223
|
Wednesday, December 05, 2012, 15:53 |
Anders Mjos | South Hot-Cell | Standard Operation | | UCx#5 | Target inspection - target tube broken |
The target was inspected today.
It was found that the target tube had broken on both sides of the centre block in the region that contain target material. The Ta-foil heat shield was removed from the let side tube to allow inspection.
Photos can be found on DocuShare:
https://documents.triumf.ca/docushare/dsweb/View/Collection-9357 |
224
|
Thursday, December 06, 2012, 08:57 |
Travis Cave | Spent Target Vault | Standard Operation | | UCx#5 | Spent target move |
UCx #5 has been moved from the south hot cell to the storage vault. It is in Pail 102, in spot 2A of the vault and had a field of 32.6mSv/hr upon extraction from the south hot cell. See attached PDF for vault details. |
Attachment 1: Vault_Storage_December_6_2012.pdf
|
|
2723
|
Tuesday, November 26, 2024, 14:52 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | UCx#47 | UC#47 LP-SIS w/ gas Install |
November 26, 2024 - Aaron Tam
Handover from TPO and inspection
- Completed
- Some modification to the center Inner-Outer conductor had to be made (hole enlarged as tab was slightly short)
Target Insertion:
Target Mounting:
- Upon fully seating UC#47 on service tray locating pins, the gas line VCR gasket came off
- Operator doesn't have line-of-sight to this area, so there has to be healthy clearance (Foreshadowing)
- Gas line VCR gasket reinstalled using manipulators
- 2nd seating of UC#47 on service tray locating pins, the gas line VCR gasket came off again
- Some alignment interference with the gas line coupling is the cause of the gasket falling off during placement (photo attached)
- Gas line on service tray was loosened, raised to highest position and fastened (Photo attached)
- Failed to re-install VCR gasket (Plastic separated from gasket material)
- Target removed from Hot cell to reinstall gaskets and make modifications to the gas-line coupling
- Gas line coil plastically deformed to give less of a spring action so the coupling can stay down under friction until it is time to couple
- Target carefully inserted into hot cell without disturbing spring/friction of gas-line coupling.
- This had to be repeated several times. Once for the waterline gaskets coming off, and a few other times to insert the target/tray without disturbing sprung coupling
- Target mounted without issue after the above steps successfully
Gas and Water Services:
- VCR connections coupled
- Leak test passed
- leak test faster today because module had been left in silo for a long time to dry out.
- Gas line no-longer needed, so was not checked
Electrical Services:
- Conductor bolts installed
- All bolts (including mounting bolts) checked for fit with mirror
- Coil conductor bolts torqued to at least 130inch-lbs
- Electrical test completed
Containment box panel reinstalled
Cleared area around module for craning out.
|
Attachment 1: Gas_line_interference.jfif
|
Attachment 2: Gas_line_Gasket_reinstalled.jfif
|
Attachment 3: Gas_line_moved_to_highest_position.jfif
|
Attachment 4: Target_Installed_photo.jfif
|
Attachment 5: Inside_of_containment_box_panel.jfif
|
Attachment 6: Completed_photo_(module_with_panel_on).jfif
|
2721
|
Tuesday, November 26, 2024, 13:03 |
Frank Song | South Hot-Cell | Standard Operation | TM3 | UCx#47 | electrical check/leak check |
An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls. |
Attachment 1: TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
|
|
2729
|
Wednesday, December 04, 2024, 08:05 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | Module Connection |
TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. |
Attachment 1: TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf
|
|
2735
|
Monday, December 09, 2024, 13:10 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM3 | UCx#47 | shielding blocks transfer |
5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving. |
2740
|
Friday, January 03, 2025, 12:34 |
Frank Song | 5 Shielding Blocks | Maintenance | | UCx#47 | shielding blocks moving |
Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025 winter shut down . |
2747
|
Monday, January 13, 2025, 10:36 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | module disconnection |
TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC. |
Attachment 1: TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf
|
|
2748
|
Tuesday, January 14, 2025, 10:00 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#47 | after operation electrical check, Tm3 UCx 47 |
TM3 UCx#47 after operation electrical check is done at SHC. The result is normal. See attachment. |
Attachment 1: TM3_UCX_47_after_operation_electrical_check.pdf
|
|
2715
|
Friday, November 08, 2024, 10:44 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | UCx#46 | UCx#46 Install and Parasitic Target Status |
November 6, 2024 - Aaron Tam
UCx#46 Target handover from TPO
Target insertion: successful
Parasitic Install: All Parasitic targets left off target
- Left side In-beam array type parasitic install attempt #1
- Parasitic assembly is too thin/studs too tall for the socket nut to fasten onto target. Stud protrudes through the length of socket section, not allowing tool to insert
- previously a 3/4 spacer was used to give space for thermal couple to enter
- Install of 3/4 spacer was difficult because it does not hold its shape when handled (pivots around 1/2 ad 1/4 portions)
- With spacer installed, parasitic assembly is too thick for socket nuts to fasten onto studs.
- It may have been possible to back out studs to use, but left off in the interest of time UCx is exposed.
- Right side In-beam window type parasitic install
- Similarly to Left side, studs were too short for install, studs could be backed out, but was left off in the interest of time UCx exposed
- PEEK seal parasitic targets were left off as per schedule, and will be leak checked at another date (after tong cable has been repaired)
- Order of PEEK seal locations preserved and follows order as seen with target installed (Photo attached)
Target install: successful
Leak Check: Successful
Electrical Check: Successful
- Initially failed due to wiring diagram being different between production wiring diagram and electrical test sheet
Containment box panel closed
|
Attachment 1: Left_side_Array_Parasitic_with_floppy_spacer.jfif
|
Attachment 2: Right_side_Window_Parasitic.jfif
|
Attachment 3: Lid_Parasitics_order.jfif
|
2717
|
Tuesday, November 12, 2024, 12:30 |
Frank Song | ITW | Standard Operation | TM4 | UCx#46 | Module Connection |
TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls. |
Attachment 1: TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
|
|
2719
|
Thursday, November 21, 2024, 14:11 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM4 | UCx#46 | shielding blocks transfer |
Shielding blocks have been moved from ITE to ITW and MAA is secured. |
2741
|
Monday, January 06, 2025, 08:38 |
Frank Song | ITW | Standard Operation | TM4 | UCx#46 | module disconnection |
TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached. |
Attachment 1: TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
|
|
2743
|
Wednesday, January 08, 2025, 07:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#46 | UCx#46 removal |
UCx#46 removed from TM4 and placed into a pail back-filled with argon. Nothing visually unusual; no issues. |
Attachment 1: TM4_UCx46_07012024.jpeg
|
|
Attachment 2: TM4_UCx46_2_07012024.jpeg
|
|
2595
|
Wednesday, May 22, 2024, 12:32 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | TM4 has been moved from SHC to TCS. |
TM4 has been moved from SHC to TCS. the move is smooth. |
2596
|
Wednesday, May 22, 2024, 12:43 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | electrical check and leak check were done on TM4 UCx#45 target at SHC. |
electrical check and leak check were done on TM4 UCx#45 target at SHC. everything is ok. See attachment
helium pressure test on TM4 HS line at TCS is done. No leak. |
Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer.pdf
|
|
2599
|
Friday, May 24, 2024, 08:10 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#45 | UCx#45 Installation |
On Wednesday, May 22, 2024 UCx#45 was installed on TM4 in the SHC. Installation was normal other then minor issue with the multipin connector drive screw not engaging and/or driving properly. This was remedied by loosening the left guide bolt slightly (1/2 turn). After loosening the multipin drove in and seated correctly (verified by camera). High current fasteners torqued to 130 in lbs. |
2600
|
Tuesday, May 28, 2024, 07:45 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx#45 | TCS was argon vented this morning between 6:00 and 7:30am. |
TCS was argon vented this morning between 6:00 and 7:30am for TM4 moving to ITW. |
2601
|
Tuesday, May 28, 2024, 10:13 |
David Wang | ITW | Standard Operation | TM4 | UCx#45 | Tm4 has been moved from TCS to ITW. |
Tm4 has been moved from TCS to ITW. the move is smooth. |
2602
|
Tuesday, May 28, 2024, 13:49 |
Frank Song | ITW | Standard Operation | TM4 | UCx#45 | Module Connection |
TM4 with new target UCx#45 was connected in ITW this morning. pls see attachment uploaded with. |
Attachment 1: TM4_with_UCx#45_connection_in_ITW_20240528.pdf
|
|