  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1588   Monday, July 31, 2017, 09:44 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved back to the NE
silo from the conditioning station.
  
  1594   Thursday, August 03, 2017, 17:08 Anders MjosConditioning StationRepairTM2 Power bump Thursday, August 03, 2017, 17:08:
Restarting vacuum and water system
  
  1601   Friday, August 25, 2017, 16:33 Anders MjosConditioning StationRepair  Testing HV after cooling line repair The BIAS voltage was brought up to
70 kV today and held there for 1h. No sparking
observed.
 2017-08-25_HV_Water_Line_Test.xlsx 
  1604   Monday, August 28, 2017, 14:34 Travis CaveConditioning StationStandard OperationTM4UC#21Module move TM#4 with UC#21 has been moved from
the south hot cell to the conditioning station.
  
  1606   Tuesday, August 29, 2017, 08:59 David WangConditioning StationStandard OperationTM4 TM4 HS line leak checksTM4 HS line leak checks are done, at SHC
and TCS. SHC: Helium spray. TCS: Helium 
pressurize 70psi.  LD base LR 0.0 X
  
  1607   Tuesday, August 29, 2017, 09:01 David WangConditioning StationStandard OperationTM4 TM4 has been connnected at TCS.TM4 has been connected at TCS. TCS water
system has been started for TM4. TM4 and
TCS vacuum pumping down is good so far.
  
  1609   Tuesday, September 05, 2017, 06:33 David WangConditioning StationStandard OperationTM4 Turned off TCS water system and vacuum system.Argon vent and disconnect TM4 at TCS.   
  1611   Friday, September 08, 2017, 11:20 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the north
east silo to the conditioning station.
  
  1612   Friday, September 08, 2017, 14:08 David WangConditioning StationRepairTM3 TCS and TM3 TM3 is located at TCS and it is pumping
down now. TCS water system has been started. 
All TCS water lines for TM3 module internal
  
  1613   Wednesday, September 13, 2017, 10:05 David WangConditioning StationRepairTM3 Switch off TCS water system and vacuumsPreparing vent the TCS/TM3. We will remove
TM3 service tray cover plate  after
venting.
  
  1614   Wednesday, September 13, 2017, 16:05 David WangConditioning StationRepairTM3 remove Tm3 service tray cover plateTM3 service tray cover plate has been removed.
It is bagged and placed to TH b2 level south
wall beside the silo.
  
  1615   Wednesday, September 13, 2017, 16:13 David WangConditioning StationRepairTM3 TCS turbo pumps are started. TCS and TM3 all vacuum pumps are started.
Everything is fine.
  
  1616   Friday, September 15, 2017, 14:12 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved back to the silo
from the conditioning station.
  
  1628   Wednesday, September 27, 2017, 09:02 Travis CaveConditioning StationStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the south hot cell to the conditioning station.
  
  1629   Thursday, September 28, 2017, 10:50 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 window and HS water lines at TCS.  I did helium pressure test on TM2
containment box window and HS  line at TCS.
@ 70psi helium  for 3 minutes, HS:2.2XE-7
  
  1631   Thursday, September 28, 2017, 15:34 Anders MjosConditioning StationDevelopmentTM2 Changes to MP3 startup Due to problems with the regulating
valve WPV1, the VFD (Variable Frequency Drive)
for the pump has been programmed to do a
  
  1632   Thursday, September 28, 2017, 17:44 Anders MjosConditioning StationStandard OperationTM2Ta#54Conditioning Ta#54Thursday, September 28, 2017
Cooling water not yet connected to
TM.
 Ta#54.docxTa#54_BIAS_current_vs_voltage.xlsx 
  1637   Friday, October 06, 2017, 13:25 Anders MjosConditioning StationRepair  HV Test HV was brought up to 70 kV for 1
h without sparks to test the new water installation.
 2017-10-06_HV_Water_Line_Test.xlsx 
  1639   Tuesday, October 10, 2017, 10:45 David WangConditioning StationRepair  Re-route TCS water lines.TCS  cooling polyurethane lines have
been re-routed to solve to HV sparking issue
on old configuration between lines and bais
 8x 
  1645   Wednesday, October 18, 2017, 10:46 Travis CaveConditioning StationStandard OperationTM4SiC#37Module move TM#4 with SiC#37 has been moved from
the south hot cell to the conditioning station.
  