753
|
Tuesday, September 23, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10, Ta#44 | Electrical check | Electrical checks of TM#4 with UC#10 post
beam and Ta#44 before beam see attached PDF
for details. |
 |
761
|
Tuesday, October 14, 2014, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check | TM#1 with ZrC#6 post beam electrical check
see attached pdf for results. |
|
763
|
Tuesday, October 14, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check | Electrical check of TM#1 with no target
attached at the south hot cell see attached
PDF for details. |
|
777
|
Monday, November 03, 2014, 13:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Electrical check | TM#1 with ThO#1 electrical check see attatched
PDF for details. |
|
794
|
Wednesday, November 19, 2014, 09:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#11 | Electrical check | TM#4 with UC#11 electrical check done.
See attached PDF for the results. |
|
810
|
Thursday, December 04, 2014, 09:54 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical check | Results of electrical check of TM#2 with
no source tray and no containment box attached.
See PDF for results. |
|
870
|
Tuesday, March 24, 2015, 13:57 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical check | TM#4 electrical checks with and without
the target installed, installed target is
Ta#45. |
 |
874
|
Thursday, March 26, 2015, 09:20 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#45 | Electrical check | Electrical check of TM#4 with Ta#45 at
the conditioning station, see attached pdf
for details. |
|
888
|
Friday, April 17, 2015, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#12 | Electrical check | Electrical check of TM#1 with UCx#12 attached.
See attached PDF for details. |
|
1106
|
Monday, October 19, 2015, 15:52 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | SiC#32 | Electrical and leak check | An electrical check was completed
by Travis C and Anders M. Note ~250 kOhm
between Target and 60 kV common. Leak check |
|
538
|
Tuesday, November 12, 2013, 10:59 |
Bevan Moss | South Hot-Cell | Standard Operation | TM2 | | Electrical Test | Don Jackson and Myself completed
started an electrical test on TM2. All lines
passed the with OL to ground. When testing |
|
1900
|
Tuesday, March 26, 2019, 11:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Checks of TM#2 during the source tray change. | The four electrical check done on
TM#2 during the source tray change. |
   |
1360
|
Friday, September 23, 2016, 08:55 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#34 | Electrical Checks | The bundle of electrical checks, first
one is the Iglis that failed, the second
is the everything passed at the hot cell |
|
1382
|
Monday, October 24, 2016, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | Electrical Checks | Results of the electrical check of TM#2
with no target after the repair and with
the SiC#35 mounted on the module. |
 |
123
|
Friday, June 08, 2012, 15:03 |
Don Jackson | South Hot-Cell | Standard Operation | TM1 | Ta38 | Electrical Check on new Ta38 at hot cell | Megger checks were exceptionally high (good).
Readings taken less than 2 hours after reading low
values from end of run on Nb#6. Tests |
|
1517
|
Monday, May 01, 2017, 13:11 |
David Wang | South Hot-Cell | Repair | TM3 | | Electrical Check on TM3 after fibergalss is moved in SHC. | RU( coil 1), F (anode), and 60kv bias(HS,
Gasline, and MSP) are shorted together.
Other lines are good. They are measured |
|
1597
|
Tuesday, August 15, 2017, 09:27 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check of target in SHC |
|
|
2354
|
Tuesday, August 09, 2022, 12:23 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #64 | Electrical Check for TM4 with Ta#64 after beam at NHC | An electrical check made at NHC right
after TM4 moving from ITE. |
|
1484
|
Friday, April 07, 2017, 09:53 |
Travis Cave | Conditioning Station | Maintenance | TM1 | no target | Electrical Check and TM1 other checks | Results of an electrical check on TM#1
with no target attached to it.
I use this e-log entry for |
|
122
|
Friday, June 08, 2012, 15:00 |
Don Jackson | South Hot-Cell | Standard Operation | TM1 | Nb#6 | Electrical Check Nb#6 at end of run | Megger check values were low but still
within operational range. |
|