  RH-ISAC, Page 16 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject
  2542   Wednesday, February 14, 2024, 11:32 Adam NewsomeSpent Target VaultStandard Operation UCx#43Spent Target Move

Spent target UCx#43 (pail 289) was moved from the South Hot Cell to the Storage Vault, placed in location 2A. Dose rate at 1m was approximately 22.6 mSv/hr.

Target index spreadsheet updated, attached.

Attachment 1: Target_Index_2024-02-14.xlsm
  2465   Wednesday, July 19, 2023, 08:04 Frank SongITEStandard OperationTM4UCx#42Module Connection

 TM4 with new target UCx#42 was connected in ITE. 

Attachment 1: TM4_with_UCx42_connection_in_ITE_20230718.pdf
TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf
  2466   Wednesday, July 19, 2023, 08:09 Frank SongNorth Hot-CellStandard OperationTM4UCx#42electrical check

 An electrical check was made after new target installed on TM4.

Attachment 1: E__check_after_UCx42_installed_on_TM4.pdf
E__check_after_UCx42_installed_on_TM4.pdf
  2483   Tuesday, August 29, 2023, 09:33 Frank SongITEStandard OperationTM4UCx#42module disconnection

 TM4 with spent target UCx#42 was disconnected in ITE and has been remote moved to NHC this morning.

Attachment 1: TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf
TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf
  2484   Tuesday, August 29, 2023, 10:45 Frank SongNorth Hot-CellStandard OperationTM4UCx#42electrical check

  TM4 with spent target UCx#42 has been electric checked at NHCpost right after transferred from ITE.

Attachment 1: TM4_with_UCx42_electric_check_with_spent_target_at_NHCPost__2023-08-29.pdf
TM4_with_UCx42_electric_check_with_spent_target_at_NHCPost__2023-08-29.pdf
  2487   Friday, September 01, 2023, 10:36 Adam NewsomeSpent Target VaultStandard Operation UCx#42Spent Target Move

UCx #42 moved from North Hot Cell to Storage Vault in Pail #282. Placed in slot 6B. Tray 6 is now full. Pail measured at 34.9 mSv/h at ~1 m upon removal from the hot cell. See attached updated spreadsheet. 

Attachment 1: Target_Index_2023-09-01.xlsm
  2392   Wednesday, November 23, 2022, 11:27 Frank SongNorth Hot-CellStandard OperationTM4UCx#41electric and leak check after new target installed

 an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS.

Attachment 1: TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
  2393   Wednesday, November 23, 2022, 12:10 Adam NewsomeConditioning StationStandard OperationTM4UCx#41TM4 Move - NHC to TCS

TM4 was moved from the North Hot Cell to the Target Conditioning Station with UCx#41.

  2396   Thursday, December 01, 2022, 08:20 Frank SongITEStandard OperationTM4UCx#41Module Connection

 TM4 with UCx#41 was connected in ITE on Tuesday (2022-11-29) 

Attachment 1: TM4_with_UCx#41_connection_in_ITE.png
TM4_with_UCx#41_connection_in_ITE.png
  2405   Tuesday, January 24, 2023, 07:17 David WangITEStandard OperationTM4UCx#41TM4 water lines helium pressure test 2023.

TM4 water lines helium pressure test was done yesterday at ITE. All water lines were air purged one day ahead  for the test. No leak  has been found on TM4 waterlines during the test. See attachment for detail

Attachment 1: TM4_water_lines_helium_presuure_test_2023.pdf
TM4_water_lines_helium_presuure_test_2023.pdf
  2408   Tuesday, January 24, 2023, 08:46 David WangITEStandard OperationTM4UCx#41TM4 has been disconnected in ITE.

TM 4 has been disconnected in ITE.  See attachment for disconnection checklist.

Attachment 1: UCx#41_TM4_disconnection_checklist_in_ITE.pdf
UCx#41_TM4_disconnection_checklist_in_ITE.pdf UCx#41_TM4_disconnection_checklist_in_ITE.pdf UCx#41_TM4_disconnection_checklist_in_ITE.pdf
  2409   Tuesday, January 24, 2023, 14:22 David WangSouth Hot-CellStandard OperationTM4UCx#41TM4 electrical check with and without target at SHC

TM4 electrical check with UCX41target and without target at SHC.  The results are good. See attachment.

Attachment 1: TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf
TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf
  2410   Wednesday, January 25, 2023, 06:52 David WangITEStandard OperationTM4UCx#41ITE primary and secondary vacuum vessel air to vacuum seals leak check.

ITE primary and secondary vacuum vessel air to vacuum seals leak check was done this week. One leak has been found on IG1S feed through to entrance module surface seal. It explains what we saw on ITE IG1S readings change(from low E-7 torr to 1Xe-6 torr) on December 22, 2022.  This leak seal will be replaced soon.

2023-Jan -27.  O-ring seal 229# was replaced on ITEIG1S feedthrough to entrance module surface sealing. Also o-ring seal 034# was replaced on the blank off cover beside the feed through to entrance module surface sealing. Since these o-rings are too close to each other. It is better to replace both of them to avoid misreading in leak check.

Attachment 1: ITE_vacuum_vessel_leak_check_2023..pdf
ITE_vacuum_vessel_leak_check_2023..pdf
  2383   Wednesday, November 02, 2022, 11:11 Frank SongNorth Hot-CellStandard OperationTM2UCx#40electrical check

an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.

Attachment 1: TM2_with_UCx40_electrical_check_on_NHC.png
TM2_with_UCx40_electrical_check_on_NHC.png
  2385   Thursday, November 03, 2022, 13:15 David WangConditioning StationStandard OperationTM2UCx#40HS line helium pressure test. TM4 with UCx#40at TCS.

Helium 70 psi. tested 5minutes at base leak rate 0.9 xE09 atm.cc/sec on HS line.  No leak.

  2387   Tuesday, November 15, 2022, 13:33 Frank SongITWStandard OperationTM2UCx#40Module Connection

 TM2 with UCx#40 is connected in ITW.

Attachment 1: TM2_with_UCx#40_connection_in_ITW.png
TM2_with_UCx#40_connection_in_ITW.png
  2402   Monday, January 09, 2023, 14:19 Frank SongITWStandard OperationTM2UCx#40TM2 with UCx40 disconnection in ITW

 TM2 with target UCx40 was disconnected in ITW and moved to NHC.

Attachment 1: TM2_with_UCx40_disconnection_in_ITW.png
TM2_with_UCx40_disconnection_in_ITW.png
  153   Tuesday, July 31, 2012, 12:24 chad fisherSouth Hot-CellStandard OperationTM1UCx#4UCx#4 Installed

Starting at 11:00 am and finishing at 12:10 Ucx#4 previous target was removed and UCx#4 installed and leak checked on TM1.

During module move to the hot cell UCx#4 was housed in a bag under argon.

  155   Tuesday, July 31, 2012, 14:04 Travis CaveConditioning StationStandard OperationTM1UCx#4module move

TM#1 with UCx#4 has been moved from the south  hot hell to the conditioning station. No problems with the move.

  156   Wednesday, August 01, 2012, 09:14 Travis CaveConditioning StationStandard OperationTM1UCx#4Electrical check

TM#1 with UCx#4 electrical check done at the conditioning station under vacuum, see attached sheet for results.

Attachment 1: TM#1_UC#4_under_vac.PDF
TM#1_UC#4_under_vac.PDF