248
|
Tuesday, February 26, 2013, 10:26 |
Travis Cave | ITW | Standard Operation | TM1 | | module move |
TM1 moved from the west station to the southwest silo. Move went well. |
247
|
Friday, February 22, 2013, 13:13 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | Broken Turbo Pump |
Today while putting the cover on the cord that goes to the controller was bumped. This bent the connector down and caused a vacuum leak. I tried to tighten the bolts in the hope the leak would go away but it did not and I sheared one of the bolts off. David is inquiring with Edi if the pump can be repaired or if it needs to be replaced. The good news is that the interlocks work exactly as planned. Upon detecting a leak they shut the turbos down and closed all of the valves they even beat the turbo controllers for overload.
David believes we can rotate the pump slightly to avoid this problem in the future. Hopefully repairs can start on Monday.
The conditioning station will be shut down for the weekend. |
Attachment 1: IMG_0528.JPG
|
|
246
|
Friday, February 22, 2013, 13:02 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | HV test with Water |
Hello Ray and Yi
Completed a HV test with the water flowing today.
8.96 Mohm
56.4 PSI across the load
16.5 GPM through the loads
some sparking occurred see attached file.
module was biased with all items tied to common to 40kV. Leakage current was less than 100uA.
This was a very successful test. |
Attachment 1: vacuum_for_40k.JPG
|
|
245
|
Thursday, February 21, 2013, 14:05 |
David Wang | ITW | Repair | TM1 | | Disconnected EXIT1 in ITW. |
Disconnected EXIT1 in ITW. All cables , wires and air lines are label marked. |
244
|
Thursday, February 14, 2013, 09:31 |
David Wang | ITW | Repair | | | ITH MP1 is replaced. |
Edi and I replaced the broken ITH MP1 in target hall with a new pump. The old pump was leak on oil. There were no oil had been left in the old pump by checking the sight glass.Thats the reason of the pump failure.The tray which the old pump sat on was full of leaking oil ( highly contaminated ). The old pump was bagged in 3 thick plastic bags ,and the tray was cleaned before the new pump was installed. The working area had been cleaned up and surveyed couple of times after the job. Everything is good. The new pump had been tested after the installation. It works fine. |
243
|
Friday, February 08, 2013, 11:42 |
Grant Minor | ITE | Maintenance | | | TAPC 477 resolved - ISAC elec. room gas cylinder |
See attached TAPC 477 documentation. |
Attachment 1: TAPC-477_resolved_8Feb2013.pdf
|
|
242
|
Wednesday, February 06, 2013, 14:34 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | 40kV All Common w/o Water Test |
Today the module was biased to 40kV in the conditioning station. The current draw was 0uA. Sparking started at 27 kV. I have attached the recording from the strip tool of the vacuum while we were testing. After consulting Pierre if we should take the module to a higher voltage it was decided not to. The purpose of this test we to check the interaction between the module, cover, new cooling line, EE and EINZEL cables. This test was considered a success and although there are no anticipated problems care should be taken when taking the module past 40kV for the first time. |
Attachment 1: 40kV_no_water_HV_test.JPG
|
|
241
|
Monday, January 28, 2013, 12:26 |
Travis Cave | Conditioning Station | Development | | | Switches connected |
the switches and the solenoid are all wire up to 24VDC, when you open either of the little doors the solenoid switches this is also true if there is a power loss. currently the solenoid is powered. |
240
|
Thursday, January 24, 2013, 13:30 |
David Wang | ITW | Standard Operation | TM1 | | ITW-TM1 2013 winter shut down leak check. |
2013 winter shut down ITW-TM1 primary vacuum vessel, secondary vacuum vessel, and water lines leak check: connected leak detector to TP2(primary and water lines) and TP4S (secondary). base leak rate 0.0xE-9atm.cc/sec,base pressure 0.0XE-4torr. Sprayed helium to all primary vacuum seal and there is no response on leak detector. Helium pressurized all water lines(except HS) at 70psi ,3mins.Tube heat(+) no response, tube heater(-)1.6xe-9atm.cc/sec, target oven(-)5.8xe-9atm.cc/sec, target oven (+) 6.9xe-9atm.cc/sec, EE 5.7xe-9atm.cc/sec, MSP no response, window 7.5 xe-9atm.cc/sec.All water lines are water leak free. Two leaks had been found on secondary vacuum vessel. One is on exit 1 to tank o-ring (east side, E-N corner). The leak detector got responses from 1.4 to1.7 xe-7 atm.cc/sec scale . The test hadbeen repeated 4-5 times and confirmed the location . The second one is a small leak which is on exit 2 to tank o-ring(east side, close to E-N corner). The leak detector got responses from 1.4 to 1.8xe-8atm.cc/sec scale. The test had been repeated 3 times and confirmed the location. As the present plan. we will replace the exit1 to tank o-ring during this year shut down time. |
239
|
Friday, January 18, 2013, 17:01 |
Grant Minor | Conditioning Station | Development | TM4 | | Photos of the CS with TM4 (after the no-module HV test, only vacuum connected) |
Attached are some photos of TM4 in the Conditioning Station after the no-module HV test completion. Only vacuum services are connected. |
Attachment 1: CS_post_HV_test_w_TM4_18Jan2013_001.jpg
|
|
Attachment 2: CS_post_HV_test_w_TM4_18Jan2013_003.jpg
|
|
Attachment 3: CS_post_HV_test_w_TM4_18Jan2013_004.jpg
|
|
Attachment 4: CS_post_HV_test_w_TM4_18Jan2013_005.jpg
|
|
238
|
Friday, January 18, 2013, 16:56 |
Grant Minor | Conditioning Station | Standard Operation | TM4 | | VAT valve btwn roughing and nuc. vent. closed |
Bevan attempted to start pumping down on TM4 today remotely but there was an issue. He will report on Monday.
I went into the Target Hall this afternoon while on the phone with Bevan and performed the following:
- Checked the knurled vent valves on the side of each turbo, both were found to be in the tightened position (all the way clockwise)
- Closed the VAT valve between the scroll pump and the nuclear ventilation |
237
|
Friday, January 18, 2013, 11:17 |
David Wang | South Hot-Cell | Standard Operation | TM4 | dummy target | TM4 heat shield circuit leak check with dummy target on. |
Chad and i did a leak check on TM4 heat shield circuit with installed dummy target at SHC today. The leak detector is pumped to 0.0xE-9atm.cc/sec.Chad sprayed helium twice on each VCR joints .There is no any response had been found on the leak detector during each 45 seconds waiting time. The TM4 heat shield circuit with dummy target is leak tight so far. |
236
|
Friday, January 18, 2013, 11:15 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move |
TM#4 with the test target #1 is now in the conditioning station, move went well. |
235
|
Friday, January 18, 2013, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | CS Test Target #1 | Electrical check |
Electrical check performed on the CS Test Target #1 at the south hot cell. See PDF for details. |
Attachment 1: CS_Test_Target_#1_Elec_check.PDF
|
|
234
|
Thursday, January 17, 2013, 11:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | | module move |
TM#4 has been moved from the SW silo to the south hot cell, move went well. |
233
|
Thursday, January 17, 2013, 10:06 |
chad fisher | South Hot-Cell | Standard Operation | | | SiC Test Target for TM4/CS |
I have inserted the test target for TM4 and the CS into the hot cell.
I had some concerns about the condition of the target which I have discussed with Pierre and he has cleared. Pictures are attached. |
Attachment 1: IMG_0909[1].JPG
|
|
Attachment 2: IMG_0910[1].JPG
|
|
Attachment 3: IMG_0911[1].JPG
|
|
Attachment 4: IMG_0912[1].JPG
|
|
Attachment 5: IMG_0913[1].JPG
|
|
Attachment 6: IMG_0914[1].JPG
|
|
Attachment 7: IMG_0915[1].JPG
|
|
Attachment 8: IMG_0916[1].JPG
|
|
Attachment 9: IMG_0917[1].JPG
|
|
Attachment 10: IMG_0918[1].JPG
|
|
Attachment 11: IMG_0919[1].JPG
|
|
Attachment 12: IMG_0920[1].JPG
|
|
Attachment 13: IMG_0921[1].JPG
|
|
Attachment 14: IMG_0922[1].JPG
|
|
Attachment 15: IMG_0923[1].JPG
|
|
Attachment 16: IMG_0924[1].JPG
|
|
232
|
Tuesday, January 15, 2013, 14:37 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#3 | Spent target move |
TiC #3 was moved from the south hot cell in to the vault storage today, it was placed in slot 4B and was in pail #104, it had a reading of 98.7mSv/hr upon removal from the south hot cell. See attached PDF for vault details. |
Attachment 1: Vault_Storage_January_15_2013.pdf
|
|
231
|
Tuesday, January 15, 2013, 10:49 |
David Wang | ITW | Standard Operation | TM1 | no target | TM1 vacuum system connection in ITW |
I connected TM 1 vacuum system in ITW. The TM1 and ITW will be pumped out for shut down routine leak check. |
230
|
Monday, January 14, 2013, 14:09 |
Travis Cave | ITW | Standard Operation | TM1 | no target | module move |
TM#1 has been moved from the south hot hell to the west target station, move went well. |
229
|
Thursday, January 10, 2013, 10:40 |
David Wang | ITW | Maintenance | | | Replaced all high active water system magnetic pedal wheels in ITW and ITE. |
I replaced all high active water system magnetic pedal wheels in ITW and ITE. This is a preventive maintenance job we planned for this winter shut down. |