#40 was moved from the north hot
cell to the spent target vault. It was placed
in pail #278 put in spot 1B and was 15.6
 Target_Index_2023-01-11.pdf 
  2384   Thursday, November 03, 2022, 10:08 Travis CaveSpent Target VaultStandard Operation UC#39Spent Target Move The spent UC#39 target (pail #276)
was removed from the north hot cell and place
in the spent target vault (spot 4B) it was
 Target_Index_2022-11-03.pdf 
  2592   Wednesday, May 15, 2024, 10:06 Travis CaveSpent Target VaultStandard Operation UC#38,40 Ta#62,63 SiC#44Targets moved to the mini vault. Targets UC#38,40 Ta#62,63 SiC#44
have been moved from the spent target vault
to the mini vault in preparation for F-308
 Mini_Vault_Index_2024-05-15.pdfTarget_Index_2024-05-15.pdf 
  2367   Thursday, September 15, 2022, 11:25 Travis CaveSpent Target VaultStandard Operation UC#38Spent Target Move The spent target UC#38 was packed
into pail #274 and placed in spot 1A of the
vault. It was 33.3mSv/hr when removed from
 Target_Index_2022-09-15.pdf 
  2339   Thursday, June 23, 2022, 10:22 Travis CaveSpent Target VaultStandard Operation UC#37Spent Target Move UC#37 was placed in pail #228 and
place in spot 1B it was removed the north
hot cell. See attached PDF for more details
 Target_Index_2022-06-23.pdf 
  2291   Monday, January 17, 2022, 10:44 Frank SongSouth Hot-CellStandard OperationTM2UC#36 (the target removed)TM2 electrical check without Target. An electric check was done right
after module moving from SMP to SHC. 
 TM2_without_UCx36_at_SHC_(2).jpg 
  2264   Wednesday, November 10, 2021, 08:29 Frank SongSouth Hot-CellStandard OperationTM2UC#36electrical check An electrical check of TM2 with target
UC#36 and no external connections was finished
at SHC. 
 IMG_4322.JPG 
  2265   Wednesday, November 10, 2021, 08:32 Frank SongITWStandard OperationTM2UC#36Module Connection TM2 with target UC#36 was connected
at ITW.
 IMG_4323.JPG 
  2283   Wednesday, January 05, 2022, 12:45 Frank SongITWMaintenanceTM2UC#36TM2 SIS with Target and No external Connections electrical checked in ITW  TM2_with_UCx36.jpg 
  2290   Wednesday, January 12, 2022, 14:09 Travis CaveSpent Target VaultStandard Operation UC#36Spent Target Move The spent UC#36 target in the north
hot cell has been removed and placed in the
spent target vault. See attached PDF for
 Target_Index_2022-01-12.pdf 
ELOG V2.9.2-2455