2542
|
Wednesday, February 14, 2024, 11:32 |
Adam Newsome | Spent Target Vault | Standard Operation | | UCx#43 | Spent Target Move | Spent target UCx#43 (pail 289) was moved
from the South Hot Cell to the Storage Vault,
placed in location 2A. Dose rate at 1m was |
|
|
2465
|
Wednesday, July 19, 2023, 08:04 |
Frank Song | ITE | Standard Operation | TM4 | UCx#42 | Module Connection | TM4 with new target UCx#42 was connected
in ITE. |
|
|
2466
|
Wednesday, July 19, 2023, 08:09 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check | An electrical check was made after
new target installed on TM4. |
|
|
2483
|
Tuesday, August 29, 2023, 09:33 |
Frank Song | ITE | Standard Operation | TM4 | UCx#42 | module disconnection | TM4 with spent target UCx#42 was
disconnected in ITE and has been remote moved
to NHC this morning. |
|
|
2484
|
Tuesday, August 29, 2023, 10:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check | TM4 with spent target UCx#42
has been electric checked at NHCpost right
after transferred from ITE. |
|
|
2487
|
Friday, September 01, 2023, 10:36 |
Adam Newsome | Spent Target Vault | Standard Operation | | UCx#42 | Spent Target Move | UCx #42 moved from North Hot Cell to Storage
Vault in Pail #282. Placed in slot 6B. Tray
6 is now full. Pail measured at 34.9 mSv/h |
|
|
2392
|
Wednesday, November 23, 2022, 11:27 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#41 | electric and leak check after new target installed | an electric check and leak check
done on NHC, TM4 with new target UCx#41 is
ready moving to TCS. |
|
|
2393
|
Wednesday, November 23, 2022, 12:10 |
Adam Newsome | Conditioning Station | Standard Operation | TM4 | UCx#41 | TM4 Move - NHC to TCS | TM4 was moved from the North Hot Cell to
the Target Conditioning Station with UCx#41.
|
|
|
2396
|
Thursday, December 01, 2022, 08:20 |
Frank Song | ITE | Standard Operation | TM4 | UCx#41 | Module Connection | TM4 with UCx#41 was connected in
ITE on Tuesday (2022-11-29) |
|
|
2405
|
Tuesday, January 24, 2023, 07:17 |
David Wang | ITE | Standard Operation | TM4 | UCx#41 | TM4 water lines helium pressure test 2023. | TM4 water lines helium pressure test was
done yesterday at ITE. All water lines were
air purged one day ahead for the test. |
|
|
2408
|
Tuesday, January 24, 2023, 08:46 |
David Wang | ITE | Standard Operation | TM4 | UCx#41 | TM4 has been disconnected in ITE. | TM 4 has been disconnected in ITE.
See attachment for disconnection checklist. |
|
|
2409
|
Tuesday, January 24, 2023, 14:22 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#41 | TM4 electrical check with and without target at SHC | TM4 electrical check with UCX41target and
without target at SHC. The results
are good. See attachment. |
|
|
2410
|
Wednesday, January 25, 2023, 06:52 |
David Wang | ITE | Standard Operation | TM4 | UCx#41 | ITE primary and secondary vacuum vessel air to vacuum seals leak check. | ITE primary and secondary vacuum vessel
air to vacuum seals leak check was done this
week. One leak has been found on IG1S feed |
|
|
2383
|
Wednesday, November 02, 2022, 11:11 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#40 | electrical check | an electrical check was done on NHC, TM2
with new target UCx40 is ready moving to
TCS. |
|
|
2385
|
Thursday, November 03, 2022, 13:15 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx#40 | HS line helium pressure test. TM4 with UCx#40at TCS. | Helium 70 psi. tested 5minutes at base
leak rate 0.9 xE09 atm.cc/sec on HS line.
No leak. |
|
|
2387
|
Tuesday, November 15, 2022, 13:33 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | Module Connection | TM2 with UCx#40 is connected in ITW. |
|
|
2402
|
Monday, January 09, 2023, 14:19 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | TM2 with UCx40 disconnection in ITW | TM2 with target UCx40 was disconnected
in ITW and moved to NHC. |
|
|
153
|
Tuesday, July 31, 2012, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#4 | UCx#4 Installed | Starting at 11:00 am and finishing at 12:10
Ucx#4 previous target was removed and UCx#4
installed and leak checked on TM1. |
|
|
155
|
Tuesday, July 31, 2012, 14:04 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | module move | TM#1 with UCx#4 has been moved from the
south hot hell to the conditioning
station. No problems with the move. |
|
|
156
|
Wednesday, August 01, 2012, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | Electrical check | TM#1 with UCx#4 electrical check done at
the conditioning station under vacuum, see
attached sheet for results. |
|