Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 128 of 141  Not logged in ELOG logo
  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  2231   Wednesday, July 07, 2021, 11:59 Adam NewsomeSafe Module ParkingMaintenance  Annual Electrical and Mechanical InspectionAn annual electrical and mechanical inspection
was performed on the SMP today by Adam Newsome,
Dan McDonald, and Jason Zhang as per Work
 Capture.PNGPXL_20210707_162143876.jpgPXL_20210707_162918257.jpg 
  2234   Thursday, July 15, 2021, 09:02 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism TestThe emergency close mechanism for the Storage
Vault door was tested  by Adam Newsome and
Travis Cave. The door was opened to its fully
  
  2235   Tuesday, July 20, 2021, 09:46 Adam NewsomeITEStandard OperationTM4 Remotely moved TM4 from TCS to ITETM4 was moved from the conditioning station
to the East target station. 
  
  2237   Friday, July 30, 2021, 16:31 Carla BabcockITERepair  ITE re-wireSee the attached for the way ITE has been
re-wired for the Ta62 run. Note also that
the copper block in the schematic on TBHT
 ISK4425D-rev9._APshortmitigationsvg_july27update.png 
  2240   Tuesday, August 10, 2021, 10:16 Adam NewsomeSouth Hot-CellRepair  West Entrance Module Move to South Hot CellThe West Entrance Module has been moved
to the South Hot Cell for repair. 
  
  2241   Wednesday, August 11, 2021, 11:15 Adam NewsomeSpent Target VaultDevelopment  Mini-Storage: Cable track for e-chain installedA cable track was installed between the
mini-storage vault and the silos, for the
purpose of implementing a retractable cable
 PXL_20210811_165201449.jpg 
  2242   Thursday, August 12, 2021, 14:13 Adam NewsomeITWRepair  West Entrance Module Move to ITWThe West Entrance Module has been moved
from the South Hot Cell to the West Target
Station.
  
  2250   Thursday, September 23, 2021, 19:04 Adam NewsomeSpent Target VaultDevelopment  Mini-Storage: Remote CapabilityRemote capability was added for the mini-storage
door control. The control signals originate
from the Opto 22 Module box that is used
  
  2256   Wednesday, October 06, 2021, 10:42 David WangITERepair  ITE IG1S cable end connector replacementITE IG1S cable end connector replacement
has been finished by Roy Huang. 
  
  2268   Monday, November 15, 2021, 12:15 Adam NewsomeSouth Hot-CellRepair  Squeaking noise during turntable rotation - chain misalignment and improper tensionIt was noted on Nov. 9 that a squeaking
noise was present when the turntable was
rotated CCW with a module present.
 PXL_20211119_190640081.jpg 
  2271   Friday, November 19, 2021, 12:48 Adam NewsomeSouth Hot-CellDevelopment  Vertical motion limit switch installationA rotary limit switch was installed, attached
to the shaft adjacent to the drive motor
for the vertical drive system. This limit
 PXL_20211119_172142852.jpg 
  2272   Monday, November 22, 2021, 12:44 Adam NewsomeCraneRepair  Crane PLC Fault: 0004hAn issue was observed in which the target
hall crane was not functioning: the N-E-S-W
and up/down motions did not work, however
 Fault_code_when_connecting_Nov_22_2021.png 
  2274   Tuesday, November 23, 2021, 10:58 Adam NewsomeSouth Hot-CellStandard OperationTM4 TM4 MoveTM4 was moved from ITE to SHC. Shield plug
installed in ITE. 
  
  2276   Wednesday, November 24, 2021, 09:08 Adam NewsomeConditioning StationStandard OperationTM4 Remotely moved TM4 from SHC to TCSTM4 was moved from the South Hot Cell to
the Conditioning Station. 
  
  2279   Monday, November 29, 2021, 12:16 David WangSpent Target VaultStandard Operation  Five spent targets have been loaded into F308sWe loaded UCx #29 , SiC #38  , Ta#53,
Ta#56 ,and Ta#57 from mini storage 
into F308 flasks.  Later, the flasks
  
  2284   Thursday, January 06, 2022, 10:37 David WangITWStandard OperationTM2 ITW vacuum vessel and TM2 internal cooling lines leak check in pit. Frank  and I finished ITW and TM2 leak
check. TM2 internal water-cooling lines 
are leak free. They passed 70 psi helium
  
  2285   Thursday, January 06, 2022, 13:54 David WangITEStandard OperationTM4 helium pressure test on TM4 internal cooloing lsine at ITE.Helium pressure 70 psi. 3 minutes on each
circle untill LR on LD is balanced. Base
leak rate on LD:0.0xE-9 atm.cc/sec.  
  
  2286   Monday, January 10, 2022, 09:31 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check. ITE primary and secondary  vacuum
vessel leak check has been down.  Base
leak rate 0.0x E-9 atm.cc/sec on LD. Only
  
  2287   Monday, January 10, 2022, 12:38 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from ITW to NHC.Travis and Nadia moved TM2 from ITW to
NHC this morning. The move is smooth and
successful.
  
  2288   Tuesday, January 11, 2022, 11:50 David WangITWMaintenance   ITW Exit module 1 side sqaure panel O-ing seal replacement.Frank and I replaced ITW Exit module 1
side square service panel o-ring seal. Also,
The target module pit top flange o-ring seal
  
ELOG V2.9.2-2455