ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
795
|
Wednesday, November 19, 2014, 11:12 |
David Wang | Conditioning Station | Standard Operation | TM4 | | CS roughing pump is started. | CS roughing pump is started for TM4 and
UCX 11 target. |
|
796
|
Thursday, November 20, 2014, 11:49 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | module move | TM#4 with UCx#11has been moved from the
conditioning station to the east target station. |
|
797
|
Thursday, November 20, 2014, 14:12 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | TM4 is connected in ITE. | TM4 has been connected connect in ITE.
Water is supplied to TM4 module only. |
|
798
|
Thursday, November 20, 2014, 14:13 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx11 | CS and TM4 was vented with Argon gas | CS and TM4 was vented with Argon gas this
morning before it was moved from CS to ITE. |
|
801
|
Tuesday, November 25, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
827
|
Tuesday, January 06, 2015, 11:14 |
David Wang | ITE | Standard Operation | TM4 | | 4 Shielding blocks have been moved out of ITE . | 4 shielding blocks have been moved out
of ITE to block storage area. Fiona
did the survey and with me during the move. |
|
830
|
Thursday, January 08, 2015, 08:04 |
David Wang | ITE | Standard Operation | TM4 | | TM4 water lines have been disconnected in ITE and purged. | TM4 waterlines have been disconnected and
purged in ITE. The TM4 vacuum system is still
in operation. |
|
843
|
Thursday, February 12, 2015, 09:11 |
David Wang | Crane | Repair | TM4 | | TH crane troubleshoot and annual inspection. | Gordon crane technicians continued their
troubleshooting on this Tuesday. They found
the crane up-limit protection switch which |
|
851
|
Monday, March 02, 2015, 10:52 |
David Wang | ITE | Maintenance | TM4 | UCx | ITE primary and secondary vacuum vessels leak check. | Dan and I leak checked ITE primary and
secondary vacuum vessels with TM4 in
ITE. The leak detector was hooked to ITE |
|
852
|
Thursday, March 05, 2015, 06:44 |
David Wang | ITE | Maintenance | TM4 | | 5 Shielding blocks have been moved to ITE. | 5 Shielding blocks have been moved to ITE
for next week TM1 move and RPG Radon test. |
|
859
|
Thursday, March 12, 2015, 13:04 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITE to ITW. | 5 shielding blocks have been transferred
from ITE to ITW for next week TM4 move. |
|
862
|
Monday, March 16, 2015, 09:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | Module move | TM#4 with UC#11 moved from the east target
station to the south hot cell. |
|
863
|
Monday, March 16, 2015, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move | TM#4 from south hot cell to the conditioning
station no target is attached to the module. |
|
868
|
Tuesday, March 24, 2015, 08:46 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move | TM#4 with no target has been moved
from conditioning station to the south hot
cell. |
|
869
|
Tuesday, March 24, 2015, 09:47 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Ta#45 installed | Ta#45 has been installed onto TM4 and is
ready for leak and electrical check. High
current fasteners torqued to 130 in.lbs. |
|
870
|
Tuesday, March 24, 2015, 13:57 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical check | TM#4 electrical checks with and without
the target installed, installed target is
Ta#45. |
|
872
|
Wednesday, March 25, 2015, 14:25 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Leak check on TM4 HS water line with new Ta#45 target. at SHC | Chad and I leak checked TM4 HS water line
with new Ta#45 target installed at SHC. Leak
detector base leak rate 0.0Xe-9 atm.cc/sec, |
|
873
|
Wednesday, March 25, 2015, 14:34 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 and CS turbo- pumps are started . | I connected TM4 and CS vacuum system after
TM4 move. CS roughing pump was started first
this morning. Later, Anders, Bill and I started |
|
874
|
Thursday, March 26, 2015, 09:20 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#45 | Electrical check | Electrical check of TM#4 with Ta#45 at
the conditioning station, see attached pdf
for details. |
|
875
|
Friday, March 27, 2015, 10:03 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | Helium pressure test on TM4 HS line at CS | The helium pressure test on TM4 HS line
at conditioning station is done. No leak.
I also leak checked all vacuum seals on TM4 |
|