  2399   Friday, December 16, 2022, 16:39 Adam NewsomeCraneStandard Operation  Crane powered off for holidays

[edit 2023-01-03] The crane was powered back on this morning - there do not appear to be any faults and it seems that the crane was unaffected by the power outage.

The ISAC target hall overhead crane was powered off for the holidays. Note that this may result in the commonly observed PLC battery failure issue when the crane is powered back on in the new year.

  2400   Friday, January 06, 2023, 09:41 Adam NewsomeSpent Target VaultStandard Operation  Pails moved to mini-storage vault

The following three pails were moved from the main storage vault to the mini-storage vault:

1. #211, Ta#58 (formerly vault location 3C)
2. #217, ZrC#8 (formerly vault location 3A)
3. #228, UC#37 (formerly vault location 1B)

 

The target index spreadsheet has been updated.

Attachment 1: Target_Index_2023-01-06.pdf
Target_Index_2023-01-06.pdf Target_Index_2023-01-06.pdf
  2401   Friday, January 06, 2023, 10:38 David WangITWStandard OperationTM2 ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test.

ITW and TM2 primary and secondary vacuum vessel leak check is done. Leak detector is connected to ITW TP1. Base leak rate on leak detector is 0.0 x E-9 atm.cc/sec.   See attachment for the result.  No big issue. Two old leaks we found last year at location D and E disappeared in this check. We did Vacseal resin spray on them last year.  It looks like the Vacseal spray works .  From the result , I can see the o-ring between exit 1 module and T - flange is closing to the end of the life.  There are two small leaks on this o-ring now at A and B location. We plan to change this o-ring next winter shut down. We do vacseal spray on them this year. The big O-ring between tank vessel and T -flange looks still ok. Two small leaks are found on location F and G on this O-ring. Not much we can do on them. The leak on location C and B were sprayed with resin yesterday after leak check. They are leak free after spray on check. I will double check them. Leak on location A will be resin sprayed after TM2 is removed and ITW is under vacuum.   All TM2 internal water-cooling lines are helium pressurized (70 psi) for 5 minutes each. HS shows 2.5 X E-9atm.cc/sec leak rate. The rest lines are 0.0 X E-9 atm.cc/sec.

Attachment 1: ITW_vacuum_leak_check_2023.pdf
ITW_vacuum_leak_check_2023.pdf
  2406   Tuesday, January 24, 2023, 07:21 David WangITWMaintenance  ITW pit general clean up.

 ITW  was cleaned with vacuum canister in Jan 10th. HV  cage inside and blue nylon insulators were wiped.  Garbage inside the pits were cleaned out.

  2407   Tuesday, January 24, 2023, 07:26 David WangConditioning StationStandard Operation  TH floor moping and garbage collelctions.

Plant group and us  finished TH floor mopping and garbage collections last Wednesday. Th moping head had 800 count after using. all garbage were bagged , checked, tagged, and sent to radwaste area.

  2411   Friday, January 27, 2023, 07:11 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.

Tom Kauss inspected target hall crane yesterday. The crane works fine. Tom has this inspection record in his file. The inspection tag has been issued.

  2412   Friday, January 27, 2023, 07:15 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.

Tom Kauss  finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection tag has been issued for 2023.

  2413   Friday, January 27, 2023, 07:18 David WangCraneStandard Operation  Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02

Tom Gauss inspected  two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 yesterday. He certified the use of these two frames for 2023. Inspection tags have been issued and attached to frames. He has inspection record on them. 

  2414   Friday, January 27, 2023, 07:25 David WangCraneStandard Operation  Inspection of TH crane below hook attachment pins and plates ITA6550-01

Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01 yesterday. He certified the use of these pins and plates. The inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08.  After inspection, The inspection tag  was issued and attached to pin. Tom has an inspection record on this job

  2416   Monday, February 13, 2023, 09:57 David WangITWMaintenance  ITW/ITE primary vacuum back up lines and BVs leak check in target pit.

In past two weeks, ITW/ ITE primary vacuum back up lines and BVs in ITW/ITE pit have been leak checked.  ITW BV1 and BV2 on back up line side were leak. They are replaced with old leak free BVs.  ITE TP2 NW25 SST  flexible line right after pump were leak . It is replaced with new NW25 SST flexible line. Two leak were found on ITW side KF 50 O-rings connected to NW 50 SST flexible coupling. They were replaced with new KF50 o-rings. After job, both  stations primary back up lines in pit were leak checked .  They are good.

  2417   Tuesday, February 14, 2023, 11:36 David WangAssembly/Bench TestRepair  Turbo pump BVs o-ring replacement.

Five of used  internal leaked  TP BVs are serviced and repaired. Internal plunge  o-ring and case o-ring are replaced on all five BVs. Leak checked valves after  . They are ok to be used as spare parts.  The are active parts stored in TH now.

  2418   Wednesday, February 22, 2023, 09:22 Carla BabcockITE/ITWStandard Operation  HV testing of ITE/ITW

Feb. 16 2023: HV tests done on ITE station. Ramped up to 59kV but was not stable there, current draw was very unstable and was sparking every ~6mins. Ramped down to 58kV and it was stable there for 3 hours drawing 285uA.

Feb. 24 2023: HV tests done on ITW station. Ramped easily to 60kV with no sparking - suspicious. Has been stable at 60kV for 45mins with no sparks and current draw of 200uA. Cannot find any reason that things aren't connected properly...

Attachment 1: Screenshot_from_2023-02-16_13-19-44.png
Screenshot_from_2023-02-16_13-19-44.png
Attachment 2: Screenshot_from_2023-02-22_09-20-14.png
Screenshot_from_2023-02-22_09-20-14.png
Attachment 3: Screenshot_from_2023-02-24_17-41-33.png
Screenshot_from_2023-02-24_17-41-33.png
  2419   Wednesday, March 01, 2023, 09:27 David WangCoolingMaintenance  Two filters on HALCW resin circuit have been replaced.

Two filters on HALCW resin circuit have been replaced. O-ring 235# were changed on both filter cartridge houses.  25micron  10"x 2.5" 3M cartridge new filters  are used. Old filters are not very dirty. They are bagged and stored in vacuum pit. Residual water from cartridge houses are collected and stored in high active storage jug with sealed cap.  No leak on resin circuit before and after the job.

  2420   Wednesday, March 01, 2023, 09:34 David WangCoolingMaintenance  Visual inspection of HALCW for possible small water leak or drip.

I visually inspected HALCW system including water station section, both target pits, and de-ionizer system.  No small leak and drip was found .  The inspection in both target pits will be repeated after flow sensors are replaced.

  2421   Wednesday, March 01, 2023, 10:01 David WangITE/ITWDevelopment  vacuum pit ventilation upgrade.

vacuum pit ventilation upgrade was done last week. The jobs include: installed two industrial cooling  fans.  One is placed in pit on resin tan cover. Other one is placed on and opening to pit by shielding blocks.  They are installed for better air circulation in pit. Also,  2x two small 20W cooling fans are installed on ITH MP1 and MP1S to low the pump  operation temperature.  The result is positive. The ventilation status in pit meets the pump operation requirement (good ventilation and 40 Celsuis below) .  ITH CG2S 0.0 mtorr.  ITH CG2 0.26mtorr.

  2422   Monday, March 06, 2023, 11:31 Adam NewsomeNorth Hot-CellRepair  Spare Telemanipulator: Y-Motion Linear Actuator Repair

The linear actuator used for the Y-motion motor assistance on the spare telemanipulator was replaced and tested. It was observed around September 2021 that the former one which was installed was causing fuses to blow for the main 120 VAC power supply in the control box. After some troubleshooting, it was determined that the linear actuator itself did not operate smoothly - it was suspected that this caused motor overload due to additional friction. This suspicion was confirmed by operating the linear actuator independently with a power supply and measuring current draw. The part has been replaced by Thomson PPA90-58B65-08NXXX. Note: this part took over 1 year to arrive since it was first ordered. The spare telemanipulator is confirmed operational.

 

Update 2024-09-11: noting that this was for serial number 9351

  2423   Tuesday, March 07, 2023, 10:37 chad fisherNorth Hot-CellRepair  Spare Telemanipulator: Y-Motion Linear Actuator Repair

Adam Newsome wrote:

The linear actuator used for the Y-motion motor assistance on the spare telemanipulator was replaced and tested. It was observed around September 2021 that the former one which was installed was causing fuses to blow for the main 120 VAC power supply in the control box. After some troubleshooting, it was determined that the linear actuator itself did not operate smoothly - it was suspected that this caused motor overload due to additional friction. This suspicion was confirmed by operating the linear actuator independently with a power supply and measuring current draw. The part has been replaced by Thomson PPA90-58B65-08NXXX. Note: this part took over 1 year to arrive since it was first ordered. The spare telemanipulator is confirmed operational.

 During this repair it was noted that the Y-axis electrical translation is locked out when the Z-axis is in the fully retracted position (i.e. the Z-axis limit switch engaged). I have made a note of this in the operator manual (CRLD-1046-B Rev1 ) which can be found in docushare collection 26780

  2424   Wednesday, March 08, 2023, 06:32 David WangCoolingMaintenance  HALCW flow sensors replacement.

HALCW flow sensors replacement job is done. All ITE/ITW(except ITE HS) return line water flow sensors including paddle wheels and coils are replaced.  After job, water interlock signal have been checked in electrical room .  Everything works fine. Visually inspections for possible water leak on HCLCW system have been done as well. one valve on ITE dump return line has a very small water seeping through valve stem. I will watch on it.  Other than that,  No major concern.

2023-03-08: leak on 1/2" ITE dump return line valve is fixed.

  2425   Wednesday, March 08, 2023, 09:19 David WangCoolingStandard Operation  HALCW ITC:MP1/MP2 motor phase current measurement.

HALCW ITC:MP1/MP2 motor phase current measurement is done by Joel from electrician group. MP1:17.1A/17.2A/16.7A.  MP2: 17.9A/17.9A/17.3A.   19.5A is manufacturer notified on full load phase current.on operating  instruction manual. 

  2426   Wednesday, March 08, 2023, 13:57 David WangCoolingStandard Operation  HALCW ITC:MP1/MP2 pump and motor temerature measurements

HALCW ITC:MP1/MP2 pump and motor temperature measurements result:

MP1: pump discharging  port: 78F,  motor rear bearing house:72F  , Motor housing 140F(60C). 6F difference between them is less than 15F manufacturer clarified up limit in instruction manual. 

MP2: pump discharging port:78F,  motor  rear bearing house:72F, Motor housing 122F(50C).

MP1 is better than MP2 on motor status. It could be seen on phase current measurements as well.

Other notes on pump performance:    total flow rate 60GPM , discharging gauge pressure  99 to 100 psi on both pumps with one station all of TM water circuits bypassed + other station  two of TM water circuits bypassed + both stations 2A beam related water circuits  on(2X5).