2268
|
Monday, November 15, 2021, 12:15 |
Adam Newsome | South Hot-Cell | Repair | | | Squeaking noise during turntable rotation - chain misalignment and improper tension | It was noted on Nov. 9 that a squeaking
noise was present when the turntable was
rotated CCW with a module present. |
|
2271
|
Friday, November 19, 2021, 12:48 |
Adam Newsome | South Hot-Cell | Development | | | Vertical motion limit switch installation | A rotary limit switch was installed, attached
to the shaft adjacent to the drive motor
for the vertical drive system. This limit |
|
2272
|
Monday, November 22, 2021, 12:44 |
Adam Newsome | Crane | Repair | | | Crane PLC Fault: 0004h | An issue was observed in which the target
hall crane was not functioning: the N-E-S-W
and up/down motions did not work, however |
|
2274
|
Tuesday, November 23, 2021, 10:58 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | | TM4 Move | TM4 was moved from ITE to SHC. Shield plug
installed in ITE. |
|
2276
|
Wednesday, November 24, 2021, 09:08 |
Adam Newsome | Conditioning Station | Standard Operation | TM4 | | Remotely moved TM4 from SHC to TCS | TM4 was moved from the South Hot Cell to
the Conditioning Station. |
|
2279
|
Monday, November 29, 2021, 12:16 |
David Wang | Spent Target Vault | Standard Operation | | | Five spent targets have been loaded into F308s | We loaded UCx #29 , SiC #38 , Ta#53,
Ta#56 ,and Ta#57 from mini storage
into F308 flasks. Later, the flasks |
|
2284
|
Thursday, January 06, 2022, 10:37 |
David Wang | ITW | Standard Operation | TM2 | | ITW vacuum vessel and TM2 internal cooling lines leak check in pit. | Frank and I finished ITW and TM2 leak
check. TM2 internal water-cooling lines
are leak free. They passed 70 psi helium |
|
2285
|
Thursday, January 06, 2022, 13:54 |
David Wang | ITE | Standard Operation | TM4 | | helium pressure test on TM4 internal cooloing lsine at ITE. | Helium pressure 70 psi. 3 minutes on each
circle untill LR on LD is balanced. Base
leak rate on LD:0.0xE-9 atm.cc/sec. |
|
2286
|
Monday, January 10, 2022, 09:31 |
David Wang | ITE | Standard Operation | TM4 | | ITE primary and secondary vacuum vessel leak check. | ITE primary and secondary vacuum
vessel leak check has been down. Base
leak rate 0.0x E-9 atm.cc/sec on LD. Only |
|
2287
|
Monday, January 10, 2022, 12:38 |
David Wang | North Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from ITW to NHC. | Travis and Nadia moved TM2 from ITW to
NHC this morning. The move is smooth and
successful. |
|
2288
|
Tuesday, January 11, 2022, 11:50 |
David Wang | ITW | Maintenance | | | ITW Exit module 1 side sqaure panel O-ing seal replacement. | Frank and I replaced ITW Exit module 1
side square service panel o-ring seal. Also,
The target module pit top flange o-ring seal |
|
2289
|
Tuesday, January 11, 2022, 11:51 |
David Wang | North Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from NHC to SMP. | TM2( no target ) has been moved from
NHC to SMP. The moving is smooth and
successful. |
|
2294
|
Wednesday, January 19, 2022, 13:26 |
David Wang | Crane | Standard Operation | | | Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02. | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02..
He certified the use of these two frames. |
   |
2295
|
Wednesday, January 19, 2022, 13:36 |
David Wang | Crane | Standard Operation | | | Targe hall crane below hook attachment pins and plates annual inspection. | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01.
He certified the use of these pins and plates. |
 |
2298
|
Monday, January 24, 2022, 11:18 |
David Wang | ITE/ITW | Standard Operation | | | TH emergency exit hatch functional check | TH emergency exit hatch which is located
on TH west end roof is opened and closed
for functional check. The hatch works fine. |
|
2299
|
Tuesday, January 25, 2022, 08:57 |
David Wang | ITE/ITW | Standard Operation | | | ITE/ITW have been cleaned with vacuum canister. | ITE/ITW are cleaned with vacuum canister.
HV cage inside and blue nylon insulators
are wiped. Garbage inside the pits |
|
2300
|
Tuesday, January 25, 2022, 12:49 |
David Wang | ITE/ITW | Standard Operation | | | Target station vacuum system visual inspection. | Two shielding blocks above vacuum
station at TH west end were opened for inspection.
Checked ITH:MP1, MP2 lubricant color and |
|
2301
|
Wednesday, February 02, 2022, 11:05 |
David Wang | Crane | Standard Operation | | | Target hall overhand crane annual insepection. | Tom Kauss finished target hall overhead
crane annual inspection today. The crane
works fine. He issued new inspection tag |
|
2303
|
Thursday, February 10, 2022, 12:24 |
David Wang | ITW | Standard Operation | | | ITW HV test without mdoule. | Carla did the test. and reported
the result as following: HV testing of ITW
is complete. It was pretty well behaved up |
|
2304
|
Thursday, February 10, 2022, 12:42 |
David Wang | ITE | Standard Operation | | | ITE HV test woithout mdoule was done. | Carla
did the test. That is what she wrote in Feb
04th: "I am done with the HV testing |
|