  2368   Wednesday, September 28, 2022, 12:58 Matthew GareauNorth Hot-CellRepair  Chad repaired the right operator side manipulatorOn 26/Sept/2022
Chad disassembled the right operator
side manipulator, and noticed that gears
 IMG_20220926_091024~2.jpgIMG_20220926_091040.jpgIMG_20220926_091047.jpgIMG_20220926_091153.jpg 
  2369   Wednesday, September 28, 2022, 13:15 Matthew GareauNorth Hot-CellMaintenance  topped up the NHC window oil through the oil expansion tankMyself and Maico were able to top up the
NHC window oil.
The oil was filled through the expansion
 IMG_20220928_121000.jpgIMG_20220928_124253.jpgIMG_20220928_124258.jpg 
  2371   Monday, October 03, 2022, 14:28 Keith C NgAssembly/Bench TestMaintenance  ITA2826 rev E assemblyA fully built steerer sub assembly ITA2826
revision E was boxed and sealed and put on
rack storage in ISAC B2 South Hot Cell area.
  
  2375   Friday, October 07, 2022, 14:46 Adam NewsomeSouth Hot-CellDevelopment  Addition of lift table to E-stop circuitA modification was made to integrate the
hot cell's lift table into the E-stop circuit.
See work permit I2022-10-07-1
 ISAC_SHC_Lift_Schematic_updated_20221007.jpgPXL_20221007_185635660.MP.jpgPXL_20221007_185649720.jpg 
  2378   Monday, October 17, 2022, 08:07 David WangITE/ITWRepairTM4 A small leak on target station secondaryvacuum back up line by ITH MP1S.
    

       
            A  small leak in target station
  
  2380   Wednesday, October 19, 2022, 12:04 Carla BabcockConditioning StationRepair  TCS:TBHT taken as replacement for ITE:TBHTDuring the last ITE run with the SiC#44
target, the ITE:TBHT controls card was fried
twice. The first time we put in our spare,
  
  2389   Tuesday, November 22, 2022, 10:37 Adam NewsomeNorth Hot-CellStandard OperationTM4 TM4 Move - ITE to NHCTM4 was moved from ITE to NHC with C#4.
  
  2391   Tuesday, November 22, 2022, 14:53 Carla BabcockNorth Hot-CellMaintenanceTM4 Multipin connector alignment pin on TM4 module looseThe pin on TM4 has become loose again,
making it very difficult to remove the multipin
connector with the last target, C#4. For
  
  2398   Friday, December 16, 2022, 16:35 Adam NewsomeSpent Target VaultStandard Operation  Pails measured, moved to mini-storage vaultThe following five pails were moved to
the mini-storage vault today under work permit
I2022-12-16-1:
 Target_Index_2022-12-16.pdf 
  2399   Friday, December 16, 2022, 16:39 Adam NewsomeCraneStandard Operation  Crane powered off for holidays[edit 2023-01-03] The crane was powered
back on this morning - there do  not appear
to be any faults and it seems that the crane
  
  2400   Friday, January 06, 2023, 09:41 Adam NewsomeSpent Target VaultStandard Operation  Pails moved to mini-storage vaultThe following three pails were moved from
the main storage vault to the mini-storage
vault:
 Target_Index_2023-01-06.pdf 
  2401   Friday, January 06, 2023, 10:38 David WangITWStandard OperationTM2 ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test. ITW
 and TM2 primary and secondary vacuum
 ITW_vacuum_leak_check_2023.pdf 
  2406   Tuesday, January 24, 2023, 07:21 David WangITWMaintenance  ITW pit general clean up.  ITW  was cleaned with vacuum
canister in Jan 10th. HV  cage inside
and blue  nylon insulators were wiped. 
  
  2407   Tuesday, January 24, 2023, 07:26 David WangConditioning StationStandard Operation  TH floor moping and garbage collelctions.Plant group and us  finished TH floor
mopping and garbage collections last Wednesday.
Th moping head had 800 count after using.
  
  2411   Friday, January 27, 2023, 07:11 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.Tom Kauss inspected target hall crane yesterday.
The crane works fine. Tom has this inspection
record in his file. The inspection tag has
  
  2412   Friday, January 27, 2023, 07:15 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.Tom Kauss  finished TH crane annual
inspection yesterday. The crane woks fine.
Tom has this inspection record in his file.
  
  2413   Friday, January 27, 2023, 07:18 David WangCraneStandard Operation  Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01  and ITA0494-1997-02
yesterday. He certified the use of these
  
  2414   Friday, January 27, 2023, 07:25 David WangCraneStandard Operation  Inspection of TH crane below hook attachment pins and plates ITA6550-01Tom Kauss inspected target hall crane below
hook attachment pins and  plates ITA6550-01
yesterday. He certified the use of these
  
  2416   Monday, February 13, 2023, 09:57 David WangITWMaintenance  ITW/ITE primary vacuum back up lines and BVs leak check in target pit. In past two weeks, ITW/ ITE primary vacuum
back up lines and BVs in ITW/ITE pit have
been leak checked.  ITW BV1 and BV2
  
  2417   Tuesday, February 14, 2023, 11:36 David WangAssembly/Bench TestRepair  Turbo pump BVs o-ring replacement. Five of used  internal leaked 
TP BVs are serviced and repaired. Internal
plunge  o-ring and case o-ring are replaced
  