1683
|
Monday, January 29, 2018, 06:51 |
David Wang | Conditioning Station | Maintenance | TM1 | | TCS and TM1 vacuum pumps switched off | TCS and Tm1 vacuum pumps are switched off
this morning. TM1 TP1and TP2 work fine during
this test period. Tm1 will be moved back |
|
1713
|
Tuesday, May 15, 2018, 07:44 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | Module move | TM#4 was moved to the conditioning
station from the south hot cell. The module
was moved with out the containment box. |
|
1714
|
Tuesday, May 15, 2018, 10:21 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Tm4 water circles helium pressur test result |
Helium pressure test on TM4 water lines
is done this morning. 70 psi helim , 1 minutes |
|
1715
|
Thursday, May 17, 2018, 11:30 |
Anders Mjos | Conditioning Station | Maintenance | TM4 | | HV test/conditioning of damaged source tray | BIAS only. Water lines looped on top. Containment
box off.
Thursday, May 17, 2018, 11:20: Vacuum |
|
1717
|
Friday, May 18, 2018, 09:34 |
David Wang | Conditioning Station | Repair | TM4 | | water leak on TM4 Tube heater - B line confirmed. | At 8:50 AM today, I applied water to TM4
tube heater - (B) line at TCS. All high vacuum
gauges got response on this action. Water |
|
1718
|
Tuesday, May 22, 2018, 10:02 |
Anders Mjos | Conditioning Station | Repair | | | Water leak from TK1 over the weekend | Link
to e-log,
Link |
  |
1726
|
Wednesday, May 30, 2018, 09:51 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 water lines helium pressure test at TCS. | I did a helium pressure test on TM2 water
lines at TCS. We will remove the TM2 source
tray soon so this test is a reference check |
|
1727
|
Wednesday, May 30, 2018, 09:55 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are switched off. | I switched off TM2 and TCS vacuum pumps.
The TCS and TM2 will be under vacuum without
pumping. |
|
1741
|
Monday, June 25, 2018, 16:42 |
Anders Mjos | Conditioning Station | Development | | | Testing new high current connectors | Shorted TGHT with new high current connector
assembly and heated to 600 A. Temperature
measured on half way point on cable ~ 70 |
|
1762
|
Wednesday, August 01, 2018, 14:48 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#23 | Spent Target Move | TM#2 with UC#23 has been moved from
the south hot cell to the conditioning station. |
|
1764
|
Thursday, August 02, 2018, 07:57 |
David Wang | Conditioning Station | Standard Operation | | | Leak check on TM2 UCx #23 @ TCS and SHC. | I did a helium pressure test on TM2 HS
line at TCS. At 70psi helium, the leak rate
is 2.5 xE-7 atm.cc/sec. I think this is the |
|
1771
|
Thursday, August 30, 2018, 07:42 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been connected to TCS. | TM4 has been connected to TCS. vacuum system
and water system are started. Everything
looks fine. |
|
1772
|
Thursday, August 30, 2018, 07:46 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 HS line leak check at TCS and SHC. | Chad and I leak checked TM4 HS line after
UCx 24 is installed. No leak at 5xE-9atm.cc/sec.
Today, I did helium pressure test on HS line |
|
1775
|
Tuesday, September 04, 2018, 08:18 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 24# | Stppped TM4 and TCS vacuum and water system at TCS. | I stopped TM4 and TCS vacuum system at
TCS. TCS and TM4 is venting with argon now. |
|
1776
|
Tuesday, September 04, 2018, 09:57 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#24 | Module move | TM#4 with UC#24 has been moved from
the conditioning station to the east target
station. |
|
1783
|
Friday, September 14, 2018, 09:39 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 with no target has been moved
from the north east silo to the conditioning
station. |
|
1792
|
Tuesday, September 25, 2018, 07:54 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 is connected for HV test at TCS. | water loops are by passed on top. All bias,
EE, and EL are tied together. Started
water system. |
|
1795
|
Wednesday, September 26, 2018, 07:14 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 HV test at TCS. | I did a HV test on TM3 at TCS yesterday.
HV Ramp up speed: 1KV per 5 minutes when
below 30KV,1KV per 10 minutes from 30-36KV. |
|
1796
|
Thursday, September 27, 2018, 13:58 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the conditioning
station to the centre east silo. This will
be its new home after the silo switcher-roo. |
|
1801
|
Tuesday, October 09, 2018, 12:32 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 steers 4 pin feedthrough CF flange | TM4 Steers 4 pin feedthrough CF flange
is replaced due an inside feed through insulator
broken. CF 25 cooper seal is replaced with |
|