Entry  Wednesday, December 05, 2012, 15:53, Anders Mjos, South Hot-Cell, Standard Operation, , UCx#5, Target inspection - target tube broken 
The target was inspected today.
It was found that the target tube had broken on both sides of the centre block in the region that contain target material. The Ta-foil heat shield
was removed from the let side tube to allow inspection.
Entry  Thursday, December 06, 2012, 08:57, Travis Cave, Spent Target Vault, Standard Operation, , UCx#5, Spent target move Vault_Storage_December_6_2012.pdf
UCx #5 has been moved from the south hot cell to the storage vault. It is in Pail 102, in spot 2A of the vault and had a field of 32.6mSv/hr upon extraction
from the south hot cell. See attached PDF for vault details.
Entry  Tuesday, November 26, 2024, 14:52, Aaron Tam, South Hot-Cell, Standard Operation, TM3, UCx#47 , UC#47 LP-SIS w/ gas Install 6x
 November 26, 2024 - Aaron Tam 
Handover from TPO and inspection

    Completed
    Some modification to the center Inner-Outer conductor had to be made (hole enlarged as tab was slightly short)

Target
Entry  Tuesday, November 26, 2024, 13:03, Frank Song, South Hot-Cell, Standard Operation, TM3, UCx#47, electrical check/leak check TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls.
Entry  Wednesday, December 04, 2024, 08:05, Frank Song, ITE, Standard Operation, TM3, UCx#47, Module Connection TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf
TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. 
Entry  Monday, December 09, 2024, 13:10, Frank Song, 5 Shielding Blocks, Standard Operation, TM3, UCx#47, shielding blocks transfer 
 5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving.
Entry  Friday, January 03, 2025, 12:34, Frank Song, 5 Shielding Blocks, Maintenance, , UCx#47, shielding blocks moving 
 Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025
winter shut down .
Entry  Monday, January 13, 2025, 10:36, Frank Song, ITE, Standard Operation, TM3, UCx#47, module disconnection TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf
 TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC.
Entry  Tuesday, January 14, 2025, 10:00, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#47, after operation electrical check, Tm3 UCx 47 TM3_UCX_47_after_operation_electrical_check.pdf
TM3 UCx#47 after operation electrical check  is done at SHC. The result is normal. See attachment.
Entry  Friday, November 08, 2024, 10:44, Aaron Tam, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 Install and Parasitic Target Status  Left_side_Array_Parasitic_with_floppy_spacer.jfifRight_side_Window_Parasitic.jfifLid_Parasitics_order.jfif
November 6, 2024 - Aaron Tam 
UCx#46 Target handover from TPO 
Target insertion: successful 
Entry  Tuesday, November 12, 2024, 12:30, Frank Song, ITW, Standard Operation, TM4, UCx#46, Module Connection TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
 TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls.
Entry  Thursday, November 21, 2024, 14:11, Frank Song, 5 Shielding Blocks, Standard Operation, TM4, UCx#46, shielding blocks transfer 
 Shielding blocks have been moved from ITE to ITW and MAA is secured.
Entry  Monday, January 06, 2025, 08:38, Frank Song, ITW, Standard Operation, TM4, UCx#46, module disconnection TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
 TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached.
Entry  Wednesday, January 08, 2025, 07:37, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 removal TM4_UCx46_07012024.jpegTM4_UCx46_2_07012024.jpeg
UCx#46 removed from TM4 and placed into a pail back-filled with argon. Nothing visually unusual; no issues.
Entry  Wednesday, May 22, 2024, 12:32, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, TM4 has been moved from SHC to TCS. 
TM4 has been moved from SHC to TCS. the move is smooth. 
Entry  Wednesday, May 22, 2024, 12:43, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, electrical check and leak check were done on TM4 UCx#45 target at SHC. Scanned_from_a_Xerox_Multifunction_Printer.pdf
electrical check and leak check were done on TM4 UCx#45 target at SHC.  everything is ok. See attachment
helium pressure test on TM4 HS line at TCS is done.   No leak.
Entry  Friday, May 24, 2024, 08:10, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#45, UCx#45 Installation 
On Wednesday, May 22, 2024 UCx#45 was installed on TM4 in the SHC. Installation was normal other then minor issue with the multipin connector drive screw
not engaging and/or driving properly. This was remedied by loosening the left guide bolt slightly (1/2 turn). After loosening the multipin drove in and
seated correctly (verified by camera). High current fasteners torqued to 130 in lbs.
Entry  Tuesday, May 28, 2024, 07:45, David Wang, Conditioning Station, Standard Operation, TM4, UCx#45, TCS was argon vented this morning between 6:00 and 7:30am.  
TCS was argon vented this morning between 6:00 and 7:30am for TM4 moving to ITW.
Entry  Tuesday, May 28, 2024, 10:13, David Wang, ITW, Standard Operation, TM4, UCx#45, Tm4 has been moved from TCS to ITW.  
Tm4 has been moved from TCS to ITW.  the move is smooth. 
Entry  Tuesday, May 28, 2024, 13:49, Frank Song, ITW, Standard Operation, TM4, UCx#45, Module Connection TM4_with_UCx#45_connection_in_ITW_20240528.pdf
 TM4 with new target UCx#45 was connected in ITW this morning. pls see attachment uploaded with.