ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  1950   Monday, July 15, 2019, 13:29 David WangConditioning StationDevelopmentTM4 Vacuum surge when TM4 B line iwas supplied with water.Yesterday, TM4 B line was supplied with
water at TCS for testing.  TCS: IG1
and IG2 had big response on it. See attachment.
 vacuum_surge_on_B_line_with_water.png 
  1953   Friday, July 26, 2019, 11:28 David WangSouth Hot-CellStandard OperationTM4 TM4 move from SHC to TCS.Tm4 has been moved from SHc to TCS without
containment box. It is a new source tray
on TM4.  A layer of plastic sheet was
  
  1954   Friday, July 26, 2019, 11:41 David WangSouth Hot-CellStandard OperationTM4 TM4 with spare target electrical check and leak check.Electrical check on TM4 with spare test
target. PQ is still shorted to RU. But, The
short between 60KV bias and PQRU which we
  
  1955   Friday, July 26, 2019, 15:43 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum control system completed The SMP vacuum control system has
been wired and setup to be controlled from
EPICS.  Backing valve control (SMP:BV1)
 SMP_vacuum_system_EPICS_screen.png 
  1961   Wednesday, August 14, 2019, 08:55 David WangITEStandard OperationTM2 TM2 has been disconnected in ITE.TM2 has been disconnected in ITE. The bias
jumper between U and T was burned out during
the last beam time. 
  
  1966   Friday, August 16, 2019, 08:51 David WangConditioning StationRepairTM4 TM4 waterlines helium pressure test at TCS.LD base leak rate, 0.0Xe-9atm.cc/sec. Helium
pressure, 70psi. 5 minutes each circuit.
No response on all water line except containment
  
  1967   Friday, August 16, 2019, 08:52 David WangConditioning StationStandard OperationTM4 TM4 is moved from TCS to SW silo.TM4 is moved from TCS to SW silo this morning.
The move is good. 
  
  1970   Friday, August 23, 2019, 14:27 Isaac EarleSafe Module ParkingDevelopment  SMP camera video cabling installed and tested Installation of the video lines for
the SMP cameras was completed yesterday according
to IRH1670 Rev B.  All four cameras
  
  1971   Tuesday, August 27, 2019, 13:12 Adam NewsomeSafe Module ParkingDevelopment  SMP Remote Control Wiring InspectionThe wiring for the SMP remote control module
was inspected by Joel Semilla (TRIUMF  electrician).
 The module was plugged in to verify there
  
  1972   Thursday, August 29, 2019, 12:54 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 MoveTM3 has been moved from the Middle-East
silo to the South Hot Cell.
  
  1973   Tuesday, September 03, 2019, 10:48 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 MoveTM3 has been moved from the South Hot-Cell
to the Middle-East silo. 
  
  1974   Tuesday, September 03, 2019, 10:49 Adam NewsomeSouth Hot-CellStandard OperationTM4 TM4 MoveTM4 has been moved from the Conditioning
Station to the South Hot-Cell.
  
  1975   Wednesday, September 04, 2019, 13:53 chad fisherSouth Hot-CellRepairTM4 TM3 CB to TM4The TM3 containment box has been installed
onto TM4. No issues, leak checked ok.
 
  
  1983   Tuesday, September 10, 2019, 14:04 David WangITWStandard Operation  ITW water interlock check.ITW water interlock check is finished.
Everything is good. 
  
  1984   Thursday, September 12, 2019, 09:26 David WangITWRepairTM4 ITW bad vacuum issue and trouble shoot.ITW secondary vacuum was bad in last two
days after TM4 was connected in ITW. Today
when check the exit 2 module, I found a small
  
  1987   Wednesday, September 18, 2019, 14:28 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. Three of the five targets in the
mini storage have been repackaged into the
stronger pail.
  
  1988   Thursday, September 19, 2019, 10:11 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. Another target in the mini storage
has been repackaged into the new pails. With
one remaining to do which will be done on
  
  1989   Monday, September 23, 2019, 13:21 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. All targets in the mini vault have
been repackaged and are now ready to be loaded
into F-308s. All the target pails have new
 Target_Index_2019-09-23_Mini_Vault.pdf 
  1990   Monday, September 30, 2019, 11:27 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum vessel modifications completedThe SMP vacuum vessel welds were reinforced
to match the specifications on IRH1710 Rev
D.  In addition a tube stub was added
  
  2000   Friday, October 04, 2019, 16:43 David WangConditioning StationStandard OperationTM2 TM2 has been connected at TCS.TM2 has been connected at TCS this morning.
helium pressure test on Tm2 HS line is done.
No leak. 
  