  RH-ISAC, Page 137 of 141  Not logged in ELOG logo
Entry  Wednesday, July 10, 2024, 09:55, Adam Newsome, Safe Module Parking, Maintenance, , , Annual electrical and mechanical inspection of Safe Module Parking  PXL_20240710_160636341.jpgPXL_20240710_160506424.jpg
An annual electrical and mechanical inspection was performed on the   SMP today by Adam Newsome, Travis Cave, Riley Sykes, Maico Dalla Valle, and Jason
Zhang as per Work  Permit  I2024-07-10-1. The  following items were checked:

    Check condition of wiring for physical/radiation/UV damage
    
        OK, no signs of significant damage
    
Entry  Wednesday, July 10, 2024, 10:44, Riley Sykes, South Hot-Cell, Maintenance, , , Spring idler install Image.jfifImage_(2).jfif
 New spring idlers were installed onto rotational chain drive for SHC roof. Operation ran smoothly in both directions to full limit. Chain was noted
to have adequate slack when not on driven side. Periodic checks to confirm operation will continue in the following months to guarantee proper operation.
Entry  Friday, July 12, 2024, 08:51, Riley Sykes, Safe Module Parking, Maintenance, , , SMP chain guard 
 SS washers were added to all slotted holes on SMP chainguard cover plate
Entry  Wednesday, July 17, 2024, 15:06, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround Complete - SHC/NHC Area 
A safety walkaround for July 2024 was completed for the B2 level by A. Newsome. No deficiencies to report.
Results can be found in the master
spreadsheet
Entry  Thursday, July 18, 2024, 11:22, Travis Cave, Spent Target Vault, Standard Operation, , UC#45, Spent Target Move Target_Index_2024-07-18.pdf
 The UC#45 target was moved from the south hot cell to the spent target vault. It was place in Pail#292 spot 1A of the vault, was 19.5mSv/hr. Also
this pail contains the target material of UC#44. See attached PDF for more details.
Entry  Wednesday, July 24, 2024, 10:10, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer 
 5 shielding blocks have been transferred from ITE to ITW. MAA is secured again after moving.
Entry  Wednesday, August 14, 2024, 11:29, Aaron Tam, Waste Package/Ship, Standard Operation, , SiC#46, Target Disposal and visual check  SiC46.jfif
 SiC#46 loaded into pail 293 successfully along with other hotcell waste 
Upon visual inspection of the target, a spark-sign was spotted on the perimeter of the extraction electrode. Metallic looking material also found
built up between the extraction electrode and the backing plate of the target 
Entry  Friday, August 16, 2024, 08:47, Travis Cave, Spent Target Vault, Standard Operation, , SiC#46, Spent Target Move Target_Index_2024-08-16.pdf
 SiC#46 (pail 293) was placed in the vault (spot 3B) on Wednesday the 14th of August. It was 111 mSv/hr when removed from the south hot
cell. See attached PDF for details.
Entry  Tuesday, August 20, 2024, 11:36, Carla Babcock, South Hot-Cell, Standard Operation, , TiC#7, TiC#7 PIE 
TiC#7 failed after two weeks of operations - measurements in the electrical room indicated that the negative side of the CHT was broken (35kOhms to the
rest of the target). This was likely due to a large number of proton trips during this target run. At every trip I could see the CHT voltage getting higher
and more unstable. This cahnge in voltage was reflected in the unstable anode current and fluctuating RIB beam intensity, as a direct result of the fluctuating
Entry  Tuesday, August 20, 2024, 11:53, Carla Babcock, South Hot-Cell, Standard Operation, , Nb#10, Nb#10 PIE 
Nb#10 never worked online - repeller had no effect on the beam and one of the RF wires was touching HVC. Max 60pA was seen on the source cup. See notes
here ITW-TM2-Nb#10/#11-LP-IGLIS 
(Web
Entry  Wednesday, August 21, 2024, 10:53, Travis Cave, Spent Target Vault, Standard Operation, , TiC#7, Spent Target Move Target_Index_2024-08-21.pdf
 TIC#7 was placed in pail #294 and then moved from the south hot cell to the spent target vault spot 4B. It was 82.3mSv/hr when removed from the
SHC. See attached PDF for details.
Entry  Monday, August 26, 2024, 09:57, Travis Cave, Spent Target Vault, Standard Operation, , Nb#10, Spent Target Move Target_Index_2024-08-26.pdf
 Nb#10 was placed in pail#295 and moved from the south hot cell to the spent target vault, spot 4A, it was 230uSv/hr when removed from the SHC.
See attached PDF for vault details.
Entry  Thursday, September 05, 2024, 12:50, Adam Newsome, Crane, Maintenance, , , Overhead crane: up/down hoist delayed start issue 
D. Wang reports that recently the overhead crane has been exhibiting a delayed start (approx. 1 min) when operating in local mode. This issue applies
to the main hoist's up/down functionality only and does not seem to apply to other motion axes. T. Kauss briefly investigated but did not find any obvious
cause.
Entry  Friday, September 06, 2024, 14:28, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68(Spare), Ta#68(Spare) removed from TM4 and into Anteroom  
September 5, 2024 -AT

    Plastic and clean target tray added to SHC 
    TM4 moved to SHC 
    TM4 containment box cover removed

September
6, 2024 - AT
Entry  Wednesday, September 11, 2024, 13:38, Adam Newsome, North Hot-Cell, Repair, , , Spare Manipulator - Y-axis motion not functioning 
Update 2024-09-12: C. Fisher confirms this is actually normal behaviour. The Y-axis motion is inhibited when X and Z
are in a certain configuration, which was true when the manipulator was mounted on the wall in storage position. Non-issue. A note about this has been
made in the operator manual.
Entry  Thursday, September 12, 2024, 14:12, Adam Newsome, Waste Package/Ship, Development, , SiC#44, Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44) Report_on_Inspection_of_Pail_275_on_2024-10-03.pdf
On 2024-09-12, CNL reported difficulty with lowering Pail 275 from F-308 flask #22 into their tile hole. The four other pails associated with this shipment
were successfully emplaced. It is suspected that the issue was related to a kink in the lowering cable, causing a jam during lowering. This was observed
approximately 1 year ago.
Entry  Monday, September 16, 2024, 08:23, chad fisher, North Hot-Cell, Repair, , , Model N Remote end #9352 reapir 
On Friday, September 6, 2024 Model 'N' remote arm #9352 was removed from the NHC right side installed position to investigate  an ongoing issue
with the tong motion circuit (no motion on the remote side when handle on operator side operated).
Inspection revealed that the tong cable on this arm have hopped its cable drum and rapped around the shaft of the cable drum. As well, the tong
Entry  Monday, September 16, 2024, 08:48, chad fisher, Manipulator Maintenance, Maintenance, , , CRL Technicain Manipulator Maitenance Trip Triumf_Document_2024-09-20_102936.pdf
Over the course of September 9th - September 13, 2024 a CRL manipulator technician carried out the following manipulator maintenance:
NHC operator side arm #9763 (right side installed position) - Inspection and re-tensioning of tong cable prior to re-installation (was a little
too tight). Operational.
Entry  Tuesday, September 24, 2024, 09:37, Frank Song, ITE/ITW, Standard Operation, , , shielding blocks transfer 
 5 shielding blocks have been moved from ITE to ITW.
Entry  Wednesday, September 25, 2024, 07:25, David Wang, Cooling, Maintenance, , , HALCW O2 level sensor maintenance.  
HALCW O2 level sensor annual maintenance is done. sensor membrane has been changed and electrolyte has been refilled. gauge is calibrated. It works normal
after the job. 