ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  2084   Friday, March 13, 2020, 09:24 Travis CaveITEStandard Operation  Entrance module move The east entrance module has been
moved from the south hot cell back to the
east target station.
  
  2087   Tuesday, March 17, 2020, 12:58 David WangSouth Hot-CellDevelopmentTM4 P2N target electrical check and leak check at SHC.See attachment. Everything looks good.
 P2N_target_electrical_chek_at_SHC.pdf 
  2089   Wednesday, March 18, 2020, 10:40 David WangITEDevelopmentTM4 TM4 P2N target connection checklist.TM4 has been connected in ITE. See checklist.  P2N_TM4_connection_checklist.pdf 
  2090   Thursday, March 19, 2020, 15:48 Anders MjosConditioning StationMaintenance  Filter replacement in water system March 5thFilters were replaced by Curtis von Cube
on March 5th. See work permit for details
I2020-03-05-5
  
  2091   Friday, March 27, 2020, 08:45 Matthew GareauNorth Hot-CellMaintenance  Issues with the manipulators This is a link to all of the issues
with the NHC manipulators that I know of

  
  2092   Wednesday, May 20, 2020, 13:08 David WangCoolingStandard Operation  Start of HALCW sysytemHigh  active water pump is started.
The system resistance is recovering now.
Everything works fine so far. Check ITW and
  
  2093   Wednesday, May 20, 2020, 13:19 David WangITEMaintenance  Restart of ITE turbo pumps. PLC6 drop out in weekend caused the ITH
MP1 and MP1s stopped. ITE turbo pumps were
running still after that. Without back up
  
  2094   Wednesday, May 20, 2020, 13:30 David WangSafe Module ParkingMaintenance  Silo area radio active waste clean up. Sorted and packed one 55 gallon drum with
low contamination and active stuffs which
are placed around silo area in the past.
  
  2095   Friday, May 22, 2020, 13:26 David WangITWRepair  ITW water leak.A water leak was found on a fitting connecting
ITW dump return line pressure gauge on top
of exit module. TM tank flange, o-ring slot
 itw_water_leak_001.JPGitw_water_leak_005.JPGitw_water_leak_009.JPGitw_water_leak_013.JPG 
  2096   Monday, June 01, 2020, 12:40 David WangCraneMaintenance  TH crane festoon cable maintenanceTom Kauss corrected the TH crane 
festoon cable loops. He lubricated festoon
cable wheels as well.    The maintenance
  
  2097   Monday, June 01, 2020, 12:46 David WangITEMaintenance  ITH:CM6 ,CM6S and ITM:CM3 calibration.Edi calibrated ITH:CM6, CM6S and ITM:CM3.
By the same time,  ITH:MP1 and MP2 
lubricate oil level are checked. Everything
  
  2098   Thursday, June 04, 2020, 10:40 David WangConditioning StationMaintenance   Three manual valves are closed on TCS water system Three manual valves are closed on TCS water
system return line in experimental hall.
See attachments. It is for TCS TK2 water
 TCS_return_line_closed_valves_001.JPGTCS_return_line_closed_valves_002.JPG 
  2099   Thursday, June 04, 2020, 10:51 David WangConditioning StationStandard Operation  TH floor mop up.Jason Sargeant mopped up TH floor this
morning. The mop head was checked after the
job. There are 1500 counts on it. He think
  
  2100   Thursday, June 11, 2020, 11:49 David WangITEMaintenance  ITW and ITE thermocouple status.     
  2101   Thursday, June 11, 2020, 12:36 David WangSafe Module ParkingRepairTM3 TM3 containment box and service tray field measurement. At 15cm distance: Containment box   
  2109   Tuesday, June 23, 2020, 10:56 David WangSafe Module ParkingStandard Operation  SMP annual service. Dan and I did the SMP annual  maintenance
service today. Lid open/close , vessel rotation
and limit switch check, lubricate chains,
  
  2111   Friday, June 26, 2020, 10:43 Adam NewsomeSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault and mini-storage drive systemsAn inspection was performed on drive systems
for both storage vaults (main and mini) by
Adam Newsome and Dan McDonald. The functionality
 IMG_20200626_092538.jpgIMG_20200626_093208.jpgIMG_20200626_093924.jpgIMG_20200626_093951.jpg 
  2112   Friday, June 26, 2020, 15:00 David WangITWMaintenance  ITW TP1 and TP1S.ITW TP1 can not be started yesterday. Also,
TP1S was difficult to start , and had a high
current draw after.  We changed both
  
  2123   Tuesday, July 07, 2020, 17:43 Carla BabcockITEDevelopmentTM4 RF tests on new IG-LIS wiringTested RF from RF driver into new IGLIS
wires at ITE. Used 5V, 1MHz (2MHz setting
because of internal halving issue).
  
  2125   Thursday, July 16, 2020, 10:20 Adam NewsomeSafe Module ParkingMaintenance  SMP: Annual Electrical InspectionAn electrical systems check was performed
on the SMP by Adam Newsome and Travis Cave.
Overall, there were no issues to
  