|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
|
465
|
Wednesday, September 25, 2013, 11:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check |
The module was checked electrically this morning before the module move. See the attached PDF for details. |
Attachment 1: TM#3_elec_chk_NiO#2_SHC.PDF
|
|
|
466
|
Wednesday, September 25, 2013, 13:48 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | Electrical check |
Electrical check of TM#3 in the conditioning station under vacuum see attached PDF for details. |
Attachment 1: TM#3_elec_chk_NiO#2_CS.PDF
|
|
|
477
|
Monday, September 30, 2013, 12:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check |
Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details. |
Attachment 1: TM#3_elec_chk_NiO#2_SHC2.PDF
|
|
|
480
|
Monday, September 30, 2013, 16:00 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check |
Travis Cave wrote: |
Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details.
|
There was also a leak check. There was some water remaining in the HS line but once removed the leak cart pumped down to 0.0 x 10-4 Torr and the leak tester was at the bottom limit. There was no response when sprayed with helium |
|
483
|
Tuesday, October 01, 2013, 10:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check |
TM#4 with SiC#29 electrical check post beam see pdf for details. |
Attachment 1: TM#4_elec_chk_SiC#29_SHC_post2.PDF
|
|
|
484
|
Tuesday, October 01, 2013, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | Electrical check |
TM#3 with NiO#2 electrical check at conditioning station under vacuum, see pdf for details. |
Attachment 1: TM#3_elec_chk_NiO#2_CS2.PDF
|
|
|
487
|
Wednesday, October 02, 2013, 14:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check |
Electrical check done on TM#4 with no target, see PDF. |
Attachment 1: TM#4_elec_chk_No_Tgt_SHC.PDF
|
|
|
512
|
Friday, October 18, 2013, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check |
With the coil line removed an electrical check was done on TM#4 at the South Hot Cell see attached pdf. |
Attachment 1: TM#4_no_target_post_coilelectest.PDF
|
|
|
570
|
Wednesday, December 04, 2013, 14:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Electrical check |
Electrical check of TM#4 with Ta#41 post beam at the south hot cell. See PDF for details |
Attachment 1: TM#4_Ta41_electest_SHC_PostBeam.PDF
|
|
|
572
|
Thursday, December 05, 2013, 12:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#8 and no target | Electrical check |
Electrical check was done on TM#4 without a target and with the UC#8 target on see attached PDF for results. |
Attachment 1: TM#4_UC8_electest_SHC.PDF
|
|
Attachment 2: TM#4_notarget_electest_SHC.PDF
|
|
|
631
|
Tuesday, March 25, 2014, 13:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Electrical check |
TM#4 was checked electrically with and without target on it, see attached PDFs for details. |
Attachment 1: TM#4_notarget_electest_SHC.PDF
|
|
Attachment 2: TM#4_Ta42surf_electest_SHC.PDF
|
|
|
634
|
Thursday, March 27, 2014, 10:47 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#42 | Electrical check |
TM#4 with Ta#42 in the conditioning station under vacuum electrical check. |
Attachment 1: TM#4_Ta42surf_electest_CS.PDF
|
|
|
640
|
Monday, April 07, 2014, 10:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check |
TM#3 electrical check at the south hot cell with no target to give us a base line and show that things are ok with the module for the start of the running year. |
Attachment 1: TM#3_elec_test_no_target.PDF
|
|
|
641
|
Monday, April 07, 2014, 11:49 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check |
Electrical test of TM#3 with TiC#4 attached. See PDF. |
Attachment 1: TM#3_elec_test_TiC#4_surf.PDF
|
|
|
667
|
Tuesday, May 27, 2014, 11:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Electrical check |
TM#4 electrical check with Ta#42 attached post beam at the south hot cell. |
Attachment 1: TM4_Ta42_elec_chk_SHC_postbeam.PDF
|
|
|
672
|
Monday, June 02, 2014, 11:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check |
TM#1 with UC#9 electrical check see attached pdf for details. |
Attachment 1: TM1_UC9_elec_chk_SHC.PDF
|
|
|
686
|
Tuesday, June 24, 2014, 11:58 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check |
Electrical check of the TiC#4 on TM#3 post beam at the south hot cell, see attached PDF for details |
Attachment 1: TM3_TiC4_elec_chk_SHC_postbeam.PDF
|
|
|
691
|
Wednesday, June 25, 2014, 13:46 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Electrical check |
Electrical check of TM#3 after the insulator repair. See attached PDF for details. |
Attachment 1: TM3electestsinsulrepair.PDF
|
|
|
693
|
Thursday, June 26, 2014, 11:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Electrical check |
Electrical check of the TM#3 with SiC#30 attached. Also an electrical check of TM#3 after the cleaning of ground electrode with no target attached. |
Attachment 1: TM3_SiC30_elecSHC.PDF
|
|
Attachment 2: TM3_elecchkaftclean.PDF
|
|
|
703
|
Wednesday, July 16, 2014, 13:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check |
Electrical check of the TM#1 with UC#9 post beam at the south hot cell. |
Attachment 1: TM1_UC9_Elecchk_postbeam.PDF
|
|