  1043   Thursday, August 20, 2015, 11:00 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical CheckTM#2 electrical check at the conditioning
station. All pumps were off but the module
was not vented.
 TM2_elecchkdummytgtatCS.PDF 
  1047   Wednesday, August 26, 2015, 09:20 Travis CaveSouth Hot-CellStandard OperationTM2ZrC #7Electrical CheckElectrical check of TM#2 with ZrC #7 installed  TM2_elec_chk_ZrC7_SHC.PDF 
  1054   Thursday, August 27, 2015, 08:43 Travis CaveConditioning StationStandard OperationTM2ZrC #7Electrical CheckElectrical check of TM#2 at the conditioning
station under vacuum. The resistance value
of the target to 60kV common is a bit lower
 TM2_elec_chk_ZrC7_CS.PDF 
  1073   Tuesday, September 22, 2015, 11:35 Travis CaveSouth Hot-CellStandard OperationTM4UC#13Electrical CheckTM#4 with UC#13 post beam electrical check.
Also and electrical check was done without
the target on.
 TM4elecchkUC13postbeamSHC.PDFTM4_elecchk_totgt_with_IGLISline.PDF 
  1074   Tuesday, September 22, 2015, 11:39 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Electrical CheckTM#4 electrical check with Ta#46 attached.  TM4Ta46elecchkSHC.PDF 
  1077   Wednesday, September 23, 2015, 13:56 Travis CaveConditioning StationStandard OperationTM4Ta#46Electrical CheckTM#4 electrical check at the conditioning
station with Ta#46 target.
 TM4Ta46elecchkCS.PDF 
  1088   Wednesday, September 30, 2015, 11:14 Travis CaveSouth Hot-CellRepairTM3no targetElectrical CheckTM#3 electrical check at the south hot
cell, no target, all value are done at 1000Volts.
See the attached PDF for the results.
 TM3_elecchk_notgt_shc.PDF 
  1173   Friday, March 18, 2016, 13:13 Travis CaveConditioning StationStandard OperationTM2SiC#32Electrical CheckElectrical checks of the TM#2 with the
old SiC#32 and without the target. See attached
PDFs.
 TM2_SiC32_postbeam.PDFTM2_elec_chk_notgt_CS.PDF 
  1184   Wednesday, March 30, 2016, 11:00 Travis CaveConditioning StationStandard OperationTM1no targetElectrical CheckThe results of the TM#1 electrical check
from the 29th of March 2016
 TM1_elec_chk_notgt.PDF 
  1186   Friday, April 01, 2016, 11:41 Travis CaveSouth Hot-CellStandard OperationTM1UC#15Electrical CheckElectrical check of the target on TM#1,
target in question is UC#15. See PDF for
details.
 TM1_elec_chk_UC#15_SHC.PDF 
  1196   Wednesday, April 06, 2016, 14:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#14, No Target, Ta#47Electrical CheckVarious electrical checks done on TM#4,
one of post beam UC#14, of no target and
with Ta#47. See PDFs for details.
 TM4_elec_chk_notgt_SHC.PDFTM4_elec_chk_Ta47_SHC.PDFTM4_elec_chk_UC14_SHC_postbeam.PDF 
  1227   Tuesday, May 10, 2016, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#48Electrical CheckElectrical check of TM#2 with Ta#48 attached.
See the attached PDF for details.
 TM2_elec_chk_Ta48_SHC.PDF 
  1248   Thursday, June 02, 2016, 08:44 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical CheckElectrical check of TM#3 no target at the
south hot cell. see attached for results.
 TM3_elec_chk_no_tgt.PDF 
  1274   Wednesday, July 06, 2016, 09:59 Travis CaveSouth Hot-CellStandard OperationTM2Ta#48 and SiC#33Electrical CheckElectrical check done on TM#2 with Ta#48,
no target and SiC#33 the short on the coils
to 60kV is still present it is on the R-U
 TM2_elechk_Ta48_SHC_postbeam.PDFTM2_elechk_SiC33_SHC.PDFTM2_elechk_notgt_SHC.PDF 
  1304   Wednesday, August 03, 2016, 10:02 Travis CaveSouth Hot-CellStandard OperationTM4UC#17Electrical CheckThe result of yesterdays electrical check
on TM#4 with UC#17.
 TM4_elechk_UC17_SHC.PDF 
  1399   Tuesday, November 22, 2016, 11:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical CheckElectrical check of TM#2 with the SiC#35 
post beam run. See attached PDF for details.
 TM2_elechk_SiC35_postbeam.PDF 
  1402   Wednesday, November 23, 2016, 14:25 Travis CaveSouth Hot-CellStandard OperationTM2UC#18Electrical CheckResults of TM#2 with UC#18 electrical at
the south hot cell. See attached PDF for
details.
 TM2_elechk_UC18_SHC.PDF 
  1458   Thursday, March 23, 2017, 09:30 Travis CaveSouth Hot-CellStandard OperationTM2test targetElectrical CheckElectrical check of the Ta test target
on TM#2
 TM2_Ta_Dummytgt_Preandpost.PDF 
  1466   Monday, March 27, 2017, 13:40 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical CheckDid the start of the running year electrical
checks of both TM#2 and TM#4 with no target
attached to either module. TM#2 was in the
 TM2__No_Tgt.PDFTM4__No_Tgt.PDF 
  1468   Tuesday, March 28, 2017, 10:30 Travis CaveSouth Hot-CellStandard OperationTM4UC#19Electrical CheckElectrical check done on TM#4 with UC#19.
See attached PDF for results.
 TM4__UC19_SHC.PDF 