  12   Friday, July 22, 2011, 10:30 Bevan MossConditioning StationRepairTM1 TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs

    

       
            
  
  11   Thursday, July 21, 2011, 17:39 Bevan MossConditioning StationRepairTM1 TM1 Ground Electrode, Thermocouple line, Stem, panel, repairsOver the
period of July 20-21st TM1 had several repairs
completed and tested. The easiest of the
 IMG_1681.JPGIMG_1662.JPGIMG_1686.JPGIMG_1695.JPG 
  10   Wednesday, July 20, 2011, 09:55 Travis CaveITEStandard OperationTM4Ta#36Move of TM#4 from South Hot Cell to East Target Station.Move completed, move went well.   
  9   Tuesday, July 19, 2011, 13:51 chad fisherSouth Hot-CellStandard OperationTM4Ta#36TM4 Ta#36 Leak Check ResultsTm4 w/ Ta#36 has been vacuum leak checked
using the standard leak check procedure.
At 1:45pm RH was contacted to notify
 DOC.PDF 
  8   Tuesday, July 19, 2011, 12:25 maicodallavalleSouth Hot-CellStandard OperationTM4Ta36TM4 Ta36 Target was put into the south hot cell.Ta36 was check by Maico and Chad.It was
then carried into the anteroom.From the anteroom
it was transferred into the south hot cell.
  
  7   Tuesday, July 19, 2011, 12:02 Travis CaveSouth Hot-CellStandard OperationTM4Ta#36Electrical checkSee attached PDF for the details.  TM#4_SIS_Elec_Check2.pdf 
  6   Tuesday, July 19, 2011, 11:52 chad fisherSouth Hot-CellStandard OperationTM4Ta#36New target Ta#36 Installed on TM4Ta#36 has been installed on TM4 and is
awaiting leak and electrical check.
A small piece of the standard top
 DSC_0897.JPGDSC_0899.JPGDSC_0901.JPGDSC_0905.JPG 
  5   Tuesday, July 19, 2011, 11:17 Travis CaveSouth Hot-CellStandard OperationTM4Ta#35Move of TM#4 from East target station to south hot cell.Move went well no problems readings at
East Target Station were very high at 500mSv/hr.
  
  4   Thursday, June 30, 2011, 16:04 Pierre BricaultConditioning StationRepairTM1 TM1 statusFriday June 24 2011
The target module has been moved
to the Conditioning Station (CS)
  