Message ID: 2452     Entry time: Tuesday, June 06, 2023, 15:10
Author: Antoniette Yap 
Category: Spent Target Vault 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Annual Inspection of Main and Mini Storage Vaults 

The annual inspection of the mini-storage vault and main storage vault was completed June 23, 2023. The following items were checked:

  • Cabling and cable management
  • Connectors
  • Controls box - internal wiring and components, functionality
  • Limit switches - functionality, wiring, mounting
  • Motor
  • Bearings
  • Set screws
  • Miscellaneous fasteners

The inspection was generally successful. A couple of minor findings were:

  • Bearings for both the main and mini storage vaults must be greased. This is planned for a different day as it involves removing the mini vault's door.
  • There was a small piece of metal on the track for the mini storage vault which was causing the door to "bump" over it as it passed over. This piece was removed and the door behaved normally.
  • The wheel track for the main storage vault was dirty - it was cleaned
  • It was suggested that the 120 VAC power cable for the mini storage vault controls box should be connectorized - this will be added to the "to-do list" for the future

 