Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 122 of 138  Not logged in ELOG logo
Entry  Thursday, June 20, 2019, 15:09, Isaac Earle, Safe Module Parking, Development, , , SMP motor wiring inspected by electrician 
Entry  Thursday, July 04, 2019, 08:57, Isaac Earle, Safe Module Parking, Development, , , SMP vacuum system installed 20190703_122635.jpg20190703_122646.jpg20190703_122702.jpg
Entry  Friday, July 26, 2019, 15:43, Isaac Earle, Safe Module Parking, Development, , , SMP vacuum control system completed SMP_vacuum_system_EPICS_screen.png
Entry  Friday, August 23, 2019, 14:27, Isaac Earle, Safe Module Parking, Development, , , SMP camera video cabling installed and tested 
Entry  Tuesday, August 27, 2019, 13:12, Adam Newsome, Safe Module Parking, Development, , , SMP Remote Control Wiring Inspection 
Entry  Tuesday, September 10, 2019, 14:04, David Wang, ITW, Standard Operation, , , ITW water interlock check. 
Entry  Wednesday, September 18, 2019, 14:28, Travis Cave, Spent Target Vault, Standard Operation, , , Repacking of the targets. 
Entry  Thursday, September 19, 2019, 10:11, Travis Cave, Spent Target Vault, Standard Operation, , , Repacking of the targets. 
Entry  Monday, September 23, 2019, 13:21, Travis Cave, Spent Target Vault, Standard Operation, , , Repacking of the targets. Target_Index_2019-09-23_Mini_Vault.pdf
Entry  Monday, September 30, 2019, 11:27, Isaac Earle, Safe Module Parking, Development, , , SMP vacuum vessel modifications completed 
Entry  Wednesday, October 02, 2019, 08:25, chad fisher, South Hot-Cell, Standard Operation, , ZrC#8, ZrC#8 PIE 20191002_081653[1].jpg
Entry  Thursday, October 03, 2019, 10:25, Travis Cave, Spent Target Vault, Standard Operation, , ZrC#8, Spent Target Move Target_Index_2019-10-02.pdf
Entry  Wednesday, October 09, 2019, 13:28, Travis Cave, Spent Target Vault, Standard Operation, , UC#27, Spent Target Move Target_Index_2019-10-09.pdf
Entry  Thursday, October 10, 2019, 16:17, Adam Newsome, Safe Module Parking, Development, , , SMP Main Panel: Relay Addition for E-Stop Circut Changes_to_IRH1869.JPGIMG_20191009_153336_-_new_relay_for_E-stop.jpg
Entry  Tuesday, October 15, 2019, 16:42, Isaac Earle, Safe Module Parking, Development, , , SMP flange alignment tested using shield plug smp1.jpgsmp2.jpgsmp3.jpgsmp4.jpg
Entry  Thursday, October 17, 2019, 11:49, Travis Cave, Spent Target Vault, Standard Operation, , SiC#31,32 and UC#19,20,21, Loading F-308 
Entry  Tuesday, October 22, 2019, 16:26, Isaac Earle, Safe Module Parking, Development, , , SMP shield box grounding 
Entry  Monday, October 28, 2019, 11:50, Travis Cave, Spent Target Vault, Standard Operation, , UC#28, Spent Target Move Target_Index_2019-10-28.pdf
Entry  Monday, October 28, 2019, 12:00, Isaac Earle, Safe Module Parking, Development, , , SMP shielding attenuation measured & compared to theoretical values 
Entry  Tuesday, October 29, 2019, 10:00, Adam Newsome, Safe Module Parking, Development, , , SMP Updates to E-stop circuit and feedback signals 
ELOG V2.9.2-2455