Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1882     Entry time: Tuesday, March 05, 2019, 09:38
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module:  
Target/Number:  
Subject: Transfer Fixture Repair 

Transfer fixture has been remotely disassembled to the point where the ball nut lock plate assembly can be inserted into the tool port and the plate replaced by hand in the tool port without having to enter the hot cell. Straight head screws will be replaced with SHCS to facilitate easier re-assembly and future disassembly.

Attachment 1: 20190305_092228.jpg  1.450 MB  | Show | Hide all
Attachment 2: 20190305_092231.jpg  1.125 MB  | Show | Hide all
Attachment 3: 20190305_092326.jpg  1.219 MB  | Show | Hide all
Attachment 4: 20190305_092558.jpg  1.129 MB  | Show | Hide all
ELOG V2.9.2-2455