ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
1700
|
Monday, April 16, 2018, 14:51 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#55 | Spent Target Move | Ta#55 has been moved from the south
hot cell to the spent target vault. It was
30.4mSv/hr upon removal from the hotcell, |
|
1701
|
Tuesday, April 17, 2018, 11:05 |
David Wang | ITW | Repair | | | Disconnect ITW entrance module | ITW entrance module has been disconnected.
All connections are labelled before or during
disconnection. The 24VDC electrical plug |
|
1702
|
Thursday, April 19, 2018, 10:27 |
Travis Cave | ITW | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
silo. |
|
1703
|
Friday, April 20, 2018, 15:33 |
Keith C Ng | ITW | Repair | | | ITW beam tube repair job | 2A2 window has been removed from ITW and
beamlines has removed the beamtube from the
penetration. The penetration has been sealed |
   |
1704
|
Friday, April 27, 2018, 15:06 |
Keith C Ng | ITW | Repair | | | ITW beam tube repair | Vacuumed out remainder of debris from the
wall penetration, removed cradle and checked
condition. Down stream support bracket sees |
6x |
1705
|
Tuesday, May 01, 2018, 10:54 |
Keith C Ng | ITW | Repair | | | 2a2 window installation and beamtube repair | Yesterday
we installed the 2a2 window, the drive screw
was torqued until 70 ft-lbs and we stopped, |
 |
1710
|
Friday, May 04, 2018, 11:21 |
David Wang | ITW | Repair | | | 2A2 winodw leak check in TH | Anders and I leak checked new 2A2 window
seal on ITW side. Leak detector was connected
to ITW TP4. Base leak rate 0.0Xe-9 |
|
1712
|
Wednesday, May 09, 2018, 08:48 |
David Wang | ITW | Repair | | | 2A2 winodw leak check on ITW vacuum vessel. | Leak detector is connected to ITW TP4.
LD Base leak rate 0.0XE-09 atm.cc/sec. Helium
line is connected to existing window leak |
|
1716
|
Thursday, May 17, 2018, 13:17 |
Travis Cave | ITW | Standard Operation | | | Entrance module move | The west entrance module has been
moved from the silo to the west target station. |
|
1718
|
Tuesday, May 22, 2018, 10:02 |
Anders Mjos | Conditioning Station | Repair | | | Water leak from TK1 over the weekend | Link
to e-log,
Link |
  |
1725
|
Monday, May 28, 2018, 14:06 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#37 | Spent Target Move | SiC#37 has been moved from the South
Hot Cell to the Spent Target Vault. It was
placed in Pail #165 and put in spot 3B of |
|
1738
|
Thursday, June 21, 2018, 17:15 |
Isaac Earle | North Hot-Cell | Development | | | Motorla CP200 radio with throat mic tested in NHC | A Motorla CP200 portable two-way
radio was tested today for use inside the
ISAC hot cells. A High Technology Communications |
|
1739
|
Friday, June 22, 2018, 13:59 |
chad fisher | South Hot-Cell | Repair | | | Soth Hot Cell Fields | Field measurements have been taken to determine
the level before entry for repair of manipulators.
Field on contact at manipulator is |
|
1740
|
Monday, June 25, 2018, 11:31 |
chad fisher | South Hot-Cell | Standard Operation | | | Fields at Al cover | The shield door has been opened and fields
measured at 77 uSv/h on contact at the AL.
panel. |
|
1741
|
Monday, June 25, 2018, 16:42 |
Anders Mjos | Conditioning Station | Development | | | Testing new high current connectors | Shorted TGHT with new high current connector
assembly and heated to 600 A. Temperature
measured on half way point on cable ~ 70 |
|
1742
|
Tuesday, June 26, 2018, 08:56 |
chad fisher | South Hot-Cell | Standard Operation | | | South Hot Cell Fields | hot items have been moved and shielded
as much as possible. Field at left manipulator
has been reduced from 560 uSv/h to 85 uSv/h. |
|
1744
|
Friday, June 29, 2018, 10:12 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator Tong Cable Replacement | Tuesday, June 26 the broken tong cable
was replaced on the west manipulator in the
south hot cell. Wednesday the tong cable |
|
1746
|
Friday, June 29, 2018, 10:27 |
chad fisher | South Hot-Cell | Maintenance | | | South Hot Cell Filter Change | At the end of manipulator repair Thursday
the ventilation pre-filter in the hot cell
was changed. Old filter remains in the hot |
|
1749
|
Tuesday, July 03, 2018, 14:38 |
David Wang | ITW | Standard Operation | | | ITW water signals interlock check. | Annual ITW water signals interlock check
are done. Everything works good. |
|
1756
|
Thursday, July 19, 2018, 14:22 |
Isaac Earle | North Hot-Cell | Development | | | NHC diagnostic signals - connector and wiring details | Installation of the diagnostic connections
between the NHC hot and cold sides has been
completed. The cable bundle was prepared |
|