439
|
Friday, August 30, 2013, 10:27 |
Bevan Moss | South Hot-Cell | Repair | TM3 | N/A | Heat Shield Repair |
|
|
440
|
Friday, August 30, 2013, 14:55 |
Bevan Moss | South Hot-Cell | Repair | TM3 | N/A | Heat Shield Repair |
|
|
441
|
Wednesday, September 04, 2013, 12:21 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Ante-room work | September 3rd
David Wang and myself lowered the
leak testing cart into the Ante room and |
|
442
|
Wednesday, September 04, 2013, 18:53 |
Grant Minor | South Hot-Cell | Repair | TM3 | | Maico's measurements of new c-seals and bench-tested c-seals | Today Maico measured the thickness of three
indium-plated inconel c-seals, presumably
Ultra-Seal P/N 50606. These seals had |
|
443
|
Wednesday, September 04, 2013, 19:01 |
Grant Minor | South Hot-Cell | Repair | TM3 | | Inspection / Ante Room Leak Check Results on TM3 Heat Shield lines (3 Sept 2013) | Yesterday, Grant entered the Ante Room
with David Wang to visually inspect the two
sets of failed c-seals from the Heat Shield |
|
444
|
Friday, September 06, 2013, 16:41 |
Bevan Moss | South Hot-Cell | Development | TM3 | | C-Seal crush investigation | Today Maico completed the new leak
testing tool and blank off. He tested them
with C-seals without springs and all was |
6x |
445
|
Friday, September 06, 2013, 17:50 |
Grant Minor | South Hot-Cell | Development | TM3 | | C-Seal crush investigation |
|
|
446
|
Tuesday, September 10, 2013, 12:11 |
Isaac Earle | South Hot-Cell | Repair | TM3 | | Module side heat shield water block polishing and blank-off installation | The sealing surfaces of the module
side heat shield water block were polished
on September 9th in the morning using Chad's |
|
450
|
Wednesday, September 11, 2013, 15:37 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | C-Seal leak checking and repair | This e-log is to cover the work completed
from September 9th until the 11th.
September 9th |
|
452
|
Thursday, September 12, 2013, 10:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check | TM#4 with SiC#29 post beam electrical check
in the south hot cell see PDF for details. |
|
454
|
Friday, September 13, 2013, 08:05 |
David Wang | South Hot-Cell | Repair | TM4 | | TM4 coil 1 leak check in SHC | Leak checked TM4 coil1 in SHC with Isaac
. The leak detector only can pump down to
1.5xE-7 atm.cc/sec. The leak detector got |
|
455
|
Tuesday, September 17, 2013, 14:36 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | | Containment Box has been removed | The containment box has been removed.
Tomorrow the wiring harness will be installed. |
|
456
|
Thursday, September 19, 2013, 09:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | wiring harness | The wiring harness for TM#3 was made and
a continuity and megger test was done on
it and it passed, it has since been installed |
|
457
|
Thursday, September 19, 2013, 11:09 |
Travis Cave | South Hot-Cell | Maintenance | TM3 | no target | Electrical check | Electrical check of TM#3 with no target
was performed and it failed. |
|
458
|
Thursday, September 19, 2013, 15:56 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Activities for September 18th and 19th | September 18th
The wiring harness was completed
by Maico and Travis today (see pics) and |
|
459
|
Monday, September 23, 2013, 13:55 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | window circuit leak check | This morning, Bevan and I leak checked
window circuit on TM3 at SHC after containment
box was installed. It took about 20minutes |
|
460
|
Monday, September 23, 2013, 16:10 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Activities Sept 20 - 23 2013 | September 20th
Today was a trying day. When attempting
to make the water line connections for the |
|
461
|
Tuesday, September 24, 2013, 08:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check | Electrical check was done on TM#3 yesterday
and again the coil lines to the 60kV common
and the coil line to each other failed, as |
|
462
|
Tuesday, September 24, 2013, 14:46 |
Bevan Moss | South Hot-Cell | Repair | | | Right manipulator repair | |
|
463
|
Wednesday, September 25, 2013, 06:59 |
maicodallavalle | South Hot-Cell | Standard Operation | TM3 | | Containment box cover | The containment box cover has had all
the bolts installed and all bolts were checked
with a mirror. TM3 has been raised and is |
|