Tuesday, June 20, 2023, 12:37, Adam Newsome, Assembly/Bench Test, Development, , , Modifications to wire ropes for pails within existing F-308s 6x
|
Based on a request from CNL (attached), modifications were made to the wire ropes protruding through the tops of F-308s to add a crimped loop which acts
as a lifting feature. Tests were performed (report attached) on 10 sample units to validate the strength of these loops, since each loop could not be tested
in-situ once the pails were already packed in F-308s. CNL has reviewed and approved the test report. |
Wednesday, June 21, 2023, 14:39, Adam Newsome, Safe Module Parking, Maintenance, , , Annual electrical and mechanical inspection of Safe Module Parking
|
An annual electrical and mechanical inspection was performed on the SMP today by Adam Newsome, Travis Cave, Eric Lahe, Maico Dalla Valle, Antoniette
Yap, and Jason Zhang as per Work Permit I2023-06-21-4. The following items were checked:
Check condition of wiring for physical/radiation/UV damage
OK, no signs of significant damage
|
Friday, July 28, 2023, 10:09, Adam Newsome, Spent Target Vault, Maintenance, , , Main Storage Vault: Bearing Lubrication
|
Bearings for the main storage vault door were lubricated on 2023-07-28. It is unknown when this was last done. It is suggested that this be a recurring
maintenance task every two years. |
Friday, July 28, 2023, 10:21, Adam Newsome, Spent Target Vault, Maintenance, , , Mini Storage Vault: Bearing Lubrication
|
The bearings on the mini storage vault were lubricated. It is suspected that this has never been done. It is suggested that this be performed every two
years.
A draft procedure will be created for this job, but at a high level, this process involves: |
Tuesday, August 01, 2023, 09:06, Adam Newsome, Crane, Development, , , Measuring Tape and Camera Removed from Target Hall Crane
|
In an effort to clean up the camera installation on top of the ISAC target hall crane to resolve a fault, the position measuring tape and its associated
camera were removed from the target hall crane on July 31, 2023.
|
Friday, September 01, 2023, 10:36, Adam Newsome, Spent Target Vault, Standard Operation, , UCx#42, Spent Target Move
|
UCx #42 moved from North Hot Cell to Storage Vault in Pail #282. Placed in slot 6B. Tray 6 is now full. Pail measured at 34.9 mSv/h at ~1 m upon
removal from the hot cell. See attached updated spreadsheet. |
Thursday, September 14, 2023, 11:16, Adam Newsome, Spent Target Vault, Development, , Ta #58, Investigation of Pail 211 (Ta #58)
|
Upon attempting to lower Pail 211 into their tile hole, CNL encountered issues with the pail getting stuck. They shipped the pail back to TRIUMF and
requested we perform an investigation. The investigation report is attached.
The pail contents must be re-packaged into a new pail. |
Friday, November 17, 2023, 11:12, Adam Newsome, Spent Target Vault, Standard Operation, , , Four pails moved from main storage to mini storage
|
The following four pails were moved from the main storage vault to the mini storage vault, to stage for shipping in Jan. 2024:
1. Pail 260 (SiC#41), Tray 5B
2. Pail 271 (SiC#42), Tray 2B |
Friday, November 17, 2023, 11:28, Adam Newsome, Spent Target Vault, Maintenance, , , Storage vault: issue observed with door opening
|
During operation today, it was observed that the main vault door had issues opening.. typically when the door was around 80-90% opened, it would stop
motion. Note that this issue has allegedly been present since early 2023. It appeared that the motor was still spinning but the clutch was slipping. This
issue was consistent and observed multiple times when trays 2, 5, and 6 were engaged (note these are all on the same side of the vault). It was overcome |
Wednesday, November 22, 2023, 12:24, Adam Newsome, Spent Target Vault, Standard Operation, , Ta#65, Spent Target Move
|
The spent Ta#65 target was removed from the south hot cell and placed in the spent target vault. It was placed in pail #284 and placed in spot 2B. It
was 41 mSv/hr at 1 m upon removal. Target index spreadsheet updated. |
Thursday, November 23, 2023, 11:15, Adam Newsome, Crane, Repair, , , Target Hall Crane: CW/CCW rotation mechanism failure [tripped breaker]
|
It is reported that the crane's hook rotation is not working currently. It was working yesterday (Nov 22). Investigation to follow, and this e-log will
be updated.
|
Tuesday, November 28, 2023, 12:58, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move - Silo to SHC
|
TM3 was moved from the Silo to South Hot Cell. |
Wednesday, December 13, 2023, 11:42, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move - TCS TO SHC
|
TM3 has been moved from the target conditioning station to the south hot cell. |
Friday, December 15, 2023, 11:07, Adam Newsome, Conditioning Station, Standard Operation, TM3, , TM3 Move - SHC to TCS
|
TM3 was moved from the SHC to the TCS (no target installed). |
Friday, December 15, 2023, 11:31, Adam Newsome, Spent Target Vault, Standard Operation, , Ta#58, Pail repack, transfer to mini-storage vault
|
Pail 211 which contained Ta#58 spent target was repackaged into Pail 286 in the South Hot Cell.
The dose rate at approx. 1 m was 4.16 mSv/h.
Pail 286 was transferred to the mini-storage vault and placed in the outermost location. The mini-storage vault is full at this time, in preparation |
Monday, January 08, 2024, 14:47, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 Move - ITW to SHC
|
TM2 was moved from ITW to the South Hot Cell with Ta#66 target. |
Tuesday, January 09, 2024, 16:10, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 Move - SHC to Silo
|
TM2 was moved with no target attached from the South Hot Cell to a silo. |
Friday, February 09, 2024, 12:52, Adam Newsome, Spent Target Vault, Standard Operation, , , F-308 flask loading - five flasks loaded
|
Today (2024-02-09), five flasks were loaded in preparation for shipment with the following targets: SiC#41, SiC#42, Nb#9, UC#36, Ta#58.
Note: prior to shipping, the pails within these flasks will need to have a crimped lifting loop added to them.
The mini-storage vault is now EMPTY. |
Wednesday, February 14, 2024, 11:32, Adam Newsome, Spent Target Vault, Standard Operation, , UCx#43, Spent Target Move
|
Spent target UCx#43 (pail 289) was moved from the South Hot Cell to the Storage Vault, placed in location 2A. Dose rate at 1m was approximately 22.6
mSv/hr.
Target index spreadsheet updated, attached. |
Wednesday, February 14, 2024, 11:34, Adam Newsome, Spent Target Vault, Standard Operation, , Misc., Three pails moved from main vault to mini vault
|
In preparation for F-308 loading, three pails were moved from the main storage vault to the mini storage vault. The following pails were moved:
Pail 270 (C#3)
Pail 276 (UC#39)
Pail 231 (UC#41)
Target Index spreadsheet updated, attached. |
|