  ID Date Author Categorydown Type Module Target/Number Subject
  1647   Thursday, October 19, 2017, 10:11 David WangConditioning StationStandard OperationTM4 Leak check on TM4 HS line at SHC and TCS.

Chad and I leak checked TM4 HS line after new target is installed yesterday. No leak has been found. Also, I helium pressurized the HS line at TCS this morning. TM4 HS line is good on this test. The TM4 gas line configuration on TM4 top is leak check as well. No problem.

  1649   Thursday, October 19, 2017, 14:20 Anders MjosConditioning StationStandard OperationTM4SiC#37SiC#37 Conditioning

Thursday, October 19, 2017, 14:20: EE configured for conditioning. HV cage locked up

Thursday, October 19, 2017, 16:46: BIAS / EL / EE at 45 / 22.5 / 0 kV

Thursday, October 19, 2017, 17:16: 30 min without sparking. Lowering to 0. Continue conditioning tomorrow.


Friday, October 20, 2017, 08:22: Resuming HV conditioning

Friday, October 20, 2017, 08:44:  BIAS / EL / EE at 45 / 22.5 / 0 kV

Friday, October 20, 2017, 09:48: No sparking. Continue conditionoing

Friday, October 20, 2017, 10:40: BIAS / EL / EE at 50 / 22.5 / 0 kV

Friday, October 20, 2017, 11:30: HV spark (at 52.5 kV) tripped TP2 and TP1s resulting in IG1S and power supplies tripping.

Friday, October 20, 2017, 13:50: Gelo is troubleshooting flickering on/off of ANODE, TGHT and TBHT power supplies.

Friday, October 20, 2017, 13:51: BIAS / EL / EE at 50 / 25 / 0 kV

Friday, October 20, 2017, 14:26: BIAS / EL / EE at 55 / 28 / 0 kV

Friday, October 20, 2017, 14:37: TP2 tripped on spark

Friday, October 20, 2017, 14:51: Gelo has determined there is a communication problem with the PLC on the HV platform. Troubleshooting continues.

Friday, October 20, 2017, 19:02: Troubleshooting did not succeed. Not able to control power supplies. Troubleshooting continue on Monday.


Monday, October 23, 2017, 09:00: After starting the TCS again today communication has been reestablished. Started heater conditioning.

Monday, October 23, 2017, 14:03: Heater ramping previously aborted and ramp down started due to ongoing PLC communication issues. TGHT and TBHT power supplies tripped on timeout around 13:45. Gelo will continue the troubleshooting.

Monday, October 23, 2017, 19:55: Switching off source after operating for 5 hours without any communication glitches detected (fiber optic communication cables swapped between HV platform and BIAS/EZL PLCs)

Attachment 1: SiC#37_BIAS_current_vs_voltage.xlsx
Attachment 2: SiC#37.docx
  1655   Thursday, November 09, 2017, 08:46 Anders MjosConditioning StationRepair  Communication fiber replaced for HV PLC

 After extensive troubleshooting the communication fiber was found to be damaged and has been replaced by Gelo.

  1656   Thursday, November 09, 2017, 09:34 David WangConditioning StationStandard OperationTM2Ta#55Leak check on TM2 HS line at SHC and TCS.

The TM2 HS line was leak checked at SHC yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed by Chad, NO leak.  It was helium pressurized at TCS this morning. Leak rat:2.5 XE-7 atm.c/sec. The result  is same as last time check. No concern.

  1657   Thursday, November 09, 2017, 09:35 David WangConditioning StationStandard OperationTM2Ta#55TM2 has been connected at TCS

TCS vacuum system and water system have been started as well. Everything looks fine.

  1658   Thursday, November 09, 2017, 10:39 Anders MjosConditioning StationStandard OperationTM2Ta#55Conditioning Ta#55

Thursday, November 09, 2017, 10:40: BIAS / EL to 30 / 15 kV. 400 uA on BIAS

Bias was stable for 1 hour. Handed over to RIB ops for heater conditioning.

  1663   Wednesday, November 15, 2017, 08:55 David WangConditioning StationStandard Operation  Install shield plug onto TCS and pumping down TCS.

Shielding plug is installed onto TCS. TCS is being pumped down to keep it under vacuum for the rest of the year.

  1665   Wednesday, December 06, 2017, 09:33 Anders MjosConditioning StationMaintenance  Running chiller for maintenance tech

 Dakine is on site to do maintenance on the chiller. The tech requested the chiller to operate.

  1669   Thursday, December 21, 2017, 15:11 Anders MjosConditioning StationMaintenance  Powered down devices

Powered down mechanical pumps in ISAC-I Experimental hall, vacuum gauge and turbo pump controllers in ISAC-I B2 North Hot Cell service area

  1673   Tuesday, January 02, 2018, 14:47 Anders MjosConditioning StationStandard Operation  Pumping on secondary vacuum

Tuesday, January 02, 2018, 14:45: TP1S started

  1674   Tuesday, January 02, 2018, 15:17 Anders MjosConditioning StationMaintenance  Tested chiller

Tested all 3 compressors and MP2

  1675   Thursday, January 04, 2018, 13:28 Anders MjosConditioning StationMaintenance  Troubleshooting IG1S

TCS:IG1S is reporting vacuum levels that seem to be too low (1E-10 to 1E-8 Torr). The gauge was connected to the controller for IG1, which showed the same value. A degas was performed for ~5 min.

  1678   Wednesday, January 17, 2018, 06:51 David WangConditioning StationStandard Operation  Stop TCS vacuum pumps

I stopped TCS vacuum pumps for coming TM3 move.

  1680   Wednesday, January 17, 2018, 13:54 David WangConditioning StationStandard OperationTM3 Start TM3 turbo pumps at TCS.

TM3 turbo-pumps are started at TCS. We will keep pumps running until next Wednesday.

  1681   Monday, January 22, 2018, 07:47 David WangConditioning StationStandard OperationTM3 Restarted TM3 vacuum sysytem after site power bump

All TCS and TM3  vacuum pumps are started successfully.

  1682   Wednesday, January 24, 2018, 13:30 David WangConditioning StationStandard OperationTM1  TM1 has been moved to TCS this morning

Tm1 has been moved to TCS this morning. All turbo-pumps are started successfully at TCS and TM1.

  1683   Monday, January 29, 2018, 06:51 David WangConditioning StationMaintenanceTM1 TCS and TM1 vacuum pumps switched off

TCS and Tm1 vacuum pumps are switched off this morning. TM1 TP1and TP2 work fine during this test period. Tm1 will be moved back to silo this morning.

TM1 IG1 stopped work during the test period. It could be broken. We will only replace this gauge if TM1 is used in ITW again.

  1713   Tuesday, May 15, 2018, 07:44 Travis CaveConditioning StationStandard OperationTM4no targetModule move

 TM#4 was moved to the conditioning station from the south hot cell. The module was moved with out the containment box.

  1714   Tuesday, May 15, 2018, 10:21 David WangConditioning StationStandard OperationTM4 Tm4 water circles helium pressur test result

  Helium pressure test on TM4  water lines is done this morning. 70 psi helim , 1 minutes time to each circle. The result:

A(oven+): 0.00xE-9 atm.cc/sec

B(Oven -): 8.1Xe-7 atm.cc/sec

C(tube -): 0.00xE-9 atm.cc/sec

D(tube+): 1.0xE-5 atm.cc/sec

PQ(coil 2): capped on top. water lines were removed because of leak

RU(Coil1): 0.00xE-9 atm.cc/sec

EE: 0.00xE-9 atm.cc/sec

MSP: 0.00xE-9 atm.cc/sec

HS: No target, capped on top. It was fine on last target check in 2017 Oct.

window: Capped on top. Containment box is not installed.

The leak check on D line caused the IG1 small response during test.

B and D circle are double checked. The reasults are same.

D line leak is in E-5 atm.cc/sec range. It is possible to locate it by using helium spray method in SHC. The containment box is not on so it should be easy to do it.

Switch on IGA gauge at TCS and apply helium and water at certain psi to check the IGA response may give us more information on these leaks.

 All lines were test in last year shut down. They were good.

 

  1715   Thursday, May 17, 2018, 11:30 Anders MjosConditioning StationMaintenanceTM4 HV test/conditioning of damaged source tray

BIAS only. Water lines looped on top. Containment box off.

Thursday, May 17, 2018, 11:20: Vacuum 7.2E-7 Torr

Thursday, May 17, 2018, 11:30: 10 kV

Thursday, May 17, 2018, 11:42: 20 kV

Thursday, May 17, 2018, 12:14: 25 kV

Thursday, May 17, 2018, 12:35: 30 kV

Thursday, May 17, 2018, 16:13: 35 kV

Thursday, May 17, 2018, 17:339: 37.5 kV

Thursday, May 17, 2018, 17:40: vacuum 6.8E-7 Torr

Thursday, May 17, 2018, 18:13: BIAS off.

Attachment 1: TM4_2018-05-18_Water_Leak.docx