1950
|
Monday, July 15, 2019, 13:29 |
David Wang | Conditioning Station | Development | TM4 | | Vacuum surge when TM4 B line iwas supplied with water. | Yesterday, TM4 B line was supplied with
water at TCS for testing. TCS: IG1
and IG2 had big response on it. See attachment. |
|
1953
|
Friday, July 26, 2019, 11:28 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 move from SHC to TCS. | Tm4 has been moved from SHc to TCS without
containment box. It is a new source tray
on TM4. A layer of plastic sheet was |
|
1954
|
Friday, July 26, 2019, 11:41 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 with spare target electrical check and leak check. | Electrical check on TM4 with spare test
target. PQ is still shorted to RU. But, The
short between 60KV bias and PQRU which we |
|
1955
|
Friday, July 26, 2019, 15:43 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum control system completed | The SMP vacuum control system has
been wired and setup to be controlled from
EPICS. Backing valve control (SMP:BV1) |
|
1961
|
Wednesday, August 14, 2019, 08:55 |
David Wang | ITE | Standard Operation | TM2 | | TM2 has been disconnected in ITE. | TM2 has been disconnected in ITE. The bias
jumper between U and T was burned out during
the last beam time. |
|
1966
|
Friday, August 16, 2019, 08:51 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 waterlines helium pressure test at TCS. | LD base leak rate, 0.0Xe-9atm.cc/sec. Helium
pressure, 70psi. 5 minutes each circuit.
No response on all water line except containment |
|
1967
|
Friday, August 16, 2019, 08:52 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 is moved from TCS to SW silo. | TM4 is moved from TCS to SW silo this morning.
The move is good. |
|
1970
|
Friday, August 23, 2019, 14:27 |
Isaac Earle | Safe Module Parking | Development | | | SMP camera video cabling installed and tested | Installation of the video lines for
the SMP cameras was completed yesterday according
to IRH1670 Rev B. All four cameras |
|
1971
|
Tuesday, August 27, 2019, 13:12 |
Adam Newsome | Safe Module Parking | Development | | | SMP Remote Control Wiring Inspection | The wiring for the SMP remote control module
was inspected by Joel Semilla (TRIUMF electrician).
The module was plugged in to verify there |
|
1972
|
Thursday, August 29, 2019, 12:54 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move | TM3 has been moved from the Middle-East
silo to the South Hot Cell. |
|
1973
|
Tuesday, September 03, 2019, 10:48 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move | TM3 has been moved from the South Hot-Cell
to the Middle-East silo. |
|
1974
|
Tuesday, September 03, 2019, 10:49 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | | TM4 Move | TM4 has been moved from the Conditioning
Station to the South Hot-Cell. |
|
1975
|
Wednesday, September 04, 2019, 13:53 |
chad fisher | South Hot-Cell | Repair | TM4 | | TM3 CB to TM4 | The TM3 containment box has been installed
onto TM4. No issues, leak checked ok.
|
|
1983
|
Tuesday, September 10, 2019, 14:04 |
David Wang | ITW | Standard Operation | | | ITW water interlock check. | ITW water interlock check is finished.
Everything is good. |
|
1984
|
Thursday, September 12, 2019, 09:26 |
David Wang | ITW | Repair | TM4 | | ITW bad vacuum issue and trouble shoot. | ITW secondary vacuum was bad in last two
days after TM4 was connected in ITW. Today
when check the exit 2 module, I found a small |
|
1987
|
Wednesday, September 18, 2019, 14:28 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. | Three of the five targets in the
mini storage have been repackaged into the
stronger pail. |
|
1988
|
Thursday, September 19, 2019, 10:11 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. | Another target in the mini storage
has been repackaged into the new pails. With
one remaining to do which will be done on |
|
1989
|
Monday, September 23, 2019, 13:21 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. | All targets in the mini vault have
been repackaged and are now ready to be loaded
into F-308s. All the target pails have new |
|
1990
|
Monday, September 30, 2019, 11:27 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum vessel modifications completed | The SMP vacuum vessel welds were reinforced
to match the specifications on IRH1710 Rev
D. In addition a tube stub was added |
|
2000
|
Friday, October 04, 2019, 16:43 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS. | TM2 has been connected at TCS this morning.
helium pressure test on Tm2 HS line is done.
No leak. |
|