Entry  Wednesday, February 14, 2024, 11:32, Adam Newsome, Spent Target Vault, Standard Operation, , UCx#43, Spent Target Move Target_Index_2024-02-14.xlsm

Spent target UCx#43 (pail 289) was moved from the South Hot Cell to the Storage Vault, placed in location 2A. Dose rate at 1m was approximately 22.6 mSv/hr.

Target index spreadsheet updated, attached.

Entry  Wednesday, July 19, 2023, 08:04, Frank Song, ITE, Standard Operation, TM4, UCx#42, Module Connection TM4_with_UCx42_connection_in_ITE_20230718.pdf

 TM4 with new target UCx#42 was connected in ITE. 

Entry  Wednesday, July 19, 2023, 08:09, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#42, electrical check E__check_after_UCx42_installed_on_TM4.pdf

 An electrical check was made after new target installed on TM4.

Entry  Tuesday, August 29, 2023, 09:33, Frank Song, ITE, Standard Operation, TM4, UCx#42, module disconnection TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf

 TM4 with spent target UCx#42 was disconnected in ITE and has been remote moved to NHC this morning.

Entry  Tuesday, August 29, 2023, 10:45, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#42, electrical check  TM4_with_UCx42_electric_check_with_spent_target_at_NHCPost__2023-08-29.pdf

  TM4 with spent target UCx#42 has been electric checked at NHCpost right after transferred from ITE.

Entry  Friday, September 01, 2023, 10:36, Adam Newsome, Spent Target Vault, Standard Operation, , UCx#42, Spent Target Move Target_Index_2023-09-01.xlsm

UCx #42 moved from North Hot Cell to Storage Vault in Pail #282. Placed in slot 6B. Tray 6 is now full. Pail measured at 34.9 mSv/h at ~1 m upon removal from the hot cell. See attached updated spreadsheet. 

Entry  Wednesday, November 23, 2022, 11:27, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#41, electric and leak check after new target installed TM4_with_UCx#41_electric_and_leak_check_on_NHC.png

 an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS.

Entry  Wednesday, November 23, 2022, 12:10, Adam Newsome, Conditioning Station, Standard Operation, TM4, UCx#41, TM4 Move - NHC to TCS 

TM4 was moved from the North Hot Cell to the Target Conditioning Station with UCx#41.

Entry  Thursday, December 01, 2022, 08:20, Frank Song, ITE, Standard Operation, TM4, UCx#41, Module Connection TM4_with_UCx#41_connection_in_ITE.png

 TM4 with UCx#41 was connected in ITE on Tuesday (2022-11-29) 

Entry  Tuesday, January 24, 2023, 07:17, David Wang, ITE, Standard Operation, TM4, UCx#41, TM4 water lines helium pressure test 2023.  TM4_water_lines_helium_presuure_test_2023.pdf

TM4 water lines helium pressure test was done yesterday at ITE. All water lines were air purged one day ahead  for the test. No leak  has been found on TM4 waterlines during the test. See attachment for detail

Entry  Tuesday, January 24, 2023, 08:46, David Wang, ITE, Standard Operation, TM4, UCx#41, TM4 has been disconnected in ITE.  UCx#41_TM4_disconnection_checklist_in_ITE.pdf

TM 4 has been disconnected in ITE.  See attachment for disconnection checklist.

Entry  Tuesday, January 24, 2023, 14:22, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#41, TM4 electrical check with and without target at SHC TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf

TM4 electrical check with UCX41target and without target at SHC.  The results are good. See attachment.

Entry  Wednesday, January 25, 2023, 06:52, David Wang, ITE, Standard Operation, TM4, UCx#41, ITE primary and secondary vacuum vessel air to vacuum seals leak check.  ITE_vacuum_vessel_leak_check_2023..pdf

ITE primary and secondary vacuum vessel air to vacuum seals leak check was done this week. One leak has been found on IG1S feed through to entrance module surface seal. It explains what we saw on ITE IG1S readings change(from low E-7 torr to 1Xe-6 torr) on December 22, 2022.  This leak seal will be replaced soon.

2023-Jan -27.  O-ring seal 229# was replaced on ITEIG1S feedthrough to entrance module surface sealing. Also o-ring seal 034# was replaced on the blank off cover beside the feed through to entrance module surface sealing. Since these o-rings are too close to each other. It is better to replace both of them to avoid misreading in leak check.

Entry  Wednesday, November 02, 2022, 11:11, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#40, electrical check TM2_with_UCx40_electrical_check_on_NHC.png

an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.

Entry  Thursday, November 03, 2022, 13:15, David Wang, Conditioning Station, Standard Operation, TM2, UCx#40, HS line helium pressure test. TM4 with UCx#40at TCS. 

Helium 70 psi. tested 5minutes at base leak rate 0.9 xE09 atm.cc/sec on HS line.  No leak.

Entry  Tuesday, November 15, 2022, 13:33, Frank Song, ITW, Standard Operation, TM2, UCx#40, Module Connection TM2_with_UCx#40_connection_in_ITW.png

 TM2 with UCx#40 is connected in ITW.

Entry  Monday, January 09, 2023, 14:19, Frank Song, ITW, Standard Operation, TM2, UCx#40, TM2 with UCx40 disconnection in ITW TM2_with_UCx40_disconnection_in_ITW.png

 TM2 with target UCx40 was disconnected in ITW and moved to NHC.

Entry  Tuesday, July 31, 2012, 12:24, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#4, UCx#4 Installed 

Starting at 11:00 am and finishing at 12:10 Ucx#4 previous target was removed and UCx#4 installed and leak checked on TM1.

During module move to the hot cell UCx#4 was housed in a bag under argon.

Entry  Tuesday, July 31, 2012, 14:04, Travis Cave, Conditioning Station, Standard Operation, TM1, UCx#4, module move 

TM#1 with UCx#4 has been moved from the south  hot hell to the conditioning station. No problems with the move.

Entry  Wednesday, August 01, 2012, 09:14, Travis Cave, Conditioning Station, Standard Operation, TM1, UCx#4, Electrical check TM#1_UC#4_under_vac.PDF

TM#1 with UCx#4 electrical check done at the conditioning station under vacuum, see attached sheet for results.