1880
|
Friday, March 01, 2019, 10:23 |
Travis Cave | Spent Target Vault | Standard Operation | | | Source tray moved | The old TM#2 source tray and TM#4
optics tray have been removed from the vault
and placed into the spent target storage |
|
1882
|
Tuesday, March 05, 2019, 09:38 |
chad fisher | South Hot-Cell | Repair | | | Transfer Fixture Repair | Transfer fixture has been remotely disassembled
to the point where the ball nut lock plate
assembly can be inserted into the tool port |
|
1883
|
Tuesday, March 05, 2019, 14:29 |
chad fisher | South Hot-Cell | Repair | | | Tray Transfer Fixture Repair Complete | Repair of the tray transfer fixture is
complete (minus testing).
A distorted ball nut lock plate was |
|
1903
|
Monday, April 01, 2019, 14:56 |
Isaac Earle | Safe Module Parking | Development | | | SMP shield box and vacuum vessel installed in final location | Last week drilling of the additional
required holes in the SMP shield box was
completed in the Target Hall. This |
|
1904
|
Thursday, April 04, 2019, 14:49 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum vessel support roller friction check | With the SMP vacuum vessel now installed
inside the shield box, a test was performed
to measure the torque required to rotate |
|
1905
|
Friday, April 05, 2019, 13:44 |
chad fisher | Spent Target Vault | Development | | | 2019 Pail drop tests |
Drop test performed January
8, 2019 with 25 lb target, UN pail and lug
cover. Drop failed. Lug cover half removed. |
|
1906
|
Friday, April 12, 2019, 11:44 |
chad fisher | South Hot-Cell | Standard Operation | | | Pail transfer | Pail transfer was undertaken in the south
hot cell. went very well except near the
end the master tong cable of the right hand |
|
1907
|
Wednesday, April 17, 2019, 12:03 |
chad fisher | South Hot-Cell | Repair | | | Manipulator repair | Broken handle cable of east manipulator
has been replaced and manipulator is operational
again. |
|
1908
|
Thursday, April 18, 2019, 10:04 |
Travis Cave | South Hot-Cell | Maintenance | | Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45 | Target transfer from old pail to new pail. | Targets Ta#50 and SiC#34 have been
transferred from their old pails to new ones.
Ta#50 was done on April 12th 2019 it was |
|
1909
|
Monday, April 29, 2019, 07:56 |
chad fisher | South Hot-Cell | Development | | | Pail transfers | Two pail transfers took place April 25th.
Ta#47 transfered from pail 137 to
pail 201. existing plastic bag from 137 showed |
|
1910
|
Monday, April 29, 2019, 09:32 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31,32 and UC#19,20,21 | Spent targets moved to mini vault. | The following targets have been moved
from the spent target vault to the mini vault:
#127 - SiC#31 (front) |
|
1916
|
Thursday, May 02, 2019, 09:37 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#26 | Spent Target Move | The spent UC#26 target was moved
from the south hot cell to the spent target
vault. It was place in pail #209 and put |
|
1917
|
Wednesday, May 08, 2019, 10:29 |
Travis Cave | South Hot-Cell | Standard Operation | | | Entrance module move | The entrance module has been moved
from the west station to the south hot cell. |
|
1918
|
Friday, May 10, 2019, 10:23 |
chad fisher | South Hot-Cell | Repair | | | West Entrance module wire scanner replacement | West entrance module - visible broken or
disconnected wire visible on old/existing
wire scanner. Wire scanner removed, new one |
|
1919
|
Monday, May 13, 2019, 09:55 |
Travis Cave | ITW | Standard Operation | | | Entrance module move | The West Entrance module has been
moved from the south hot cell to the west
target station. |
|
1920
|
Monday, May 13, 2019, 11:22 |
David Wang | ITW | Repair | | | ITW entrance module has been connnected. | Entrance module has been connected back
to ITW. Everything is normal. |
|
1921
|
Wednesday, May 15, 2019, 16:06 |
Isaac Earle | Safe Module Parking | Development | | | SMP module support flange installed and leak checked | The SMP module support flange sub-assembly
(IRH1755) was installed today according to
drawing IRH1683. Dow Corning 111 sealing |
|
1925
|
Friday, May 17, 2019, 16:46 |
Adam Newsome | Safe Module Parking | Development | | | SMP Controls Installation Update |
The following controls-related |
|
1930
|
Thursday, May 23, 2019, 11:22 |
Travis Cave | South Hot-Cell | Maintenance | | | Removing garbage from the south hot cell. | A 55 Gal. drum was remotely lowered
into the south hot cell. It was then filled
with compressable waste. Then the drum was |
|
1937
|
Monday, June 10, 2019, 14:13 |
Travis Cave | Spent Target Vault | Standard Operation | | | Old TM#4 source tray moved | The old TM#4 source tray in the south
hot cell was moved to the spent target vault.
The tray had a low of 7.5mSv/hr to a high |
|