Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1330     Entry time: Wednesday, August 24, 2016, 09:19
Author: chad fisher 
Category: South Hot-Cell 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Anteroom Clean -up paint prep 

Remaining items from anteroom have been bagged and removed (save the boot boxes, 1 garbage can and 1 coverall garbage can).

Room is ready to be surveyed so it can be deemed a non-boot box area for painting.

ELOG V2.9.2-2455