2211
|
Wednesday, April 21, 2021, 11:18 |
David Wang | Cooling | Maintenance | | | Refilling high active wtaer system and starting HA water pumps. | High active water system is refilled. Air
are drained out of system before pump
to be started. Following sequence are used |
|
|
2215
|
Monday, May 03, 2021, 15:14 |
Frank Song | ITE | Maintenance | | | High voltage test in ITE | Anders and I prepared ITE high voltage
test in April 30 ( Friday morning), The MAA
is locked for this. |
|
|
2216
|
Friday, May 14, 2021, 11:29 |
David Wang | Spent Target Vault | Standard Operation | | | Repack of 4 spent targets. | Repack of 4 spent targets in TH and SHC.
SiC#37 to new pail249#. SiC#36 to new pail
250#. Nb#8 to new pail 247#, SiC#33 to new |
|
|
2217
|
Tuesday, May 25, 2021, 15:59 |
Matthew Gareau | North Hot-Cell | Development | | | Removed boot from left hot manipulator | Myself and Isaac removed the boot
from the left hot manipulator.
- opened the hatch in the TH to get |
7x |
|
2218
|
Tuesday, May 25, 2021, 16:20 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller maintenance | A contractor on site today for chiller
maintenance. CP2 and CP3 circuit is leaking
and shall not be used. CP1 can still be used. |
|
|
2219
|
Tuesday, May 25, 2021, 16:20 |
Anders Mjos | Conditioning Station | Maintenance | | | TK2 refilled | Tank refilled from 12 in to 25 in using
the new valve. |
|
|
2230
|
Wednesday, June 30, 2021, 14:11 |
Matthew Gareau | North Hot-Cell | Standard Operation | | | North Hot Cell Commemorative Opening | Yesterday a bottle of Cava (sparkling
wine) was place, opened, and poured in the
NHC, to commemorate its new operational status. |
|
|
2231
|
Wednesday, July 07, 2021, 11:59 |
Adam Newsome | Safe Module Parking | Maintenance | | | Annual Electrical and Mechanical Inspection | An annual electrical and mechanical inspection
was performed on the SMP today by Adam Newsome,
Dan McDonald, and Jason Zhang as per Work |
|
|
2234
|
Thursday, July 15, 2021, 09:02 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close mechanism for the Storage
Vault door was tested by Adam Newsome and
Travis Cave. The door was opened to its fully |
|
|
2237
|
Friday, July 30, 2021, 16:31 |
Carla Babcock | ITE | Repair | | | ITE re-wire | See the attached for the way ITE has been
re-wired for the Ta62 run. Note also that
the copper block in the schematic on TBHT |
|
|
2239
|
Friday, August 06, 2021, 11:52 |
Travis Cave | North Hot-Cell | Standard Operation | | UC#33 | Spent Target Move | UC#33 has been packed and moved from the north
hot cell to the spent target vault. See attached
PDF for
|
|
|
2240
|
Tuesday, August 10, 2021, 10:16 |
Adam Newsome | South Hot-Cell | Repair | | | West Entrance Module Move to South Hot Cell | The West Entrance Module has been moved
to the South Hot Cell for repair. |
|
|
2241
|
Wednesday, August 11, 2021, 11:15 |
Adam Newsome | Spent Target Vault | Development | | | Mini-Storage: Cable track for e-chain installed | A cable track was installed between the
mini-storage vault and the silos, for the
purpose of implementing a retractable cable |
|
|
2242
|
Thursday, August 12, 2021, 14:13 |
Adam Newsome | ITW | Repair | | | West Entrance Module Move to ITW | The West Entrance Module has been moved
from the South Hot Cell to the West Target
Station. |
|
|
2247
|
Friday, September 17, 2021, 14:28 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#62 | Spent Target Move | The spent Ta#62 target along with
2A2M19 were placed in pail #256 and placed
in spot 7A of the spent target vault. See |
|
|
2249
|
Wednesday, September 22, 2021, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#34 | Spent Target Move | The spent UC#34 target was moved
from the north hot cell to the spent target
vault. See attached PDF for details. |
|
|
2250
|
Thursday, September 23, 2021, 19:04 |
Adam Newsome | Spent Target Vault | Development | | | Mini-Storage: Remote Capability | Remote capability was added for the mini-storage
door control. The control signals originate
from the Opto 22 Module box that is used |
|
|
2256
|
Wednesday, October 06, 2021, 10:42 |
David Wang | ITE | Repair | | | ITE IG1S cable end connector replacement | ITE IG1S cable end connector replacement
has been finished by Roy Huang. |
|
|
2259
|
Wednesday, October 13, 2021, 11:54 |
Travis Cave | North Hot-Cell | Standard Operation | | SiC#41 | Spent Target Move | The spent SiC#41 target has been
placed in pail #260 and placed in spot 5B
of that spent target vault. See attached |
|
|
2261
|
Friday, October 29, 2021, 12:27 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#56 | Repacking of the target. | Ta#56 in pail #169 was repacked and
placed into #269 and was placed in the mini
vault at the back. It was 3.86mSv/hr upon |
|