Entry  Tuesday, February 15, 2022, 11:18, Frank Song, Cooling, Repair, , , Replace 2 leak valves on high active water system v10_v11.jpgv10.jpgv11.jpg
Entry  Wednesday, February 16, 2022, 15:19, Frank Song, Cooling, Repair, , , high active cooling water valves repaired/replaced RETURN_drain_valve_in_ITE.jpgFEBIAD_COIL_in_ITW.jpgENTRANCE_COLLIMATOR_RETURN_in_ITW.jpgMAIN_S_and_R_VALVES_in_ITW.jpg
Entry  Thursday, February 24, 2022, 13:23, David Wang, ITE/ITW, Maintenance, , , Polyurethane water cooling lines replacement in ITE and ITW.  
Entry  Friday, February 25, 2022, 10:22, Adam Newsome, South Hot-Cell, Development, , , Addition of E-Stops and Turntable Vertical Motion Limit Switch 
Entry  Tuesday, March 01, 2022, 11:51, David Wang, Spent Target Vault, Maintenance, , , UCx #32 has been repacked in NHC.  
Entry  Wednesday, March 02, 2022, 10:51, David Wang, ITE/ITW, Standard Operation, , , Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel.  
Entry  Monday, April 04, 2022, 10:44, Nadia Jorgenson, South Hot-Cell, Repair, , , Turntable Chain Repair Hot_Cell_Chain_1.jpgHot_Cell_Chain_2.jpg
Entry  Monday, April 04, 2022, 21:04, Carla Babcock, Conditioning Station, Development, TM2, , HV testing of IGLIS wires in TM2 
Entry  Wednesday, April 13, 2022, 11:54, Carla Babcock, South Hot-Cell, Maintenance, TM2, , EZL cable change MicrosoftTeams-image_(25).png
Entry  Thursday, April 28, 2022, 08:16, David Wang, ITW, Standard Operation, TM2, , Annual ITW water signal interlocks check . 
Entry  Friday, May 06, 2022, 10:12, Adam Newsome, Spent Target Vault, Maintenance, , , Annual Inspection of Mini-Storage Vault 
Entry  Wednesday, May 11, 2022, 16:15, Nadia Jorgenson, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test 
Entry  Wednesday, May 11, 2022, 16:29, Nadia Jorgenson, Spent Target Vault, Standard Operation, , , Routine mechanical inspection: storage vault Motor_wiring_ISAC_storage_vault.jpg
Entry  Wednesday, May 25, 2022, 10:23, Nadia Jorgenson, Spent Target Vault, Repair, , , F-308 Loading, Mini-Storage Vault Failure 
Entry  Wednesday, May 25, 2022, 13:23, David Wang, ITE, Standard Operation, TM4, , Annual ITE water signal interlocks. 
Entry  Thursday, June 30, 2022, 14:28, Nadia Jorgenson, Safe Module Parking, Standard Operation, , , Annual Inspection of Safe Module Parking - Electrical  
Entry  Monday, July 04, 2022, 11:44, Nadia Jorgenson, Safe Module Parking, Standard Operation, , , Annual Inspection of Safe Module Parking - Mechanical  SMP_Missing_Washers_1.jpgSMP_Missing_Washers_2.jpgSMP_Missing_shims.jpg
Entry  Monday, July 04, 2022, 11:54, Nadia Jorgenson, Spent Target Vault, Maintenance, , , Added Lubrication,fittings need to be changed Mini_Vault_Grease_Fitting.jpg
Entry  Tuesday, August 23, 2022, 11:33, Carla Babcock, ITE, Repair, , , ITE:ANODE swapped with TCS:ANODE 
Entry  Wednesday, September 14, 2022, 13:45, Adam Newsome, Spent Target Vault, Development, , , Storage Vault: cable replaced and e-chain upgrade PXL_20220914_183329159.jpg