ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
1626
|
Tuesday, September 26, 2017, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Electrical Check | Electrical check of TM#2 with Ta#54 at
the south hot cell. See attached PDF for
details. |
|
1644
|
Wednesday, October 18, 2017, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#37 | Electrical Check | The results of the electrical check
of TM#4 with SiC#37, see attached PDF. |
|
1659
|
Monday, November 13, 2017, 13:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 and #55 | Electrical Check | The results of the various electrical
check done on the target module on November
7th and 8th of 2017. Checks were done with |
|
1707
|
Tuesday, May 01, 2018, 13:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#37 | Electrical Check | Electrical check of TM#4 with SiC#37
attached post beam. A short was found between
the Einzel Lens and Chassis. See attached |
|
1708
|
Thursday, May 03, 2018, 08:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical Check | The results of yesterdays electrical
check of TM#4 with no target attached. See
the attached PDF for details. |
|
1730
|
Thursday, June 07, 2018, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#22 | Electrical Check | The results of TM#4 with UC#22 electrical
check. See attached PDF. |
|
1747
|
Friday, June 29, 2018, 13:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Nb#8 | Electrical Check | The results of the various electrical
checks performed on the TM#2 with and without
the Nb#8 target attached. |
|
1768
|
Monday, August 20, 2018, 09:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#56 and UC#23 | Electrical Check | Electrical Checks of the last two
targets Ta#56 and UC#23 |
|
1774
|
Thursday, August 30, 2018, 14:16 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#56, UC#24, and no target | Electrical Check | Results of the electrical check with
the spent Ta#56 attached, no target attached
and the UC#24 attached. These test were performed |
|
1785
|
Thursday, September 20, 2018, 08:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check | Results of the electrical check on
TM#2 with no target after Chad cleaned out
the bolt hole on the module where the target |
|
1786
|
Thursday, September 20, 2018, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | nSiC#1 | Electrical Check | TM#2 with the nSiC#1 target had its
check done on it at the south hot cell see
attached for results. |
|
1804
|
Wednesday, October 10, 2018, 10:50 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#57 | Electrical Check | The various electrical check done
on TM#4 after the UC run and before the start
of the Ta run. |
|
1814
|
Wednesday, October 31, 2018, 14:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | nSiC#1 and UC#25 | Electrical Check | TM#2 with targets nSiC#1 (old target)
and UC#25 (new target) electrical check results.
See attached for details. |
|
1831
|
Wednesday, November 28, 2018, 11:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#57 and UC#26 | Electrical Check | Electrical check of TM#4 with the
old Ta#57, no target and with new IG-LIS
UC#26 target. See attached PDF for details. |
|
1851
|
Wednesday, January 09, 2019, 13:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#25 | Electrical Check | Electrical check of the target module
with the UC#25 attached after the beam run. |
|
1899
|
Tuesday, March 26, 2019, 11:10 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Dummy Target | Electrical Check | Electrical Check of TM#2 with the
dummy target attached. |
|
1912
|
Tuesday, April 30, 2019, 11:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#26 | Electrical Check | Electrical check of TM#4 with UC#26
post beam at the south hot cell. See attached. |
|
1915
|
Wednesday, May 01, 2019, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical Check | Electrical check of the TM#4 with
no target attached at the south hot cell
before being moved to the south west silo. |
|
1923
|
Thursday, May 16, 2019, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 | Electrical Check | Results of the electrical check of
TM#2 without target and with the new Ta#58
target. |
|
1933
|
Thursday, June 06, 2019, 10:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target, no source Tray | Electrical Check | Results from the electrical check
of TM#4 at the south hot cell with no source
tray. R&U are shorted and when meggered |
|