Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 134 of 140  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  1838   Friday, December 07, 2018, 10:37 chad fisherNorth Hot-CellRepair  Ariel connector testCompleted testing of connectors for Ariel
using the north hot cell.
Video can be found on docushare;
  
  1056   Tuesday, September 01, 2015, 06:25 David WangConditioning StationStandard OperationTM2ZrCArgon venting TM2 at CSArgon venting TM2 at CS.   
  2437   Wednesday, May 03, 2023, 13:22 David WangITEStandard Operation  Argon vented ITE station. Argon vented ITE station. ITEVV1S and ITGT
SV3 were closed after venting. 
  
  218   Monday, December 03, 2012, 19:34 Grant MinorITEStandard OperationTM4LpUCxArgon supply opened for ITE ventAround 7pm tonight I opened the main valve
approximately 1.5 turns on  the Argon bottle
used for venting ITE, located in the ISAC
 Argon_Vent_ITE_Cylinder_Pressure_3Dec2012.jpgArgon_Vent_ITE_Secondary_Regulator_Pressure_Relief_3Dec2012.jpgArgon_Vent_ITE_Needle_Valve_3Dec2012.jpg 
  26   Thursday, September 01, 2011, 09:11 Don JacksonITWStandard OperationTM1UCx#2Argon Venting West StationWest target station is setup to use argon
for tank venting.  There is 1200 PSI
remaining on argon bottle in electrical room. 
  
  368   Monday, May 27, 2013, 16:36 Bevan MossConditioning StationStandard OperationTM4Ta#40Argon Venting Started Argon venting has started. It will
be left to vent over night. 
  
  1981   Tuesday, September 10, 2019, 08:25 David WangConditioning StationStandard OperationTM4UCx27Argan vent TCS.TCS is argon vented. TM4 is disconnected
at TCS. 
  
  886   Wednesday, April 15, 2015, 09:01 Anders MjosConditioning StationDevelopment  Archiver variables added by Controls 
 
 
  
  1314   Wednesday, August 10, 2016, 12:18 chad fisherSouth Hot-CellMaintenance  Anteroom clearingBlack "radio active" materials
cabinet has been emptied, items bagged and
removed from the anteroom. Cabinet itself
  
  1306   Friday, August 05, 2016, 13:50 chad fisherSouth Hot-CellMaintenance  Anteroom clean outSome items have been removed from the anteroom
in preparation for painting. Items have been
placed on plastic in the south hot cell service
  
  1308   Monday, August 08, 2016, 11:24 chad fisherSouth Hot-CellMaintenance  Anteroom Clean-up - WaveguideThe wave guide from TM3 has been surveyed,
swiped and removed from the anteroom and
transported to rad waste for disposal. The
  
  1330   Wednesday, August 24, 2016, 09:19 chad fisherSouth Hot-CellMaintenance  Anteroom Clean -up paint prepRemaining items from anteroom have been
bagged and removed (save the boot boxes,
1 garbage can and 1 coverall garbage can).
  
  441   Wednesday, September 04, 2013, 12:21 Bevan MossSouth Hot-CellRepairTM3 Ante-room work September 3rd
David Wang and myself lowered the
leak testing cart into the Ante room and
 IMG_0983.JPG 
  1104   Thursday, October 15, 2015, 14:17 chad fisherSouth Hot-CellRepairTM2 Anode Connector Install and adjustmentThe TM2 containment box was removed this
morning for installation of the 9 pin connector...connection.
The 9 pin connector copper tube connection
 20151015_085914.jpg 
  2462   Wednesday, June 21, 2023, 14:39 Adam NewsomeSafe Module ParkingMaintenance  Annual electrical and mechanical inspection of Safe Module ParkingAn annual electrical and mechanical inspection
was performed on the  SMP today by Adam Newsome,
Travis Cave, Eric Lahe, Maico Dalla Valle,
 PXL_20230621_210144119.MP.jpgPXL_20230621_210546559.jpgPXL_20230621_210146892.jpg 
  2587   Wednesday, May 08, 2024, 14:01 Frank SongITWMaintenance  Annual clean up for ITW Faraday cage The ITW Faraday Cage has been cleaned,
this is part of Winter Shut Down job happens
in ISAC-1 Electric maintenance room annually.
  
  2753   Wednesday, January 22, 2025, 10:29 Frank SongFaraday CageMaintenance  Annual clean up for ITE/ITW Faraday cages  David and I cleaned both cages in
ISAC1 electric room, all done.
  
  2343   Monday, July 04, 2022, 11:44 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Mechanical  
An
 SMP_Missing_Washers_1.jpgSMP_Missing_Washers_2.jpgSMP_Missing_shims.jpg 
  2342   Thursday, June 30, 2022, 14:28 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Electrical  
An annual electrical
  
  2318   Friday, May 06, 2022, 10:12 Adam NewsomeSpent Target VaultMaintenance  Annual Inspection of Mini-Storage VaultThe annual inspection of the mini-storage
vault was performed today. The following
items were checked:
  
ELOG V2.9.2-2455