Friday, February 23, 2024, 06:36, David Wang, ITE, Maintenance, , , ITE entrance module has been disconnected.
|
Friday, February 16, 2024, 11:48, David Wang, Cooling, Maintenance, , , high active water transferr to holding tank
|
Friday, February 16, 2024, 10:57, Adam Newsome, Spent Target Vault, Standard Operation, , , F-308 flask loading - three flasks loaded
|
Thursday, February 15, 2024, 17:40, Carla Babcock, ITE, Standard Operation, , , ITE annual HV testing
|
Thursday, February 15, 2024, 13:52, David Wang, ITW, Standard Operation, , , ITW entrance module and exit 1 module leak check after module move and tank flange orings replacement.
|
Wednesday, February 14, 2024, 11:34, Adam Newsome, Spent Target Vault, Standard Operation, , Misc., Three pails moved from main vault to mini vault
|
Wednesday, February 14, 2024, 11:32, Adam Newsome, Spent Target Vault, Standard Operation, , UCx#43, Spent Target Move
|
Monday, February 12, 2024, 18:44, Carla Babcock, ITW, Maintenance, , , ITW annual HV testing
|
Friday, February 09, 2024, 12:52, Adam Newsome, Spent Target Vault, Standard Operation, , , F-308 flask loading - five flasks loaded
|
Tuesday, February 06, 2024, 13:36, David Wang, ITW, Maintenance, , , ITW exit 1 module tank flange o ring has been replaced.
|
Tuesday, February 06, 2024, 13:28, David Wang, ITW, Maintenance, , , ITW exit 1 module has been disconnected and reconnected for o ring replacement
|
Friday, February 02, 2024, 07:48, David Wang, ITE, Standard Operation, TM4, , ITE primary and secondary vacuum vessel leak check.
|
Friday, January 26, 2024, 16:48, Carla Babcock, South Hot-Cell, Standard Operation, TM4, UC43, UCx#43 PIE
|
Friday, January 26, 2024, 11:57, David Wang, Safe Module Parking, Standard Operation, TM4, , TM4 coil1, 2, and HS electrical check at SMP after module moving.
|
Friday, January 26, 2024, 11:53, David Wang, Safe Module Parking, Standard Operation, TM4, , Tm4 has been moved to SMP.
|
Friday, January 26, 2024, 08:30, David Wang, South Hot-Cell, Standard Operation, TM4, , window line VCR leak check after containment box removal/installation.
|
Thursday, January 25, 2024, 07:31, David Wang, Crane, Standard Operation, , , Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01
|
Thursday, January 25, 2024, 07:27, David Wang, Crane, Standard Operation, , , Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02
|
Thursday, January 25, 2024, 07:24, David Wang, Crane, Standard Operation, , , targe hall annual crane inspection
|
Wednesday, January 24, 2024, 08:34, chad fisher, South Hot-Cell, Repair, TM4, UCx#43, Plating and coating from UCx#43 failure
|
|