Wednesday, October 23, 2013, 09:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#7, module move
|
TM#1 with UC #7 has been moved from the south west silo to the south hot cell. |
Thursday, October 24, 2013, 11:31, Travis Cave, Spent Target Vault, Standard Operation, , UC#7, Spent target move
|
UC #7 has been moved from the south hot cell to the spent target vault, it was placed in pail #110 and put in slot 8B of the vault, it was 22.6mSv/hr
upon removal from the hot cell. See attached PDF for vault details. |
Tuesday, June 25, 2013, 13:20, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#6, Electrical check
|
Results from the electrical check of TM#1 with the UC#6 target. See attached PDF. |
Tuesday, June 25, 2013, 14:24, Travis Cave, Conditioning Station, Standard Operation, TM1, UC#6, module move
|
Module moves of TM#1 with Ta#39 from ITW to SHC then TM#1 with UCx#6 from SHC to the conditioning station moves went well. |
Tuesday, July 02, 2013, 10:58, Travis Cave, Conditioning Station, Standard Operation, TM1, UC#6, module move
|
TM#1 with UC#6 has been moved from the conditioning station to the west target station, move went well. |
Tuesday, August 27, 2013, 11:54, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#6, module move
|
TM#1 with UCx #6 has been moved to the south hot cell. |
Wednesday, August 28, 2013, 14:17, Travis Cave, South Hot-Cell, Standard Operation, , UC#6, Spent target move
|
Spent target move, UC#6 has been moved from the south hot cell to the target storage. The target is in pail 108 and in slot 8C of the vault. See attached
PDF for details. |
Wednesday, May 07, 2025, 13:41, Aaron Tam, North Hot-Cell, Standard Operation, TM2, UC#49 , UC#49 SIS w/ Gasline Install   
|
May 7th, 2025 - Aaron Schmidt, Aaron Tam
UC#49 Handover - good
April 30th - Initial fit check was performed |
Friday, May 16, 2025, 10:36, Frank Song, ITW, Standard Operation, TM2, UC#49 , Module Connection
|
TM2 with UC#49 Febiad is connected in ITW. Form attached. |
Tuesday, May 06, 2025, 14:40, Frank Song, North Hot-Cell, Standard Operation, TM2, UC#49, electrical check/leak check
|
TM2 with new target UC#49 installed is E/L checked on the flange of NHC in TH. see attachment for detail. |
Wednesday, May 14, 2025, 09:45, Frank Song, 5 Shielding Blocks, Standard Operation, TM4, UC#48 IGLIS, shielding blocks transfer
|
5 shielding blocks have been transferred to ITE from storage area, the WP#I2025-05-14-2. |
Thursday, April 24, 2025, 11:33, Travis Cave, Conditioning Station, Standard Operation, , UC#48, Module move
|
TM4 with UC48 went on a long trip from the north hot cell to the conditioning station. |
Thursday, April 24, 2025, 12:53, Aaron Tam, North Hot-Cell, Standard Operation, TM4, UC#48, UC#48 IGLIS Install onto TM4 
|
C. Fisher, A. Schmidt, A. Tam
UC#48 Handover satisfactory
Target taken out of glovebox and tested for fit
The left most triplet conductor leg was seen to be slightly misaligned, |
Thursday, May 01, 2025, 09:33, Travis Cave, ITE, Standard Operation, TM4, UC#48, Module move
|
TM#4 with UC#48 went from the conditioning station to the east target station. |
Thursday, January 16, 2025, 10:03, Travis Cave, Spent Target Vault, Standard Operation, , UC#47, Spent Target Move
|
The spent UC#47 was moved from the south hot cell to the spent target vault placed in pail #302 in spot 1C of the vault, it was 24.5mSv/hr when
removed from the south hot cell. See attached for vault details. |
Monday, January 13, 2025, 10:02, Travis Cave, Spent Target Vault, Standard Operation, , UC#46, Spent Target Move
|
UC#46 was placed in pail# 301 in spot 1B and was 26.3mSv/hr when removed from the SHC. See attached PDF for vault
details. |
Friday, June 14, 2024, 16:04, Carla Babcock, ITW, Repair, TM4, UC#45, Replaced and reinstalled electronics in ITW cage
|
ITW has been behaving badly at higher voltages recently, even without protons on. I conditioned it up to 50kV with heaters off in the TCS and it was
fine. But when I tried to do the same with heaters on in the station, it was quite sparky and it kept tripping the TGHT/TBHT. I went to 49kV where it was
unstable, then lowered to 48kV where it looked fine for 30mins. But even operating at 40kV, it tripped the heaters several times. The TBHT voltage came |
Thursday, July 18, 2024, 11:22, Travis Cave, Spent Target Vault, Standard Operation, , UC#45, Spent Target Move
|
The UC#45 target was moved from the south hot cell to the spent target vault. It was place in Pail#292 spot 1A of the vault, was 19.5mSv/hr. Also
this pail contains the target material of UC#44. See attached PDF for more details. |
Monday, January 30, 2023, 11:30, Travis Cave, Spent Target Vault, Standard Operation, , UC#41, Spent Target Move
|
The spent UC#41 was moved from the south hot cell to the spent target vault, placed in spot 1C, in pail #231. See attached PDF for details. |
Wednesday, January 11, 2023, 11:34, Travis Cave, Spent Target Vault, Standard Operation, , UC#40, Spent Target Move
|
UC#40 was moved from the north hot cell to the spent target vault. It was placed in pail #278 put in spot 1B and was 15.6 mSv/hr when removed from
the north hot cell.
Also Ta#62 in pail #256 was moved from spot 7B back to 7A where it was originally located. This pail in the future will have to be repacked due |
|