Entry  Wednesday, April 12, 2017, 16:39, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 Inspection at the South Hot Cell DSC_0886.JPGDSC_0883.JPG
Found spark signs on TM3's containment on the side of the water blocks. They may be OLD or/and NEW sparking signs, but this in not determined at this
moment. Please see picture: first attachment. First and second attachment show the profiles of water block and HV lines. 
    Reply  Wednesday, April 26, 2017, 16:52, Aurelia Laxdal, South Hot-Cell, Repair, TM3, , TM3 Lower Service Tray Video Inspection FiberGlassInST.tiff


    
        
            chad fisher wrote:
        
        
            
            A video inspection of the lower service tray was performed this morning. Camera was inserted upwards
Entry  Wednesday, April 26, 2017, 17:37, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 HV tests at atmosphere Pictures from April 19-21, 2017 DSC_0950.JPGDSC_0899.JPGSparkMarkEETM3.jpg

Please see the first two pictures of the HV test at atmosphere done on April 19.
Entry  Wednesday, April 26, 2017, 17:55, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 Schedule updates at the South Hot Cell and CS April_–_May_2107_TM3_Updated_Schedule_at_the_SHC_and_TCS.docxApril_–_May_2107_TM3_Initial_Schedule_at_the_SHC_and_TCS.docx
Please see TM3's Updated Schedule (the current schedule) at the SHC and TCS.
For the record I am uploading TM3's Initial Schedule  at the SHC and TCS.
Entry  Thursday, April 27, 2017, 19:59, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 HV tests at atmosphere for Each Line(s) April 27, 2017 
Today a HV test at atmosphere was performed for Each Line(s), while floating the other lines.
Please note the Einzel Lens line (Y) was grounded.
Tests performed:
Entry  Sunday, April 30, 2017, 20:57, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 May 1-15, 2017 Tentative Schedule at the SHC and TCS May_2107_TM3_Schedule_at_the_South_Hot_Cell_and_TCS.docx
Please see attachment for TM3 May 1-15, 2017 Tentative Schedule at the SHC and TCS.
Entry  Tuesday, May 02, 2017, 18:33, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 HV tests at atmosphere for Each Line(s) after the Fiber Glass removal May 2, 2017 
Today a HV test at atmosphere was performed for Each Line(s), while floating the other lines. THIS TEST AT ATMOSPHERE IS THE FIRST ONE AFTER THE FIBER
GLASS WAS REMOVED.
Please note:
Entry  Thursday, May 04, 2017, 19:10, Aurelia Laxdal, Conditioning Station, Repair, TM3, no target, TM3 HV test at TCS up to 50kV 
Today TM3 was conditioned up to 50kV. At 50kV sparking started and to go higher in voltage it needs more conditioning time. Lowered it to 49kV for the
night.
Entry  Friday, May 05, 2017, 19:36, Aurelia Laxdal, Conditioning Station, Repair, TM3, no target, TM3 HV test at TCS up to 65kV 
Today TM3 HV conditioning went up to 65kV. I'll leave it here over night. ISAC OPS have instructions to keep an alarm on the HV, and ion gauge and turbo
pump (TP2 tripped 3 times due to sparking).
Entry  Saturday, May 06, 2017, 13:30, Aurelia Laxdal, Conditioning Station, Repair, TM3, no target, TM3 current limiting  
Today the voltage was raised from 65kV to 65.7kV. After about 10min at this level TM3 started current limiting. TM3 was not sparking when this happened.
ISAC OPS turned it OFF and then tried to ramp it back ON, but could not do it due to the current limiting.
I turned OFF/ON the PS (locally) 20ming ago and and then tried to get it back from the Control Room, but around 4-5kV it started current limiting.
    Reply  Monday, July 17, 2017, 17:50, Aurelia Laxdal, Conditioning Station, Development, TM3, No target, Conditioning TM3 2017-07-17-16_53_03.grab.LWYG0y.png


    
        
            Anders Mjos wrote:
        
        
            
            50 kV stable with less than 1 spark/h during the weekend by RIB obs.
Entry  Tuesday, June 06, 2023, 15:10, Antoniette Yap, Spent Target Vault, Maintenance, , , Annual Inspection of Main and Mini Storage Vaults 
The annual inspection of the mini-storage vault and main storage vault was completed June 23, 2023. The following items were checked:

    Cabling and cable management
    Connectors
    Controls box - internal wiring and components, functionality

   Limit switches - functionality, wiring, mounting
    Motor
    Bearings
    Set screws
    Miscellaneous
    Reply  Tuesday, March 13, 2012, 12:24, Anders Mjos, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 Autopsy Inspection_of_UCx#3_in_the_South_Hot_Cell.docx


    
        
            chad fisher wrote:
        
        
            
            An autopsy was performed on UCx#3 yesterday afternoon. This autopsy followed the plan written by Anders.
Entry  Wednesday, December 05, 2012, 15:53, Anders Mjos, South Hot-Cell, Standard Operation, , UCx#5, Target inspection - target tube broken 
The target was inspected today.
It was found that the target tube had broken on both sides of the centre block in the region that contain target material. The Ta-foil heat shield
was removed from the let side tube to allow inspection.
Entry  Thursday, August 15, 2013, 16:35, Anders Mjos, ITE, Repair, TM4, SiC#29, Leak found on Coil 1 ITE_Leak_Test_2013-08-14.pdf
By pressurizing the water lines with 70 psi helium David
and I detected a major leak on the Coil 1 circuit. The response maxed out on the leak rate on the leak detector and we could also see a pressure increase
Entry  Monday, August 19, 2013, 10:08, Anders Mjos, ITE, Repair, TM4, SiC#29, Leak Check ITE_Leak_Test_2013-08-19.pdf
All water circuits except Coil 1 were leak checked by David and Anders. No obvious signals were detected except some small possible responses. See attached
notes for details.
Entry  Tuesday, October 08, 2013, 14:58, Anders Mjos, South Hot-Cell, Standard Operation, , SiC#29, Target to Heat Shield electrical short 
The SiC#29 CTL target has been taken apart with the help of Isaac and Chad. Electrical measurements were done between Target and Heat Shield as the target
was disassembled. Work was done on October 2nd, 4th, 7th and 8th.
The megger showed about 30kOhm at 50V with the following changes
Entry  Tuesday, October 22, 2013, 14:23, Anders Mjos, ITE, Standard Operation, TM3, NiO#2, Padlle wheel frequency measurements ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow.pdf
as measured today in the electrical room by David and Anders
Entry  Thursday, October 24, 2013, 15:43, Anders Mjos, South Hot-Cell, Standard Operation, TM4, Ta#41, Target conductance Ta#41_electrical_measurement_TGHT_in_SHC.pdf
The conductance check on the electrical check was found to be outside of accepted values for the TBHT at 7.0 mOhm. A successful attempt to reduce the
conductance was made by re-tightening the bolts on the TGHT legs in the SHC. Grant operated the manipulator and torqued the bolts to about 1/8 of a turn
with the air ratchet. The conductance across the TGHT (A-B) could be improved from 7.0 mOhm to 6.2 mOhm by re-tightening the bolts. The value is still
Entry  Friday, October 25, 2013, 13:39, Anders Mjos, ITE, Standard Operation, TM3, NiO#2, Padlle wheel frequency measurements ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_wITW-TM4.pdf
with TM4 in ITW as measured today in the electrical room by David and Anders.
 