  135   Tuesday, June 26, 2012, 14:10 David WangSouth Hot-CellRepairTM3 TM3 heat shield and window circuits leak check is done.Chad and i did a leak check on TM3 heat
shield and window circuits.Both circuits
are pumped easily down to the bottom leak
  
  134   Monday, June 25, 2012, 14:39 David WangITWStandard Operation  I moved 5 shielding blocks from ITE to ITW,and set up ventilation for ITW. ITW is
ready for taking proton beam now. All water
interlock checks for ITW are done. The ITW
  
  133   Monday, June 25, 2012, 07:53 chad fisherSouth Hot-CellRepairTM3N/ATM3 Refurb. WorkOn Friday, June 22 the following work was
carried out.

    Further inspection of
  
  132   Thursday, June 21, 2012, 14:33 chad fisherSouth Hot-CellRepairTM3N/APictures TM3 June 21stHere are the pictures from today...there
is video too but it is not uploaded yet.
 8x 
  131   Thursday, June 21, 2012, 14:30 chad fisherSouth Hot-CellRepairTM3N/ATM3 Refurbishment StartStarted refurb of TM3.
Planned activities:
Inspection
  
  130   Thursday, June 21, 2012, 14:00 Travis CaveSouth Hot-CellRepairTM3no targetmodule moveTM#3 has been moved from the south west
silo to the south hot cell for the start
of its second refurb/repair. The fields of
  
  129   Wednesday, June 20, 2012, 11:39 Grant MinorSouth Hot-CellDevelopmentTM3N/ATM3 Planned Activites at South Hot Cell Jun 20 to 29 2012

Normal
0




false
false
false
  
  128   Tuesday, June 19, 2012, 16:18 David WangITWStandard OperationTM1Ta38TM1connected in ITW
 

 Normal
  0

 
   
  
  127   Tuesday, June 19, 2012, 10:35 Travis CaveITWStandard OperationTM1Ta#38module moveTM#1 with Ta#38 moved from the conditioning
station to the west target station. Move
went well.
  
  126   Monday, June 11, 2012, 14:41 David WangConditioning StationStandard OperationTM1Ta38Heat shield helium pressure testConnected leak detector to TM1 and CS vacuum
system. The vacuum readings on TM1 and CS:PNG1
1.3 xE-6 Torr, IG1 4.7xE-7torr, IG4(diagnostic
  
  125   Monday, June 11, 2012, 14:14 Travis CaveConditioning StationStandard OperationTM1Ta#38Electrical checkElectrical check of TM#1 with Ta#38 at
the conditioning station under vacuum. See
attached file for details.
 TM#1_Ta38_at_constat_elec_check.PDF 
  124   Monday, June 11, 2012, 10:52 Travis CaveSpent Target VaultStandard Operation Nb#6Spent target moveThe Nb#6 target has been moved from the
south hot cell into storage. It was place
in pail #95 and is in slot 5C of the vault.
 Vault_Storage_June_11_2012.pdf 
  123   Friday, June 08, 2012, 15:03 Don JacksonSouth Hot-CellStandard OperationTM1Ta38Electrical Check on new Ta38 at hot cellMegger checks were exceptionally high (good). 
Readings taken less than 2 hours after reading low
values from end of run on Nb#6.  Tests
 Ta38_New_Target.JPG 
  122   Friday, June 08, 2012, 15:00 Don JacksonSouth Hot-CellStandard OperationTM1Nb#6Electrical Check Nb#6 at end of runMegger check values were low but still
within operational range.
 Nb#6_End_of_Run.JPG 
  121   Friday, June 08, 2012, 11:07 David WangConditioning StationStandard OperationTM1Ta38conditioning staion and TM1 is under TP1 and TP2 pumping now.I connected vacuum system to TM1 and conditioning
station and started two turbo pumps yesterday.
The pumping an d vacuum readings  are
  
  120   Thursday, June 07, 2012, 11:58 Bevan MossConditioning StationStandard OperationTM1Ta38Module Move from SHC to TCSTM1 was moved from SHC to the TCS. The
mode took roughly 1 hour. During the move
the north east corner of the containment
  
  119   Wednesday, June 06, 2012, 14:33 David WangSouth Hot-CellStandard OperationTM1Ta38leak check heat shield circuitChad and I did a leak check on heat shield
circuit after target is installed on TM1.The
leak detector pumping down is smooth. The
  
  118   Wednesday, June 06, 2012, 13:36 chad fisherSouth Hot-CellStandard OperationTM1Ta#38Target Change Nb#6 - Ta#38Nb#6 was removed from TM1...it looked very
clean.
Ta#38 was installed onto TM1...fit
  
  117   Wednesday, June 06, 2012, 08:21 David WangITWStandard OperationTM1 TM1 disconnected in ITWI disconnected TM1 in ITW yesterday morning.The
general radioactive level in ITW over the
TM top (300mm) is about 350 usv/hr. contacting
  
  116   Tuesday, June 05, 2012, 15:06 Bevan MossITWStandard OperationTM1Nb#6Module move from ITW to SHC TM1 has been moved from ITW to the
SHC. The move did encounter some issues,
one of the railings for preventing people
  