  966   Friday, June 26, 2015, 15:38 Anders MjosConditioning StationDevelopmentTM2 Leak check and HV testRoughing started by David.
Friday, June 26, 2015, 15:31: Started
TP1S
  
  973   Thursday, July 02, 2015, 10:22 Anders MjosConditioning StationMaintenanceTM2 TP1S failed See e-fault 8233. Edi assisted in
diagnosing the problem. The pump will have
to be replaced.
  
  977   Friday, July 03, 2015, 09:27 Anders MjosConditioning StationDevelopment  Controls working on access control in EPICS Some reboots will be done.   
  981   Tuesday, July 07, 2015, 10:50 Anders MjosConditioning StationDevelopment  EPICS migration update - archiver
    The archiver is now merged with
ISAC - data available under Utilities
- Archiver Retrieval
    Old
  
  988   Thursday, July 09, 2015, 13:17 Anders MjosConditioning StationStandard OperationTM1 TM1 in TCS for alpha contamination test Thursday, July 09, 2015, 13:17: Water
package started.
Thursday, July 09, 2015, 15:20: Water
  
  992   Friday, July 10, 2015, 14:41 Anders MjosConditioning StationMaintenanceTM1 Replaced roughing pump The roughing pump was replaced with
a more leak tight pump due to the discovery
of Rn-220 migration while roughing on TM1
  
  1039   Monday, August 17, 2015, 10:44 Anders MjosConditioning StationDevelopmentTM2LP-FEBIAD Test Target (empty)Conditioning TM2 Source Tray with FEBIAD test targetTGHT, TBHT, ANODE and COIL power tested
(some amps/volts)
Monday, August 17, 2015, 10:43: BIAS/EL/EE
 FirstBeamTM2SourceTray2015-08-17.pngTM2_Source_Tray_with_FEBIAD_test_target.docx 
  1045   Friday, August 21, 2015, 11:38 Anders MjosSouth Hot-CellRepairTM2FEBIAD Test TargetSteerer wires found to be touching the gas linesYesterday TM2 was inspected in the SHC.
Spark marks were found both on the steerer
wires and on the ANODE wire. The steerer
  
  1048   Wednesday, August 26, 2015, 09:54 Anders MjosConditioning StationMaintenance  Topped up water in TCS:TK2 Filled to 24.9 in   
  1055   Thursday, August 27, 2015, 10:10 Anders MjosConditioning StationStandard OperationTM2ZrC#7Conditioning new Source TrayThursday, August 27, 2015, 10:10: Started
water system. TK2 level reduced from 24.9
to 23.5 in. 
 2015-08-31_Service_Cap_Sparking_on_Rubber_Plug.pdfTM2_Source_Tray_with_ZrC#7.docxVacuum_gague_calibration.xlsx 
  1061   Tuesday, September 01, 2015, 16:55 Anders MjosConditioning StationMaintenance  TBHT power supply remvoed The power supply is needed as a spare
for the failed TGHT p/s in ITW
  
  1067   Friday, September 11, 2015, 14:31 Anders MjosConditioning StationMaintenanceTM2ZrC#7Vacuum gauge and EPICS read back calibrationThe corelation betwenn the local value
on the gauge controllers and the read back
valiues in EPICS was compared. Data can be
  
  1090   Monday, October 05, 2015, 10:19 Anders MjosConditioning StationMaintenance  Chiller maintenance will be performed Tuesday October
6th
Tuesday, October 06, 2015: Maintenance
  
  1106   Monday, October 19, 2015, 15:52 Anders MjosSouth Hot-CellStandard OperationTM2SiC#32Electrical and leak check An electrical check was completed
by Travis C and Anders M. Note ~250 kOhm
between Target and 60 kV common. Leak check
 ITW-TM2-SiC#32-HP-FEBIAD_Electrical_Check_SHC_(pre).pdf 
  1111   Wednesday, October 21, 2015, 11:58 Anders MjosSouth Hot-CellDevelopmentTM2ZrC#7Extraction Electrode inspectionThe failed extraction electrode was inspected
in the hot cell this morning by Anders and
Chad. The following electrical measurements
  
  1117   Friday, November 06, 2015, 14:36 Anders MjosConditioning StationDevelopmentTM3FEBIAD test targetTesting TM3Friday, November 06, 2015, 14:35: Roughing
Turbos was started around 4pm. Later
it was found that the manual valve for the
  
  1118   Friday, November 06, 2015, 14:44 Anders MjosConditioning StationRepairTM3 O-rings replaced on service capO-rings were replaced on the service cap
by Anders, Maico, Aurelia and Keith under
work permit  I2015-11-05-5
  
  1119   Monday, November 09, 2015, 16:47 Anders MjosConditioning StationMaintenanceTM3FEBIAD Test TargetLeak check of Service CapService cap leak checked this afternoon.
Found multiple leaks of 10E-8 to 10E-7 range.
Connected to the backing line with IG1 at
  
  1120   Tuesday, November 10, 2015, 10:23 Anders MjosConditioning StationMaintenanceTM3 Air to vacuum leak on service capConducted a more thorough leak check this
morning with Edi. He found a leak on the
base of the  blue F/T insulator for
 TM3_Service_Cap_Leak.pdf 
  1121   Tuesday, November 10, 2015, 16:53 Anders MjosConditioning StationDevelopmentTM3FEBIAD test targetTesting TM3Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24:
TP1S started
 2015-11-13_TCS_TM3_FEBIAD_Test_Target.docx 