Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 22 of 138  Not logged in ELOG logo
Entry  Tuesday, June 10, 2014, 14:02, David Wang, ITW, Standard Operation, TM1, UC9#, TM1 and ITW turbo pumps have been started. 
TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on.
Entry  Friday, January 26, 2024, 16:48, Carla Babcock, South Hot-Cell, Standard Operation, TM4, UC43, UCx#43 PIE 
UCx#43 PIE was done in the SHC. As expected based on electrical measurements, the target container was broken on the right side and came off easily.
Despite all the black stuff seen on the containment box and source tray, the inside of the heat shield was very clean. Checked if the Re foil was curled
in and didn't see anything. Looked fine other than the broken container.
Entry  Monday, June 02, 2014, 11:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#9, Electrical check TM1_UC9_elec_chk_SHC.PDF
TM#1 with UC#9 electrical check see attached pdf for details.
Entry  Monday, June 02, 2014, 13:53, Travis Cave, Conditioning Station, Standard Operation, TM1, UC#9, module move 
TM#1 with UC#9 has been moved from the south hot cell to the conditioning station.
Entry  Tuesday, June 10, 2014, 07:57, David Wang, Conditioning Station, Standard Operation, TM1, UC#9, TM1 are vented with argon and disconnected at CS. 
TM1 will be moved to ITW this morning.
Entry  Tuesday, June 10, 2014, 13:20, Travis Cave, ITW, Standard Operation, TM1, UC#9, module move 
TM#1 with UC#9 moved from the conditioning station to west station.
Entry  Friday, June 13, 2014, 10:33, Anders Mjos, ITW, Development, TM1, UC#9, Flow meter data 
Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE receving p+

    
        
             
            Temp [C]
Entry  Tuesday, June 17, 2014, 10:46, David Wang, ITW, Standard Operation, TM1, UC#9, 5 Shielding blocks have been transferred from ITE to ITW. 
5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also.
Entry  Wednesday, July 16, 2014, 10:32, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#9, module move 
TM#1 with UC#9 has been moved from the west target station to the south hot cell.
Entry  Wednesday, July 16, 2014, 13:02, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#9, Electrical check TM1_UC9_Elecchk_postbeam.PDF
Electrical check of the TM#1 with UC#9 post beam at the south hot cell.
Entry  Thursday, December 05, 2013, 12:51, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#8 and no target, Electrical check TM#4_UC8_electest_SHC.PDFTM#4_notarget_electest_SHC.PDF
Electrical check was done on TM#4 without a target and with the UC#8 target on see attached PDF for results.
Entry  Thursday, December 05, 2013, 12:04, Travis Cave, ITE, Standard Operation, TM4, UC#8, module move 
TM#4 with UC#8 has been moved from the south hot cell to the east target station.
Entry  Monday, January 20, 2014, 14:37, Travis Cave, ITE, Standard Operation, TM4, UC#8, module move 
TM#4 with UC#8 has been moved from the east target station to the south hot cell.
Entry  Wednesday, January 22, 2014, 15:00, Travis Cave, Spent Target Vault, Standard Operation, , UC#8, Spent target move Vault_Storage_January_22_2014.pdf
UC#8 has been moved from the south hot cell to the vault storage. It was placed in pail 113 and placed in slot 8A of the vault. The field was 9.2mSv/hr
upon removal from the south hot cell.
Entry  Wednesday, January 22, 2014, 15:20, Anders Mjos, South Hot-Cell, Standard Operation, , UC#8, Target Inspection - post beam 
The Target Assembly was inspected with Chad, Jens Henning and Anders today.

    The Target Container was broken.
    Material was deposited on the Heat Shield around the Target Center Block
    Material
was deposited on the IG-LIS source.
    Electrical checks to ground (HS)
    
        The Extraction Electrode passed the electrical
Entry  Tuesday, August 27, 2013, 11:56, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#7, Electrical check TM#1_UC#7__TgtElecChk_SHC_.PDF
TM#1 with UCx#7 electrical check, numbers look good, see PDF for details.
Entry  Tuesday, August 27, 2013, 14:14, Travis Cave, ITW, Standard Operation, TM1, UC#7, module move 
TM#1 with UCx#7 has been moved from the south hot cell to the west target station.
Entry  Tuesday, October 22, 2013, 11:18, Travis Cave, ITW, Standard Operation, TM1, UC#7, module move 
TM#1 with UC#7 has been moved from the ITW to the south west silo.
Entry  Wednesday, October 23, 2013, 09:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#7, module move 
TM#1 with UC #7 has been moved from the south west silo to the south hot cell.
Entry  Thursday, October 24, 2013, 11:31, Travis Cave, Spent Target Vault, Standard Operation, , UC#7, Spent target move Vault_Storage_October_24_2013.pdf
UC #7 has been moved from the south hot cell to the spent target vault, it was placed in pail #110 and put in slot 8B of the vault, it was 22.6mSv/hr
upon removal from the hot cell. See attached PDF for vault details.
ELOG V2.9.2-2455