Wednesday, December 05, 2012, 15:53, Anders Mjos, South Hot-Cell, Standard Operation, , UCx#5, Target inspection - target tube broken
|
The target was inspected today.
It was found that the target tube had broken on both sides of the centre block in the region that contain target material. The Ta-foil heat shield was removed from the let side tube to allow inspection.
Photos can be found on DocuShare:
https://documents.triumf.ca/docushare/dsweb/View/Collection-9357 |
Thursday, December 06, 2012, 08:57, Travis Cave, Spent Target Vault, Standard Operation, , UCx#5, Spent target move
|
UCx #5 has been moved from the south hot cell to the storage vault. It is in Pail 102, in spot 2A of the vault and had a field of 32.6mSv/hr upon extraction from the south hot cell. See attached PDF for vault details. |
Tuesday, November 26, 2024, 14:52, Aaron Tam, South Hot-Cell, Standard Operation, TM3, UCx#47 , UC#47 LP-SIS w/ gas Install 6x
|
November 26, 2024 - Aaron Tam
Handover from TPO and inspection
- Completed
- Some modification to the center Inner-Outer conductor had to be made (hole enlarged as tab was slightly short)
Target Insertion:
Target Mounting:
- Upon fully seating UC#47 on service tray locating pins, the gas line VCR gasket came off
- Operator doesn't have line-of-sight to this area, so there has to be healthy clearance (Foreshadowing)
- Gas line VCR gasket reinstalled using manipulators
- 2nd seating of UC#47 on service tray locating pins, the gas line VCR gasket came off again
- Some alignment interference with the gas line coupling is the cause of the gasket falling off during placement (photo attached)
- Gas line on service tray was loosened, raised to highest position and fastened (Photo attached)
- Failed to re-install VCR gasket (Plastic separated from gasket material)
- Target removed from Hot cell to reinstall gaskets and make modifications to the gas-line coupling
- Gas line coil plastically deformed to give less of a spring action so the coupling can stay down under friction until it is time to couple
- Target carefully inserted into hot cell without disturbing spring/friction of gas-line coupling.
- This had to be repeated several times. Once for the waterline gaskets coming off, and a few other times to insert the target/tray without disturbing sprung coupling
- Target mounted without issue after the above steps successfully
Gas and Water Services:
- VCR connections coupled
- Leak test passed
- leak test faster today because module had been left in silo for a long time to dry out.
- Gas line no-longer needed, so was not checked
Electrical Services:
- Conductor bolts installed
- All bolts (including mounting bolts) checked for fit with mirror
- Coil conductor bolts torqued to at least 130inch-lbs
- Electrical test completed
Containment box panel reinstalled
Cleared area around module for craning out.
|
Tuesday, November 26, 2024, 13:03, Frank Song, South Hot-Cell, Standard Operation, TM3, UCx#47, electrical check/leak check
|
An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls. |
Wednesday, December 04, 2024, 08:05, Frank Song, ITE, Standard Operation, TM3, UCx#47, Module Connection
|
TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. |
Monday, December 09, 2024, 13:10, Frank Song, 5 Shielding Blocks, Standard Operation, TM3, UCx#47, shielding blocks transfer
|
5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving. |
Friday, January 03, 2025, 12:34, Frank Song, 5 Shielding Blocks, Maintenance, , UCx#47, shielding blocks moving
|
Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025 winter shut down . |
Monday, January 13, 2025, 10:36, Frank Song, ITE, Standard Operation, TM3, UCx#47, module disconnection
|
TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC. |
Tuesday, January 14, 2025, 10:00, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#47, after operation electrical check, Tm3 UCx 47
|
TM3 UCx#47 after operation electrical check is done at SHC. The result is normal. See attachment. |
Friday, November 08, 2024, 10:44, Aaron Tam, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 Install and Parasitic Target Status
|
November 6, 2024 - Aaron Tam
UCx#46 Target handover from TPO
Target insertion: successful
Parasitic Install: All Parasitic targets left off target
- Left side In-beam array type parasitic install attempt #1
- Parasitic assembly is too thin/studs too tall for the socket nut to fasten onto target. Stud protrudes through the length of socket section, not allowing tool to insert
- previously a 3/4 spacer was used to give space for thermal couple to enter
- Install of 3/4 spacer was difficult because it does not hold its shape when handled (pivots around 1/2 ad 1/4 portions)
- With spacer installed, parasitic assembly is too thick for socket nuts to fasten onto studs.
- It may have been possible to back out studs to use, but left off in the interest of time UCx is exposed.
- Right side In-beam window type parasitic install
- Similarly to Left side, studs were too short for install, studs could be backed out, but was left off in the interest of time UCx exposed
- PEEK seal parasitic targets were left off as per schedule, and will be leak checked at another date (after tong cable has been repaired)
- Order of PEEK seal locations preserved and follows order as seen with target installed (Photo attached)
Target install: successful
Leak Check: Successful
Electrical Check: Successful
- Initially failed due to wiring diagram being different between production wiring diagram and electrical test sheet
Containment box panel closed
|
Tuesday, November 12, 2024, 12:30, Frank Song, ITW, Standard Operation, TM4, UCx#46, Module Connection
|
TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls. |
Thursday, November 21, 2024, 14:11, Frank Song, 5 Shielding Blocks, Standard Operation, TM4, UCx#46, shielding blocks transfer
|
Shielding blocks have been moved from ITE to ITW and MAA is secured. |
Monday, January 06, 2025, 08:38, Frank Song, ITW, Standard Operation, TM4, UCx#46, module disconnection
|
TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached. |
Wednesday, January 08, 2025, 07:37, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 removal
|
UCx#46 removed from TM4 and placed into a pail back-filled with argon. Nothing visually unusual; no issues. |
Wednesday, May 22, 2024, 12:32, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, TM4 has been moved from SHC to TCS.
|
TM4 has been moved from SHC to TCS. the move is smooth. |
Wednesday, May 22, 2024, 12:43, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, electrical check and leak check were done on TM4 UCx#45 target at SHC.
|
electrical check and leak check were done on TM4 UCx#45 target at SHC. everything is ok. See attachment
helium pressure test on TM4 HS line at TCS is done. No leak. |
Friday, May 24, 2024, 08:10, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#45, UCx#45 Installation
|
On Wednesday, May 22, 2024 UCx#45 was installed on TM4 in the SHC. Installation was normal other then minor issue with the multipin connector drive screw not engaging and/or driving properly. This was remedied by loosening the left guide bolt slightly (1/2 turn). After loosening the multipin drove in and seated correctly (verified by camera). High current fasteners torqued to 130 in lbs. |
Tuesday, May 28, 2024, 07:45, David Wang, Conditioning Station, Standard Operation, TM4, UCx#45, TCS was argon vented this morning between 6:00 and 7:30am.
|
TCS was argon vented this morning between 6:00 and 7:30am for TM4 moving to ITW. |
Tuesday, May 28, 2024, 10:13, David Wang, ITW, Standard Operation, TM4, UCx#45, Tm4 has been moved from TCS to ITW.
|
Tm4 has been moved from TCS to ITW. the move is smooth. |
Tuesday, May 28, 2024, 13:49, Frank Song, ITW, Standard Operation, TM4, UCx#45, Module Connection
|
TM4 with new target UCx#45 was connected in ITW this morning. pls see attachment uploaded with. |
|