  223   Wednesday, December 05, 2012, 15:53 Anders MjosSouth Hot-CellStandard Operation UCx#5Target inspection - target tube brokenThe target was inspected today.
It was found that the target tube
had broken on both sides of the centre block
  
  224   Thursday, December 06, 2012, 08:57 Travis CaveSpent Target VaultStandard Operation UCx#5Spent target moveUCx #5 has been moved from the south hot
cell to the storage vault. It is in Pail
102, in spot 2A of the vault and had a field
 Vault_Storage_December_6_2012.pdf 
  2723   Tuesday, November 26, 2024, 14:52 Aaron TamSouth Hot-CellStandard OperationTM3UCx#47 UC#47 LP-SIS w/ gas Install November 26, 2024 - Aaron Tam 
Handover from TPO and inspection

    Completed
    Some
 6x 
  2721   Tuesday, November 26, 2024, 13:03 Frank SongSouth Hot-CellStandard OperationTM3UCx#47electrical check/leak checkAn electrical check and leak check had
been done after new target UCx47 was installed
on TM3 in SHC. see attachment pls.
 TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf 
  2729   Wednesday, December 04, 2024, 08:05 Frank SongITEStandard OperationTM3UCx#47Module ConnectionTM3 with new target UCx#47 was connected
in ITE right after be moved from TCS. 
 TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf 
  2735   Monday, December 09, 2024, 13:10 Frank Song5 Shielding BlocksStandard OperationTM3UCx#47shielding blocks transfer 5 Shielding Blocks have been transferred
from ITW to ITE. MAA is secured after moving.
  
  2740   Friday, January 03, 2025, 12:34 Frank Song5 Shielding BlocksMaintenance UCx#47shielding blocks moving Five shielding blocks are moved from
ITE to storage area ( one of them is sitting
on B2 as limit of room) for target stations
  
  2747   Monday, January 13, 2025, 10:36 Frank SongITEStandard OperationTM3UCx#47module disconnection TM3 with spent target UCx#47 was
disconnected in ITE and will be moved to
SHC.
 TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf 
  2748   Tuesday, January 14, 2025, 10:00 David WangSouth Hot-CellStandard OperationTM3UCx#47after operation electrical check, Tm3 UCx 47TM3 UCx#47 after operation electrical check 
is done at SHC. The result is normal. See
attachment.
 TM3_UCX_47_after_operation_electrical_check.pdf 
  2715   Friday, November 08, 2024, 10:44 Aaron TamSouth Hot-CellStandard OperationTM4UCx#46UCx#46 Install and Parasitic Target Status November 6, 2024 - Aaron Tam 
UCx#46 Target handover from
TPO 
 Left_side_Array_Parasitic_with_floppy_spacer.jfifRight_side_Window_Parasitic.jfifLid_Parasitics_order.jfif 
  2717   Tuesday, November 12, 2024, 12:30 Frank SongITWStandard OperationTM4UCx#46Module Connection TM4 with new target UCx#46 was moved
from TCS to ITW and has been re-connected
right after. see attachment pls.
 TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf 
  2719   Thursday, November 21, 2024, 14:11 Frank Song5 Shielding BlocksStandard OperationTM4UCx#46shielding blocks transfer Shielding blocks have been moved
from ITE to ITW and MAA is secured.
  
  2741   Monday, January 06, 2025, 08:38 Frank SongITWStandard OperationTM4UCx#46module disconnection TM4 WITH UCx#46 was disconnected
in 2025-01-02 in ITW. Forms attached.
 TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf 
  2743   Wednesday, January 08, 2025, 07:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#46UCx#46 removalUCx#46 removed from TM4 and placed into
a pail back-filled with argon. Nothing visually
unusual; no issues.
 TM4_UCx46_07012024.jpegTM4_UCx46_2_07012024.jpeg 
  2595   Wednesday, May 22, 2024, 12:32 David WangSouth Hot-CellStandard OperationTM4UCx#45TM4 has been moved from SHC to TCS.TM4 has been moved from SHC to TCS. the
move is smooth. 
  
  2596   Wednesday, May 22, 2024, 12:43 David WangSouth Hot-CellStandard OperationTM4UCx#45electrical check and leak check were done on TM4 UCx#45 target at SHC.electrical check and leak check were done
on TM4 UCx#45 target at SHC.  everything
is ok. See attachment
 Scanned_from_a_Xerox_Multifunction_Printer.pdf 
  2599   Friday, May 24, 2024, 08:10 chad fisherSouth Hot-CellStandard OperationTM4UCx#45UCx#45 InstallationOn Wednesday, May 22, 2024 UCx#45 was installed
on TM4 in the SHC. Installation was normal
other then minor issue with the multipin
  
  2600   Tuesday, May 28, 2024, 07:45 David WangConditioning StationStandard OperationTM4UCx#45TCS was argon vented this morning between 6:00 and 7:30am. TCS was argon vented this morning between
6:00 and 7:30am for TM4 moving to ITW.
  
  2601   Tuesday, May 28, 2024, 10:13 David WangITWStandard OperationTM4UCx#45Tm4 has been moved from TCS to ITW. Tm4 has been moved from TCS to ITW. 
the move is smooth. 
  
  2602   Tuesday, May 28, 2024, 13:49 Frank SongITWStandard OperationTM4UCx#45Module Connection TM4 with new target UCx#45 was connected
in ITW this morning. pls see attachment uploaded
with.
 TM4_with_UCx#45_connection_in_ITW_20240528.pdf 