Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 22 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Module Target/Numberdown Subject
  680   Tuesday, June 10, 2014, 14:02 David WangITWStandard OperationTM1UC9#TM1 and ITW turbo pumps have been started.

TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on.

  2536   Friday, January 26, 2024, 16:48 Carla BabcockSouth Hot-CellStandard OperationTM4UC43UCx#43 PIE

UCx#43 PIE was done in the SHC. As expected based on electrical measurements, the target container was broken on the right side and came off easily. Despite all the black stuff seen on the containment box and source tray, the inside of the heat shield was very clean. Checked if the Re foil was curled in and didn't see anything. Looked fine other than the broken container.

  672   Monday, June 02, 2014, 11:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical check

TM#1 with UC#9 electrical check see attached pdf for details.

Attachment 1: TM1_UC9_elec_chk_SHC.PDF
TM1_UC9_elec_chk_SHC.PDF
  674   Monday, June 02, 2014, 13:53 Travis CaveConditioning StationStandard OperationTM1UC#9module move

TM#1 with UC#9 has been moved from the south hot cell to the conditioning station.

  678   Tuesday, June 10, 2014, 07:57 David WangConditioning StationStandard OperationTM1UC#9 TM1 are vented with argon and disconnected at CS.

TM1 will be moved to ITW this morning.

  679   Tuesday, June 10, 2014, 13:20 Travis CaveITWStandard OperationTM1UC#9module move

TM#1 with UC#9 moved from the conditioning station to west station.

  682   Friday, June 13, 2014, 10:33 Anders MjosITWDevelopmentTM1UC#9Flow meter data

Coil not used on TM1. Data and plots on DocuShare

Friday, June 13, 2014, 10:30. ITE receving p+

  Temp [C] Flow [lpm]
HS 30.0 6.3
COIL  30.2 11.6

 Monday, June 16, 2014, 09:30: p+ off for maintenance day

  Temp [C] Flow [lpm]
HS 32.7 6.3
COIL  27.7 11.6

 Thursday, June 19, 2014, 16:14: 10 uA p+ on ITW

  Temp [C] Flow [lpm]
HS 31.9 7.2
COIL  27.6 13.1

Tuesday, July 08, 2014, 10:32:

Data uploaded to DocuShare

  683   Tuesday, June 17, 2014, 10:46 David WangITWStandard OperationTM1UC#95 Shielding blocks have been transferred from ITE to ITW.

5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also.

  701   Wednesday, July 16, 2014, 10:32 Travis CaveSouth Hot-CellStandard OperationTM1UC#9module move

TM#1 with UC#9 has been moved from the west target station to the south hot cell.

  703   Wednesday, July 16, 2014, 13:02 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical check

Electrical check of the TM#1 with UC#9 post beam at the south hot cell.

Attachment 1: TM1_UC9_Elecchk_postbeam.PDF
TM1_UC9_Elecchk_postbeam.PDF
  572   Thursday, December 05, 2013, 12:51 Travis CaveSouth Hot-CellStandard OperationTM4UC#8 and no targetElectrical check

Electrical check was done on TM#4 without a target and with the UC#8 target on see attached PDF for results.

Attachment 1: TM#4_UC8_electest_SHC.PDF
TM#4_UC8_electest_SHC.PDF TM#4_UC8_electest_SHC.PDF
Attachment 2: TM#4_notarget_electest_SHC.PDF
TM#4_notarget_electest_SHC.PDF TM#4_notarget_electest_SHC.PDF
  571   Thursday, December 05, 2013, 12:04 Travis CaveITEStandard OperationTM4UC#8module move

TM#4 with UC#8 has been moved from the south hot cell to the east target station.

  584   Monday, January 20, 2014, 14:37 Travis CaveITEStandard OperationTM4UC#8module move

TM#4 with UC#8 has been moved from the east target station to the south hot cell.

  587   Wednesday, January 22, 2014, 15:00 Travis CaveSpent Target VaultStandard Operation UC#8Spent target move

UC#8 has been moved from the south hot cell to the vault storage. It was placed in pail 113 and placed in slot 8A of the vault. The field was 9.2mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_January_22_2014.pdf
Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf Vault_Storage_January_22_2014.pdf
  588   Wednesday, January 22, 2014, 15:20 Anders MjosSouth Hot-CellStandard Operation UC#8Target Inspection - post beam

The Target Assembly was inspected with Chad, Jens Henning and Anders today.

  • The Target Container was broken.
  • Material was deposited on the Heat Shield around the Target Center Block
  • Material was deposited on the IG-LIS source.
  • Electrical checks to ground (HS)
    • The Extraction Electrode passed the electrical check at 1000V
    • The Exit Electrode (c) held only 40V at 22 kOhm
    • The IG Electrode 1 (f) held 250V at 390 MOhm
    • The IG Electrode 2 (g) held only 40V at 22 kOhm
  • IG 1 and IG 2 both held 250V at 450 MOhm to Exit Electorde (c)
  • No spark marks were observed on the 9-pin connector

See photos of the inspection on DocuShare

  429   Tuesday, August 27, 2013, 11:56 Travis CaveSouth Hot-CellStandard OperationTM1UC#7Electrical check

TM#1 with UCx#7 electrical check, numbers look good, see PDF for details.

Attachment 1: TM#1_UC#7__TgtElecChk_SHC_.PDF
TM#1_UC#7__TgtElecChk_SHC_.PDF
  430   Tuesday, August 27, 2013, 14:14 Travis CaveITWStandard OperationTM1UC#7module move

TM#1 with UCx#7 has been moved from the south hot cell to the west target station.

  516   Tuesday, October 22, 2013, 11:18 Travis CaveITWStandard OperationTM1UC#7module move

TM#1 with UC#7 has been moved from the ITW to the south west silo.

  521   Wednesday, October 23, 2013, 09:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#7module move

TM#1 with UC #7 has been moved from the south west silo to the south hot cell.

  523   Thursday, October 24, 2013, 11:31 Travis CaveSpent Target VaultStandard Operation UC#7Spent target move

UC #7 has been moved from the south hot cell to the spent target vault, it was placed in pail #110 and put in slot 8B of the vault, it was 22.6mSv/hr upon removal from the hot cell. See attached PDF for vault details.

Attachment 1: Vault_Storage_October_24_2013.pdf
Vault_Storage_October_24_2013.pdf Vault_Storage_October_24_2013.pdf Vault_Storage_October_24_2013.pdf Vault_Storage_October_24_2013.pdf
ELOG V2.9.2-2455