2305
|
Tuesday, February 15, 2022, 11:18 |
Frank Song | Cooling | Repair | | | Replace 2 leak valves on high active water system | The valves #V10 & V11 beside
high active water pumps were replaced in
Target Hall, pics attached. |
  |
2306
|
Wednesday, February 16, 2022, 15:19 |
Frank Song | Cooling | Repair | | | high active cooling water valves repaired/replaced | A 3/8 inch drain valve on return
cooling line was replaced in ITE. In the
meantime two 1/2 inch valves labeled FEBIAD |
   |
2308
|
Thursday, February 24, 2022, 13:23 |
David Wang | ITE/ITW | Maintenance | | | Polyurethane water cooling lines replacement in ITE and ITW. | Polyurethane water cooling lines
in ITE and ITW HV shroud are replaced.
Both stations Ta, Tu, MSP, HS, Coil , EE |
|
2309
|
Friday, February 25, 2022, 10:22 |
Adam Newsome | South Hot-Cell | Development | | | Addition of E-Stops and Turntable Vertical Motion Limit Switch | Two changes have been made to the control
system to the South Hot Cell:
Addition of two emergency |
|
2310
|
Tuesday, March 01, 2022, 11:51 |
David Wang | Spent Target Vault | Maintenance | | | UCx #32 has been repacked in NHC. | UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to take out
his samples( in two small plastic containers) |
|
2311
|
Wednesday, March 02, 2022, 10:51 |
David Wang | ITE/ITW | Standard Operation | | | Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel. | Replaced 9 old turbo pumps from ITE/ ITW
and one 2A3M20 wire scanner from ITE
are transferred to cyclotron tunnel for storage. |
|
2312
|
Monday, April 04, 2022, 10:44 |
Nadia Jorgenson | South Hot-Cell | Repair | | | Turntable Chain Repair | Last week we repaired
the South Hot Cell turntable chain/sprocket. |
 |
2313
|
Monday, April 04, 2022, 21:04 |
Carla Babcock | Conditioning Station | Development | TM2 | | HV testing of IGLIS wires in TM2 | TM2 is in the TCS without containment box
for HV testing following the installation
of the IGLIS wiring. |
|
2314
|
Wednesday, April 13, 2022, 11:54 |
Carla Babcock | South Hot-Cell | Maintenance | TM2 | | EZL cable change | Chad changed the EZL cable and plugs on
TM2. New cable runs along the cable trays. |
|
2317
|
Thursday, April 28, 2022, 08:16 |
David Wang | ITW | Standard Operation | TM2 | | Annual ITW water signal interlocks check . | Annual ITW water signal interlocks check
was done with TM2 in ITW. Water
signal interlocks on all water circuits related |
|
2318
|
Friday, May 06, 2022, 10:12 |
Adam Newsome | Spent Target Vault | Maintenance | | | Annual Inspection of Mini-Storage Vault | The annual inspection of the mini-storage
vault was performed today. The following
items were checked: |
|
2319
|
Wednesday, May 11, 2022, 16:15 |
Nadia Jorgenson | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close
mechanism for the Storage Vault door was |
|
2320
|
Wednesday, May 11, 2022, 16:29 |
Nadia Jorgenson | Spent Target Vault | Standard Operation | | | Routine mechanical inspection: storage vault | An
inspection was performed on drive systems
for the main storage vault by Dan McDonald, |
|
2324
|
Wednesday, May 25, 2022, 10:23 |
Nadia Jorgenson | Spent Target Vault | Repair | | | F-308 Loading, Mini-Storage Vault Failure | 5 pails were moved from the mini-storage
vault into F-308's
At one point during the loading the |
|
2325
|
Wednesday, May 25, 2022, 13:23 |
David Wang | ITE | Standard Operation | TM4 | | Annual ITE water signal interlocks. | Annual ITE water signal interlocks check
is done with Rob Shank. All ITE water signal
interlocks work fine. |
|
2342
|
Thursday, June 30, 2022, 14:28 |
Nadia Jorgenson | Safe Module Parking | Standard Operation | | | Annual Inspection of Safe Module Parking - Electrical |
An annual electrical |
|
2343
|
Monday, July 04, 2022, 11:44 |
Nadia Jorgenson | Safe Module Parking | Standard Operation | | | Annual Inspection of Safe Module Parking - Mechanical |
An |
  |
2344
|
Monday, July 04, 2022, 11:54 |
Nadia Jorgenson | Spent Target Vault | Maintenance | | | Added Lubrication,fittings need to be changed | Dan lubricated components on the target
storage vault (This was an outstand task
from annual inspection). No issues on the |
|
2360
|
Tuesday, August 23, 2022, 11:33 |
Carla Babcock | ITE | Repair | | | ITE:ANODE swapped with TCS:ANODE | ITE:ANODE supply reading strange currents
- 17mA with the power supply on and no voltage.
Checked anode circuit from electrical room: |
|
2366
|
Wednesday, September 14, 2022, 13:45 |
Adam Newsome | Spent Target Vault | Development | | | Storage Vault: cable replaced and e-chain upgrade | The motor cable for the storage vault was
replaced as the old one was showing signs
of wear. The U-track that the old cable ran |
|