1783
|
Friday, September 14, 2018, 09:39 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 with no target has been moved
from the north east silo to the conditioning
station. |
|
1792
|
Tuesday, September 25, 2018, 07:54 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 is connected for HV test at TCS. | water loops are by passed on top. All bias,
EE, and EL are tied together. Started
water system. |
|
1795
|
Wednesday, September 26, 2018, 07:14 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 HV test at TCS. | I did a HV test on TM3 at TCS yesterday.
HV Ramp up speed: 1KV per 5 minutes when
below 30KV,1KV per 10 minutes from 30-36KV. |
|
1796
|
Thursday, September 27, 2018, 13:58 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the conditioning
station to the centre east silo. This will
be its new home after the silo switcher-roo. |
|
1801
|
Tuesday, October 09, 2018, 12:32 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 steers 4 pin feedthrough CF flange | TM4 Steers 4 pin feedthrough CF flange
is replaced due an inside feed through insulator
broken. CF 25 cooper seal is replaced with |
|
1804
|
Wednesday, October 10, 2018, 10:50 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#57 | Electrical Check | The various electrical check done
on TM#4 after the UC run and before the start
of the Ta run. |
|
1810
|
Friday, October 26, 2018, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | | | Exit Module moved | The west exit #2 module has been moved from
the south hot cell to the conditioning station. |
|
1811
|
Monday, October 29, 2018, 10:43 |
David Wang | Conditioning Station | Repair | | | ITW exit 2 leak check at TCS. | I did a leak check this morning on exit
2 module at TCS. LD base leak rate
is 4.00XE-9atm.cc/sec, Base pressure is 0.00 |
|
1813
|
Wednesday, October 31, 2018, 14:20 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#25 | Module move | TM#2 with UC#25 has been moved from the south
hot cell to the conditioning station. |
|
1815
|
Thursday, November 01, 2018, 11:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx 25. | TM2 HS line helium pressure test at TCS and helium spray at SHC.. | Chad and I did leak check on TM2
HS line at SHC yesterday. Base LR 0.0XE-9
atm.cc/sec. No response on LD. |
|
1817
|
Monday, November 05, 2018, 14:27 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | UC#25 | Target module disconnected | Frank and Anders disconnected the water
and electrical connections this afternoon
after the target was conditioned over the |
|
1829
|
Wednesday, November 28, 2018, 06:39 |
David Wang | Conditioning Station | Standard Operation | | | Disconnection checklist LpTa #56 | TM4 was disconnected in ITE. Checklist
list in attachment. |
|
1832
|
Wednesday, November 28, 2018, 13:38 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#26 | Module move | TM#4 with UC#26 has been moved from
the south hot cell to the conditioning station. |
|
1842
|
Wednesday, December 19, 2018, 14:41 |
Anders Mjos | Conditioning Station | Standard Operation | | No target | Installed Shield Block on TCS | Frank and Anders installed lid on TCS and
started vacuum system yesterday. To run over
the Holidays. Retrieved dose badge from operational |
|
1843
|
Wednesday, January 02, 2019, 10:26 |
Anders Mjos | Conditioning Station | Standard Operation | | | Restarrted TP1S | Found pumps off after the holidays. Restarted
roughing pump and TP1S |
|
1849
|
Wednesday, January 09, 2019, 06:26 |
David Wang | Conditioning Station | Standard Operation | | | TCS vacuum pumps have been stopped. | The tCS will be vented soon for TM2 move
later this week. |
|
1853
|
Thursday, January 10, 2019, 09:26 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the south
hot cell to the conditioning station. |
|
1854
|
Thursday, January 10, 2019, 10:45 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 is under vacum at TCS. | TCS: TP1, TP2 and TP1S are started. |
|
1856
|
Friday, January 11, 2019, 13:17 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS and TM2 vacuum system are switched off for this Sunday power outage. | I will restart all pumps Monday morning.
|
|
1858
|
Monday, January 14, 2019, 07:07 |
David Wang | Conditioning Station | Maintenance | TM2 | | Restarted TCS vacuum system . | No issue. |
|