Friday, April 01, 2016, 11:41, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#15, Electrical Check
|
Electrical check of the target on TM#1, target in question is UC#15. See PDF for details. |
Wednesday, April 06, 2016, 14:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#14, No Target, Ta#47, Electrical Check
|
Various electrical checks done on TM#4, one of post beam UC#14, of no target and with Ta#47. See PDFs for details. |
Tuesday, May 10, 2016, 14:27, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#48, Electrical Check
|
Electrical check of TM#2 with Ta#48 attached. See the attached PDF for details. |
Thursday, June 02, 2016, 08:44, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical Check
|
Electrical check of TM#3 no target at the south hot cell. see attached for results. |
Wednesday, July 06, 2016, 09:59, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#48 and SiC#33, Electrical Check
|
Electrical check done on TM#2 with Ta#48, no target and SiC#33 the short on the coils to 60kV is still present it is on the R-U coil line. See attached PDFs for details. |
Wednesday, August 03, 2016, 10:02, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, Electrical Check
|
The result of yesterdays electrical check on TM#4 with UC#17. |
Tuesday, November 22, 2016, 11:56, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#35, Electrical Check
|
Electrical check of TM#2 with the SiC#35 post beam run. See attached PDF for details. |
Wednesday, November 23, 2016, 14:25, Travis Cave, South Hot-Cell, Standard Operation, TM2, UC#18, Electrical Check
|
Results of TM#2 with UC#18 electrical at the south hot cell. See attached PDF for details. |
Thursday, March 23, 2017, 09:30, Travis Cave, South Hot-Cell, Standard Operation, TM2, test target, Electrical Check
|
Electrical check of the Ta test target on TM#2 |
Monday, March 27, 2017, 13:40, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check
|
Did the start of the running year electrical checks of both TM#2 and TM#4 with no target attached to either module. TM#2 was in the south hot cell and TM#4 is in the conditioning station under vacuum. |
Tuesday, March 28, 2017, 10:30, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#19, Electrical Check
|
Electrical check done on TM#4 with UC#19. See attached PDF for results. |
Tuesday, April 11, 2017, 11:30, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#51, Electrical Check
|
Electrical check performed on TM#2 with Ta#51, see attached PDF. |
Wednesday, April 12, 2017, 13:03, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical Check
|
Electrical check of TM#3 with no target at the south hot cell |
Tuesday, May 16, 2017, 14:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#20, Electrical Check
|
TM#4 with UC#20 has had the electrical check done on it at the south hot cell, see attached for details |
Thursday, May 18, 2017, 11:36, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#20, Electrical Check
|
Electrical check of TM#4 with UC#20 at the conditioning station under vacuum. See attached for details. |
Wednesday, June 28, 2017, 09:14, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#52, Electrical Check
|
Results of electrical check of TM#4 with Ta#52 at the south hot cell and the conditioning station under vacuum. |
Tuesday, August 01, 2017, 14:39, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#36, Electrical Check
|
The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well. |
Monday, August 28, 2017, 14:40, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#21, Electrical Check
|
The results of the electrical check of TM#4 with UC#21 attached. |
Thursday, September 21, 2017, 10:48, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#53, Electrical Check
|
Electrical checks of TM#2 with Ta#53 and also with out a target. |
Friday, September 22, 2017, 11:00, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check
|
Electrical check of TM#2 after the insulator change on thursday september 21. |
|