  2305   Tuesday, February 15, 2022, 11:18 Frank SongCoolingRepair  Replace 2 leak valves on high active water system The valves #V10 & V11 beside
high active water pumps were replaced in
Target Hall, pics attached.
 v10_v11.jpgv10.jpgv11.jpg 
  2306   Wednesday, February 16, 2022, 15:19 Frank SongCoolingRepair  high active cooling water valves repaired/replaced A 3/8 inch drain valve on return
cooling line was replaced in ITE. In the
meantime two 1/2 inch valves labeled FEBIAD
 RETURN_drain_valve_in_ITE.jpgFEBIAD_COIL_in_ITW.jpgENTRANCE_COLLIMATOR_RETURN_in_ITW.jpgMAIN_S_and_R_VALVES_in_ITW.jpg 
  2308   Thursday, February 24, 2022, 13:23 David WangITE/ITWMaintenance  Polyurethane water cooling lines replacement in ITE and ITW. Polyurethane  water cooling lines
in ITE and ITW  HV shroud are replaced. 
Both stations Ta, Tu, MSP, HS, Coil , EE
  
  2309   Friday, February 25, 2022, 10:22 Adam NewsomeSouth Hot-CellDevelopment  Addition of E-Stops and Turntable Vertical Motion Limit SwitchTwo changes have been made to the control
system to the South Hot Cell:

    Addition of two emergency
  
  2310   Tuesday, March 01, 2022, 11:51 David WangSpent Target VaultMaintenance  UCx #32 has been repacked in NHC. UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to  take out
his samples( in two small plastic containers)
  
  2311   Wednesday, March 02, 2022, 10:51 David WangITE/ITWStandard Operation  Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel. Replaced 9 old turbo pumps from ITE/ ITW
and  one 2A3M20 wire scanner from ITE
are transferred to cyclotron tunnel for storage.
  
  2312   Monday, April 04, 2022, 10:44 Nadia JorgensonSouth Hot-CellRepair  Turntable Chain Repair Last week we repaired
the South Hot Cell turntable chain/sprocket.
 Hot_Cell_Chain_1.jpgHot_Cell_Chain_2.jpg 
  2313   Monday, April 04, 2022, 21:04 Carla BabcockConditioning StationDevelopmentTM2 HV testing of IGLIS wires in TM2TM2 is in the TCS without containment box
for HV testing following the installation
of the IGLIS wiring.
  
  2314   Wednesday, April 13, 2022, 11:54 Carla BabcockSouth Hot-CellMaintenanceTM2 EZL cable changeChad changed the EZL cable and plugs on
TM2. New cable runs along the cable trays.
 MicrosoftTeams-image_(25).png 
  2317   Thursday, April 28, 2022, 08:16 David WangITWStandard OperationTM2  Annual ITW water signal interlocks check .Annual ITW water signal interlocks check
was done with TM2 in ITW.   Water
signal interlocks on all water circuits related
  
  2318   Friday, May 06, 2022, 10:12 Adam NewsomeSpent Target VaultMaintenance  Annual Inspection of Mini-Storage VaultThe annual inspection of the mini-storage
vault was performed today. The following
items were checked:
  
  2319   Wednesday, May 11, 2022, 16:15 Nadia JorgensonSpent Target VaultStandard Operation  Emergency Close Mechanism Test The emergency close
mechanism for the Storage Vault door was
  
  2320   Wednesday, May 11, 2022, 16:29 Nadia JorgensonSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault An
inspection was performed on drive systems
for the main storage vault by Dan McDonald,
 Motor_wiring_ISAC_storage_vault.jpg 
  2324   Wednesday, May 25, 2022, 10:23 Nadia JorgensonSpent Target VaultRepair  F-308 Loading, Mini-Storage Vault Failure5 pails were moved from the mini-storage
vault into F-308's
At one point during the loading the
  
  2325   Wednesday, May 25, 2022, 13:23 David WangITEStandard OperationTM4 Annual ITE water signal interlocks.Annual ITE water signal interlocks check
is done with Rob Shank. All ITE water signal 
interlocks work fine. 
  
  2342   Thursday, June 30, 2022, 14:28 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Electrical  
An annual electrical
  
  2343   Monday, July 04, 2022, 11:44 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Mechanical  
An
 SMP_Missing_Washers_1.jpgSMP_Missing_Washers_2.jpgSMP_Missing_shims.jpg 
  2344   Monday, July 04, 2022, 11:54 Nadia JorgensonSpent Target VaultMaintenance  Added Lubrication,fittings need to be changedDan lubricated components on the target
storage vault (This was an outstand task
from annual inspection). No issues on the
 Mini_Vault_Grease_Fitting.jpg 
  2360   Tuesday, August 23, 2022, 11:33 Carla BabcockITERepair  ITE:ANODE swapped with TCS:ANODEITE:ANODE supply reading strange currents
- 17mA with the power supply on and no voltage.
Checked anode circuit from electrical room:
  
  2366   Wednesday, September 14, 2022, 13:45 Adam NewsomeSpent Target VaultDevelopment  Storage Vault: cable replaced and e-chain upgradeThe motor cable for the storage vault was
replaced as the old one was showing signs
of wear. The U-track that the old cable ran
 PXL_20220914_183329159.jpg 