Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1740     Entry time: Monday, June 25, 2018, 11:31
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Fields at Al cover 

The shield door has been opened and fields measured at 77 uSv/h on contact at the AL. panel.

ELOG V2.9.2-2455