  1538   Tuesday, May 16, 2017, 14:19 Travis CaveConditioning StationStandard OperationTM4UC#20module moved

TM#4 with UC#20 has been moved from the south hot cell to the conditioning station.

  1540   Wednesday, May 17, 2017, 08:35 David WangConditioning StationStandard OperationTM4 TCS turbo pumps was started yesterday

Anders started TCS turbo-pumps yesterday. The TCS and TM4 pumping down is good so far. I started TCS water pumps this morning for TCS water flow check.

2017-05-17 morning:  Stopped the water pumps. The field around the TM4 is high because of spent target in SHC. The water flow measurement will be delayed to this Friday.

  1541   Thursday, May 18, 2017, 10:08 David WangConditioning StationStandard OperationTM4 TM4 TP1 at TCS

TM4 TP1 was found making some noise during operation this morning. The current draw was check then. It was 1.8 A which is higher than 1.0A normal range. The pump body temperature was higher by hand feeling. But,1.0 hour later when checking again, everything on the pump goes back to normal. It is still fine so far. I will watch on this pump closely.

 2017-05-19,morning.  The TM4 TP1 stopped running last night.  I tried to start it this morning. But, It can't pass 6KRMP even. I think we have to replace it.    E- fault will be issued as well.   

  1543   Thursday, May 18, 2017, 11:36 Travis CaveConditioning StationStandard OperationTM4UC#20Electrical Check

Electrical check of TM#4 with UC#20 at the conditioning station under vacuum. See attached for details.

Attachment 1: TM4_UC20_Elec_chk_CS_vac.PDF
TM4_UC20_Elec_chk_CS_vac.PDF TM4_UC20_Elec_chk_CS_vac.PDF
  1544   Friday, May 19, 2017, 12:25 David WangConditioning StationStandard OperationTM4 TCS and TM4 water flow measurement.

 

 

  TCS(LPM) Freq(HZ) TCS+TM4(LPM) Freq(HZ)
Ta 5.5 106 3.7 68
Tu 5.6 107 4.3 79
Coil(RU only) 5.8 112 4.6 92
HS 7.0 13 6.6 12
MSP 6.4 21 5.8 21
EE 5.6 112 3.8 77
Window 4.5 81 4.3 78

 

  1545   Friday, May 19, 2017, 13:49 David WangConditioning StationRepairTM4 TM4 TP1 at TCS

TM4 TP1 is replaced. TCS and TM4 was argon vented before the job.The job took about 30minutes.  I started the all turbo pumps after job. All pumps work fine. The TCS vacuum is good.     

  1551   Wednesday, June 07, 2017, 13:33 David WangConditioning StationStandard OperationTM2 TM2 SiC#36 leakc check and electrical check.

The results  are good. See attachment.

Attachment 1: TM2_SiC_36#_leak_check_an_delectrical_check..pdf
TM2_SiC_36#_leak_check_an_delectrical_check..pdf
  1552   Wednesday, June 07, 2017, 13:34 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.

I started all turbo pumps.

  1553   Thursday, June 08, 2017, 07:37 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 water llines at TCS.
  The helium pressure test on HS line is done at TCS this morning. I got the same result as last time when we helium pressure it it with first target in April. The leak  rate on this line is 1.8 XE-7atm.cc/sec. So, we know this leak is mostly on the line, but not on the VCR joints connecting the target.  See attachment for last time(April) checking e-log. The leak could be from water block which is same as other lines. I do not think this leak rate will affect the operation.

The attachment can not be opened for some reasons. Please check TM2 leak check  2017-03-13 e- log for last time test result and comment.

Attachment 1: TM2_helium_pressure_test..png
TM2_helium_pressure_test..png
  1554   Thursday, June 08, 2017, 08:35 David WangConditioning StationDevelopmentTM2 TM2 gas line reconfiguration on the module top.

Reconfigured TM2 gas line on the module top. It matches with the febiad gas line we are using on service tray now. Facing the module, both of them should be that right side line of two SST lines on feed-through. The gas line on TM2 was leak checked with a blind cap installed on service tray side and LD connected on module top this Tuesday. It is leak free with helium spray on the top of module and service tray.

Attachment 1: TM2_gas_line_on_the_top_002.JPG
TM2_gas_line_on_the_top_002.JPG
  1561   Monday, June 19, 2017, 07:29 David WangConditioning StationStandard OperationTM2 Update TH MS project schedule.

Update TH MS project schedule. See attachment 1,2.

Attachment 1: Target_Hall_shedule_132_Apr_to_Sep.pdf
Target_Hall_shedule_132_Apr_to_Sep.pdf
Attachment 2: Target_Hall_shedule_132_Apr_to_Sep.mpp
  1567   Tuesday, June 27, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Module move

 TM#4 with Ta#52 has been moved from south hot cell to the conditioning station.

  1569   Tuesday, June 27, 2017, 14:34 David WangConditioning StationStandard OperationTM4 TM4 vacuum has been connected at TCS

Turbo -pumps are started . The vacuum looks good so far.

  1570   Wednesday, June 28, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Electrical Check

Results of electrical check of TM#4 with Ta#52 at the south hot cell and the conditioning station under vacuum.

Attachment 1: TM4_Ta52_Elec_chk_SHC_CSvac.PDF
TM4_Ta52_Elec_chk_SHC_CSvac.PDF TM4_Ta52_Elec_chk_SHC_CSvac.PDF
  1571   Wednesday, June 28, 2017, 10:00 David WangConditioning StationStandard OperationTM4Ta#52TM2 has been connected at TCS

I started TCS water system.

  1572   Wednesday, June 28, 2017, 16:43 Anders MjosConditioning StationStandard OperationTM4Ta#52Conditioning Ta#52

NEW HV cable for BIAS installed earlier this week.

Wednesday, June 28, 2017, 16:42: BIAS at 20 kV

Wednesday, June 28, 2017, 16:46: BIAS at 30 kV, EZL at 15 kV

Wednesday, June 28, 2017, 17:00: BIAS at 35 kV, EZL at 17.5 kV


The voltage response on TBHT and TGHT changed as the target was heated up. This was later determined to be due to target shorting to heat shield and the grounding of the power supplies being achieved at the HV pedestal in the target hall and not in the HV enclosure as is done online. When this was changed, the target operated normally again.

Attachment 1: Ta#52.docx
  1574   Thursday, June 29, 2017, 11:55 David WangConditioning StationRepair  TCS HV cable and feed through installation

John Chow and I installed new TCS HV cable and feed through with their mounting panel back to TCS Faraday cage this Tuesday. ECO-4269 has been issued for the new cable feed through and mounting panel.

  1576   Wednesday, July 05, 2017, 11:18 Anders MjosConditioning StationMaintenanceTM4Ta#52Changed electrical configuration to cathode bias

 John Chow configured TCS to cathode bias mode (IRH1538). The anode P/S is in positive mode.

  1580   Monday, July 10, 2017, 10:19 David WangConditioning StationStandard OperationTM4 Turned off TCS water system

Prepare for TM4 move tomorrow morning.

  1582   Wednesday, July 12, 2017, 11:05 Anders MjosConditioning StationMaintenance  Testing of new high voltage cable

The target hall has been locked-out as per Document-70039.

Forced IG1, IG1S and IG2 to switch on BIAS power supply

Wednesday, July 12, 2017, 11:53: 70 kV at 0.16 mA

2 sparks observed shortly after 70 kV was reached

Wednesday, July 12, 2017, 12:59: No sparks for the last hour.

BIAS power supply off. Forces removed.

Attachment 1: 2017-07-12_HV_Cable_Test.xlsx